Highway Construction — Charlton, Georgia

WD GA20260212-16504-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORM WORK in Charlton, Georgia (construction type: highway) is $15.00/hr base + $0.00/hr fringe = $15.00/hr total package (WD GA20260212-16504-hwy, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: GA20260212-16504-hwy
Revision: 1
Construction Type: highway
State: Georgia (GA)
County: Charlton
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference GA20260212View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORM WORK $15.00 $0.00 $15.00 -38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.74 $0.00 $14.74 -35% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $11.45 $0.00 $11.45 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $11.30 $0.00 $11.30 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $14.34 $0.00 $14.34 $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.87 $0.00 $15.87 -42% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $15.36 $0.00 $15.36 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT $12.56 $0.30 $12.86 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDES EROSION CONTROL $10.72 $0.00 $10.72 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $11.70 $0.00 $11.70 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.31 $0.00 $12.31 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.91 $0.00 $12.91 -29% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.25 $2.16 $17.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $11.25 $0.00 $11.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.47 $0.00 $13.47 $0.00 $0.00 $0.00 $0.00
OPERATOR: COMPACTOR $12.82 $2.29 $15.11 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $21.52 $0.00 $21.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $15.49 $4.70 $20.19 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $16.42 $3.79 $20.21 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $11.72 $0.00 $11.72 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.71 $0.00 $13.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $19.39 $0.00 $19.39 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $19.87 $0.00 $19.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE GROUNDSMAN $17.82 $0.00 $17.82 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $14.42 $0.00 $14.42 $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $20.34 $2.86 $23.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.94 $0.00 $11.94 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $11.30 $0.00 $11.30 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $13.98 $0.00 $13.98 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $11.59 $0.00 $11.59 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $12.37 $0.60 $12.97 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.86 $0.00 $12.86 -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $15.22 $0.00 $15.22 Above median -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: HYDROSEEDER TRUCK $11.23 $0.00 $11.23 Top 10% -59% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $16.40 $0.00 $16.40 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP TRUCK $17.16 $0.00 $17.16 Above median -37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $16.99 $0.00 $16.99 Above median -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.81 $0.00 $12.81 -53% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Charlton, GA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Charlton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260212-16504-hwy →