Highway Construction — Brantley, Georgia

WD GA20260065-16502-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Brantley, Georgia (construction type: highway) is $32.68/hr base + $0.00/hr fringe = $32.68/hr total package (WD GA20260065-16502-hwy, Rev. 1).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: GA20260065-16502-hwy
Revision: 1
Construction Type: highway
State: Georgia (GA)
County: Brantley
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference GA20260065View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $32.68 $0.00 $32.68 +35% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.44 $0.00 $28.44 +25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.72 $2.23 $18.95 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.46 $0.00 $18.46 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $22.42 $0.00 $22.42 Above median +23% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $23.40 $3.73 $27.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $22.82 $0.00 $22.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $39.31 $0.00 $39.31 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $26.31 $5.43 $31.74 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.81 $1.91 $24.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.22 $4.10 $27.32 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $18.51 $3.99 $22.50 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $14.64 $0.00 $14.64 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $21.58 $3.58 $25.16 Above median -7% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Brantley, GA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Brantley

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for GA20260065-16502-hwy →