Building Construction — Suwannee, Florida

WD FL20260025-16500-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Suwannee, Florida (construction type: building) is $14.79/hr base + $1.81/hr fringe = $16.60/hr total package (WD FL20260025-16500-bld, Rev. 1).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: FL20260025-16500-bld
Revision: 1
Construction Type: building
State: Florida (FL)
County: Suwannee
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference FL20260025View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.79 $1.81 $16.60 -28% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.79 $0.00 $16.79 -25% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.50 $13.85 $47.35 +85% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING $29.50 $12.98 $42.48 Bottom 10% +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.95 $0.00 $9.95 -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.42 $1.95 $13.37 -32% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $13.19 $0.00 $13.19 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $35.41 $13.60 $49.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $9.58 $0.00 $9.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $10.10 $0.00 $10.10 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $12.27 $3.33 $15.60 -36% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY $12.00 $0.00 $12.00 Top 10% -46% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION A: HOLIDAY PAY: NEW YEAR'S DAY, MEMORIAL DAY, JULY FOURTH, LABOR DAY, THANKSGIVING DAY, DAY AFTER $31.64 $15.98 $47.62 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY $8.00 $0.15 $8.15 Top 10% -66% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Suwannee, FL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Suwannee

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260025-16500-bld →