Residential Construction — Polk, Florida

WD FL20260082-16539-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Polk, Florida (construction type: residential) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD FL20260082-16539-res, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: FL20260082-16539-res
Revision: 1
Construction Type: residential
State: Florida (FL)
County: Polk
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference FL20260082View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.00 $0.00 $20.00 -17% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES CABINET INSTALLATION $11.37 $0.00 $11.37 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.14 $0.00 $15.14 -32% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $12.66 $0.00 $12.66 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $12.60 $0.00 $12.60 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $35.25 $17.32 $52.57 +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.85 $0.00 $9.85 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $8.26 $0.00 $8.26 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.51 $0.00 $11.51 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.46 $0.00 $10.46 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.79 $0.00 $11.79 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $9.00 $0.00 $9.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $12.07 $0.00 $12.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $17.04 $0.00 $17.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $12.56 $0.00 $12.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $12.14 $0.00 $12.14 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.57 $0.00 $11.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.38 $0.00 $17.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.50 $0.00 $15.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $11.59 $0.00 $11.59 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.02 $0.00 $11.02 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $11.08 $0.00 $11.08 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $15.68 $0.00 $15.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.20 $0.00 $10.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $13.22 $0.00 $13.22 -46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM JOURNEYMAN OILER SHALL BE PAID: 90% $39.01 $16.85 $55.86 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES $38.01 $16.85 $54.86 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE JOURNEYMAN OILER SHALL BE PAID: 90% OF GROUP 3'S RATE $37.01 $16.85 $53.86 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS $13.33 $0.00 $13.33 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: METAL ROOF $16.99 $0.00 $16.99 Top 10% -24% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION $9.50 $0.00 $9.50 Bottom 10% -60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP TRUCK $10.22 $0.00 $10.22 Above median -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.10 $0.00 $12.10 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Polk, FL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Polk

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260082-16539-res →