Highway Construction — Palm Beach, Florida

WD FL20260264-16478-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Palm Beach, Florida (construction type: highway) is $19.98/hr base + $0.00/hr fringe = $19.98/hr total package (WD FL20260264-16478-hwy, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: FL20260264-16478-hwy
Revision: 1
Construction Type: highway
State: Florida (FL)
County: Palm Beach
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference FL20260264View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $19.98 $0.00 $19.98 -14% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.11 $0.00 $20.11 -10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $27.05 $0.00 $27.05 +6% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $24.44 $0.00 $24.44 Bottom 10% -5% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.65 $0.00 $16.65 Above median -15% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $16.94 $0.00 $16.94 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $17.21 $0.00 $17.21 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $20.24 $2.01 $22.25 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.15 $0.00 $17.15 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.96 $2.32 $24.28 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $17.10 $0.00 $17.10 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOOM $33.61 $11.50 $45.11 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $16.46 $0.00 $16.46 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.52 $0.00 $20.52 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $34.84 $0.00 $34.84 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $19.25 $0.00 $19.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.83 $0.00 $17.83 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $29.69 $0.00 $29.69 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $19.68 $0.00 $19.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $21.74 $0.00 $21.74 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $22.02 $0.00 $22.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.82 $0.00 $16.82 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $15.54 $0.00 $15.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $19.24 $0.00 $19.24 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $16.91 $0.66 $17.57 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $21.02 $0.00 $21.02 -5% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $16.68 $0.00 $16.68 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR TRUCK $19.02 $0.00 $19.02 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.53 $0.00 $16.53 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.46 $0.00 $19.46 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $21.36 $2.45 $23.81 Above median -1% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $16.55 $0.00 $16.55 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $18.27 $0.00 $18.27 Above median -24% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Palm Beach, FL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Palm Beach

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260264-16478-hwy →