Residential Construction — Orange, Florida

WD FL20260077-16527-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Orange, Florida (construction type: residential) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD FL20260077-16527-res, Rev. 1).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: FL20260077-16527-res
Revision: 1
Construction Type: residential
State: Florida (FL)
County: Orange
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference FL20260077View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.00 $0.00 $20.00 -17% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $11.85 $3.29 $15.14 -35% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.19 $0.00 $12.19 -45% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $11.98 $0.00 $11.98 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $13.50 $1.06 $14.56 Above median $0.00 $0.00 $0.00 $0.00
FORM WORKER $14.00 $0.54 $14.54 Above median $0.00 $0.00 $0.00 $0.00
INSULATOR: BATT AND BLOWN $12.01 $0.00 $12.01 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $12.60 $0.00 $12.60 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.88 $0.00 $16.88 -35% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $31.50 $16.45 $47.95 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.50 $0.00 $9.50 -52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $9.15 $0.00 $9.15 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.51 $0.00 $11.51 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.46 $0.00 $10.46 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.79 $0.00 $11.79 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $9.00 $0.00 $9.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $12.07 $0.00 $12.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $17.04 $0.00 $17.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $12.56 $0.00 $12.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $12.14 $0.00 $12.14 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.57 $0.00 $11.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.38 $0.00 $17.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.50 $0.00 $15.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $11.10 $0.00 $11.10 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $11.02 $0.00 $11.02 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $11.08 $0.00 $11.08 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $15.68 $0.00 $15.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.20 $0.00 $10.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $13.61 $0.00 $13.61 -39% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $13.59 $0.00 $13.59 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $15.04 $0.00 $15.04 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $35.41 $13.60 $49.01 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $23.05 $13.60 $36.65 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS $13.33 $0.00 $13.33 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: METAL ROOF $16.99 $0.00 $16.99 Top 10% -24% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION $9.95 $0.00 $9.95 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP TRUCK $10.22 $0.00 $10.22 Above median -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 4 AXLE TRUCK $11.78 $0.00 $11.78 -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.10 $0.00 $12.10 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Orange, FL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Orange

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260077-16527-res →