Highway Construction — Monroe, Florida

WD FL20260238-16511-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Monroe, Florida (construction type: highway) is $15.61/hr base + $0.00/hr fringe = $15.61/hr total package (WD FL20260238-16511-hwy, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: FL20260238-16511-hwy
Revision: 1
Construction Type: highway
State: Florida (FL)
County: Monroe
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference FL20260238View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $15.61 $0.00 $15.61 -32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.00 $0.82 $20.82 -7% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.13 $3.31 $24.44 -4% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $14.90 $0.00 $14.90 -24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.10 $0.00 $14.10 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $14.67 $0.00 $14.67 -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.00 $0.70 $17.70 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.23 $0.74 $17.97 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $17.19 $1.45 $18.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $14.60 $0.00 $14.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.91 $0.00 $15.91 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $32.96 $0.00 $32.96 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $18.46 $0.00 $18.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.63 $0.00 $15.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $16.10 $0.68 $16.78 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $18.31 $2.22 $20.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.51 $0.00 $16.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.38 $0.00 $15.38 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $18.29 $0.00 $18.29 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $15.00 $0.64 $15.64 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR TRUCK $19.84 $0.00 $19.84 -17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.89 $3.75 $19.64 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $20.99 $0.95 $21.94 Above median -9% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $17.87 $0.00 $17.87 Above median -26% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Monroe, FL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Monroe

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260238-16511-hwy →