Building Construction — Glades, Florida

WD FL20260012-16474-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Glades, Florida (construction type: building) is $15.08/hr base + $5.07/hr fringe = $20.15/hr total package (WD FL20260012-16474-bld, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: FL20260012-16474-bld
Revision: 1
Construction Type: building
State: Florida (FL)
County: Glades
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference FL20260012View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $15.08 $5.07 $20.15 -13% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.45 $0.00 $12.45 -44% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.25 $15.20 $55.45 +117% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $9.94 $0.00 $9.94 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING $28.90 $15.66 $44.56 +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.62 $0.00 $8.62 -56% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $10.45 $0.00 $10.45 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $16.98 $0.00 $16.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.57 $14.90 $52.47 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $39.38 $14.90 $54.28 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $40.40 $14.90 $55.30 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.07 $14.90 $51.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $9.58 $0.00 $9.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PUMP $11.00 $0.00 $11.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $27.00 $14.78 $41.78 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER AND SPRAY $11.21 $0.00 $11.21 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $12.27 $3.33 $15.60 -36% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $29.10 $14.68 $43.78 +85% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 10.75 1.16 ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY $14.33 $0.00 $14.33 -39% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $35.03 $24.00 $59.03 +143% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY $8.00 $0.15 $8.15 Top 10% -66% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Glades, FL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Glades

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260012-16474-bld →