Highway Construction — Gilchrist, Florida
WD FL20260276-16484-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Gilchrist, Florida (construction type: highway) is $18.98/hr base + $0.00/hr fringe = $18.98/hr total package (WD FL20260276-16484-hwy, Rev. 1).
Scroll down for all 33 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $18.98 | $0.00 | $18.98 -18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $20.00 | $0.82 | $20.82 -7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $29.05 | $11.18 | $40.23 +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $24.16 | $0.00 | $24.16 Bottom 10% -7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.39 | $0.00 | $16.39 Above median -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $15.01 | $0.00 | $15.01 Above median -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER | $17.21 | $0.00 | $17.21 Above median -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $20.24 | $2.01 | $22.25 Above median +13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $17.00 | $0.70 | $17.70 Above median -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.39 | $0.00 | $19.39 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $15.85 | $0.00 | $15.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOOM | $33.61 | $11.50 | $45.11 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $15.13 | $0.00 | $15.13 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $19.10 | $0.00 | $19.10 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $29.95 | $0.00 | $29.95 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $19.34 | $0.00 | $19.34 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $17.78 | $0.00 | $17.78 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $31.30 | $0.00 | $31.30 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $19.68 | $0.00 | $19.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $17.77 | $0.00 | $17.77 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PILEDRIVER | $22.98 | $0.00 | $22.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $15.51 | $0.00 | $15.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $15.54 | $0.00 | $15.54 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $18.80 | $0.00 | $18.80 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $16.91 | $0.66 | $17.57 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $21.02 | $0.00 | $21.02 -5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL PERSON | $16.13 | $0.00 | $16.13 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DISTRIBUTOR TRUCK | $19.18 | $0.00 | $19.18 -20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $18.00 | $0.74 | $18.74 Above median -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLATBED TRUCK | $19.46 | $0.00 | $19.46 Above median -19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $22.16 | $0.00 | $22.16 Above median -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $16.91 | $0.00 | $16.91 Above median -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $18.27 | $0.00 | $18.27 Above median -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Gilchrist, FL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Gilchrist
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Gilchrist, Florida.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.