Building Construction — Franklin, Florida

WD FL20260011-16514-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Franklin, Florida (construction type: building) is $12.92/hr base + $0.00/hr fringe = $12.92/hr total package (WD FL20260011-16514-bld, Rev. 1).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: FL20260011-16514-bld
Revision: 1
Construction Type: building
State: Florida (FL)
County: Franklin
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference FL20260011View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $12.92 $0.00 $12.92 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.50 $0.00 $11.50 -49% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.50 $13.85 $47.35 +85% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING $29.50 $12.98 $42.48 Bottom 10% +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.14 $0.00 $8.14 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.42 $1.95 $13.37 -32% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $12.43 $0.00 $12.43 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $35.41 $13.60 $49.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $9.58 $0.00 $9.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $10.10 $0.00 $10.10 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $15.90 $0.00 $15.90 Bottom 10% -30% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $10.48 $2.06 $12.54 -48% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 11.72 2.19 ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY $12.00 $0.00 $12.00 -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY $8.00 $0.15 $8.15 Top 10% -66% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Franklin, FL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Franklin

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260011-16514-bld →