Residential Construction — Escambia, Florida

WD FL20260061-16513-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/OR 600 TON CAPACITY - ADDITIONAL $1.45 PER HOUR in Escambia, Florida (construction type: residential) is $32.75/hr base + $14.55/hr fringe = $47.30/hr total package (WD FL20260061-16513-res, Rev. 1).

Scroll down for all 36 trade classifications covered by this determination.

WD Number: FL20260061-16513-res
Revision: 1
Construction Type: residential
State: Florida (FL)
County: Escambia
Effective: May 17, 2026
Trades covered: 36
Official source: SAM.gov reference FL20260061View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/OR 600 TON CAPACITY - ADDITIONAL $1.45 PER HOUR $32.75 $14.55 $47.30 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.00 $0.00 $20.00 -17% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING $12.95 $0.00 $12.95 -44% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $11.88 $0.00 $11.88 -47% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $13.00 $0.00 $13.00 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $13.70 $0.00 $13.70 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $10.92 $0.17 $11.09 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.41 $0.00 $10.41 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $9.15 $0.00 $9.15 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.51 $0.00 $11.51 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.46 $0.00 $10.46 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $10.06 $0.00 $10.06 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $9.00 $0.00 $9.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $11.63 $0.00 $11.63 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $17.04 $0.00 $17.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $13.67 $0.00 $13.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.41 $0.00 $11.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $13.50 $0.00 $13.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.50 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.50 $0.00 $15.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.53 $0.00 $13.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.58 $0.00 $10.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $10.93 $0.00 $10.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $15.68 $0.00 $15.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.20 $0.00 $10.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY $10.00 $0.00 $10.00 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $13.24 $0.00 $13.24 -46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $30.25 $14.55 $44.80 +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANES UNDER 100 TONS CRANES WITH 350 FEET OR MORE BOOM AND/OR 400 TON CAPACITY - ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 $30.25 $14.55 $44.80 +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER CRANES WITH 350 FEET OR MORE BOOM AND/OR 400 TON CAPACITY - ADDITIONAL $1.10 PER HOUR. CRANES WITH 500 FEET BOOM AND/O $28.95 $14.55 $43.50 +86% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS $10.71 $0.00 $10.71 -52% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: METAL ROOF $16.99 $0.00 $16.99 Top 10% -24% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $24.22 $13.89 $38.11 $0.00 $0.00 $0.00 $0.00
TILE SETTER $12.29 $0.00 $12.29 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP TRUCK $9.59 $0.00 $9.59 -60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.10 $0.00 $12.10 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Escambia, FL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Escambia

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260061-16513-res →