Building Construction — De Soto, Florida

WD FL20260009-16531-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in De Soto, Florida (construction type: building) is $15.08/hr base + $5.07/hr fringe = $20.15/hr total package (WD FL20260009-16531-bld, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: FL20260009-16531-bld
Revision: 1
Construction Type: building
State: Florida (FL)
County: De Soto
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference FL20260009View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $15.08 $5.07 $20.15 -13% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.45 $0.00 $12.45 -44% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $33.11 $14.59 $47.70 +87% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $9.94 $0.00 $9.94 Bottom 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $35.25 $17.32 $52.57 +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.62 $0.00 $8.62 -56% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $10.45 $0.00 $10.45 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $16.98 $0.00 $16.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $9.58 $0.00 $9.58 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH ONLY $18.00 $12.36 $30.36 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER AND SPRAY $11.21 $0.00 $11.21 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $12.27 $3.33 $15.60 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1: 150 TON LATTICE, 250 TON HYDRO, FRICTION, TOWER AND LUFFING CRANES, 300+ FT BOOM $39.01 $16.85 $55.86 +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LATTICE UNDER 150 TON, 100 TON UP TO 250 TON HYDRO CRANES $38.01 $16.85 $54.86 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES NOT DESCRIBED ABOVE $37.01 $16.85 $53.86 +130% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $25.75 $16.92 $42.67 +80% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 14.41 3.61 ROOFER: BUILT UP, COMPOSITION, HOT TAR AND SINGLE PLY $14.33 $0.00 $14.33 -39% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $35.03 $24.00 $59.03 +143% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP AND 10 YARD HAUL AWAY $8.00 $0.15 $8.15 Top 10% -66% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the De Soto, FL — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in De Soto

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260009-16531-bld →