Residential Construction — Collier, Florida

WD FL20260059-16509-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Collier, Florida (construction type: residential) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD FL20260059-16509-res, Rev. 1).

Scroll down for all 36 trade classifications covered by this determination.

WD Number: FL20260059-16509-res
Revision: 1
Construction Type: residential
State: Florida (FL)
County: Collier
Effective: May 17, 2026
Trades covered: 36
Official source: SAM.gov reference FL20260059View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.00 $0.00 $20.00 -17% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $13.66 $2.67 $16.33 -29% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.83 $0.00 $12.83 -43% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $13.15 $0.00 $13.15 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $15.25 $0.00 $15.25 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND REINFORCING $28.84 $15.72 $44.56 +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.18 $0.00 $9.18 -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $13.54 $0.00 $13.54 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.51 $0.00 $11.51 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.94 $0.00 $10.94 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $15.14 $0.00 $15.14 -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $9.00 $0.00 $9.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $12.40 $0.00 $12.40 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $17.04 $0.00 $17.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $15.25 $0.00 $15.25 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $14.50 $2.00 $16.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.57 $14.90 $52.47 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $39.38 $14.90 $54.28 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $40.40 $14.90 $55.30 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $37.07 $14.90 $51.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.41 $0.00 $11.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.50 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.00 $0.00 $14.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.17 $0.00 $12.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $27.53 $14.90 $42.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.62 $0.00 $10.62 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $10.93 $0.00 $10.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $14.81 $0.00 $14.81 $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.20 $0.00 $10.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $14.56 $0.00 $14.56 -34% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $13.45 $0.00 $13.45 -45% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS $15.65 $0.00 $15.65 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: METAL ROOF $16.99 $0.00 $16.99 Top 10% -24% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION $9.85 $0.38 $10.23 Above median -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP TRUCK $10.22 $0.00 $10.22 Above median -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.10 $0.00 $12.10 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Collier, FL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Collier

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260059-16509-res →