Highway Construction — Clay, Florida

WD FL20260244-16491-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Clay, Florida (construction type: highway) is $19.33/hr base + $0.00/hr fringe = $19.33/hr total package (WD FL20260244-16491-hwy, Rev. 1).

Scroll down for all 32 trade classifications covered by this determination.

WD Number: FL20260244-16491-hwy
Revision: 1
Construction Type: highway
State: Florida (FL)
County: Clay
Effective: May 17, 2026
Trades covered: 32
Official source: SAM.gov reference FL20260244View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $19.33 $0.00 $19.33 -16% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.00 $0.82 $20.82 -7% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $24.16 $0.00 $24.16 Bottom 10% -7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.33 $0.00 $16.33 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.39 $0.00 $15.39 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $17.21 $0.00 $17.21 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $20.24 $2.01 $22.25 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.00 $0.70 $17.70 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.16 $0.00 $19.16 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $15.85 $0.00 $15.85 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOOM $33.61 $11.50 $45.11 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $15.13 $0.00 $15.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.03 $0.00 $19.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $29.95 $0.00 $29.95 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $19.34 $0.00 $19.34 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.87 $0.00 $16.87 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $31.30 $0.00 $31.30 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $19.68 $0.00 $19.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $17.77 $0.00 $17.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $22.98 $0.00 $22.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.21 $0.00 $15.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $15.54 $0.00 $15.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $18.35 $0.00 $18.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $16.91 $0.66 $17.57 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $21.02 $0.00 $21.02 -5% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $14.91 $0.00 $14.91 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR TRUCK $19.18 $0.00 $19.18 -20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.00 $0.74 $18.74 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.46 $0.00 $19.46 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $22.16 $0.00 $22.16 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $16.91 $0.00 $16.91 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $18.27 $0.00 $18.27 Above median -24% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Clay, FL — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Clay

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260244-16491-hwy →