Residential Construction — Brevard, Florida
WD FL20260055-16507-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Brevard, Florida (construction type: residential) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD FL20260055-16507-res, Rev. 1).
Scroll down for all 34 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $20.00 | $0.00 | $20.00 -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $13.46 | $0.54 | $14.00 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $12.56 | $0.00 | $12.56 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $12.66 | $0.00 | $12.66 Bottom 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, ORNAMENTAL | $12.60 | $0.00 | $12.60 Bottom 10% -51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, REINFORCING | $16.88 | $0.00 | $16.88 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $31.50 | $16.45 | $47.95 Above median +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.00 | $0.00 | $10.00 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $9.15 | $0.00 | $9.15 Bottom 10% -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $11.51 | $0.00 | $11.51 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.46 | $0.00 | $10.46 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $11.79 | $0.00 | $11.79 -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ROOF TEAROFF | $9.00 | $0.00 | $9.00 Bottom 10% -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ASPHALT PAVER | $12.07 | $0.00 | $12.07 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE LOADER COMBO | $17.04 | $0.00 | $17.04 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR | $12.56 | $0.00 | $12.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $12.14 | $0.00 | $12.14 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DISTRIBUTOR | $11.57 | $0.00 | $11.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $17.38 | $0.00 | $17.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $15.50 | $0.00 | $15.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $11.70 | $0.00 | $11.70 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $11.02 | $0.00 | $11.02 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCREED | $11.08 | $0.00 | $11.08 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACKHOE | $15.68 | $0.00 | $15.68 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $10.20 | $0.00 | $10.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $13.61 | $0.00 | $13.61 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $13.54 | $0.00 | $13.54 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $36.00 | $15.10 | $51.10 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $24.50 | $15.10 | $39.60 Above median +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS | $13.33 | $0.00 | $13.33 Above median -40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: METAL ROOF | $16.99 | $0.00 | $16.99 Top 10% -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES METAL ROOF INSTALLATION | $9.81 | $0.00 | $9.81 Bottom 10% -59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $10.22 | $0.00 | $10.22 Above median -57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $12.10 | $0.00 | $12.10 Bottom 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Brevard, FL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Brevard, Florida.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.