Residential Construction — Baker, Florida

WD FL20260053-16490-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 14.14 0.00 BRICKLAYER in Baker, Florida (construction type: residential) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD FL20260053-16490-res, Rev. 1).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: FL20260053-16490-res
Revision: 1
Construction Type: residential
State: Florida (FL)
County: Baker
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference FL20260053View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 14.14 0.00 BRICKLAYER $20.00 $0.00 $20.00 -13% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $12.97 $0.00 $12.97 -42% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $16.13 $0.00 $16.13 -16% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $12.35 $0.00 $12.35 -45% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $11.79 $0.00 $11.79 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $10.00 $0.00 $10.00 -59% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $12.00 $0.46 $12.46 $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $13.99 $0.00 $13.99 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $10.12 $0.00 $10.12 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.00 $0.00 $9.00 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $8.05 $0.00 $8.05 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.51 $0.00 $11.51 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.46 $0.00 $10.46 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.93 $0.00 $11.93 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $9.00 $0.00 $9.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
LATHER $14.20 $0.00 $14.20 $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $11.63 $0.00 $11.63 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE LOADER COMBO $17.04 $0.00 $17.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR $12.72 $0.00 $12.72 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $12.40 $0.00 $12.40 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $11.41 $0.00 $11.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $17.50 $0.00 $17.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.50 $0.00 $15.50 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.75 $0.00 $12.75 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $10.59 $0.00 $10.59 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $10.93 $0.00 $10.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $15.68 $0.00 $15.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $10.20 $0.00 $10.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: INCLUDES BRUSH, ROLLER AND SPRAY $10.68 $0.00 $10.68 Above median -52% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $15.10 $0.00 $15.10 Bottom 10% -34% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDING HVAC PIPE INSTALLATION $37.50 $17.59 $55.09 +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $35.41 $13.60 $49.01 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $23.05 $13.60 $36.65 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES BUILT UP, MODIFIED BITUMEN, AND SHAKE & SHINGLE ROOFS $9.68 $0.00 $9.68 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: METAL ROOF $16.99 $0.00 $16.99 Top 10% -24% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $31.64 $15.98 $47.62 +101% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $12.46 $0.00 $12.46 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP TRUCK $10.62 $0.00 $10.62 Above median -56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $12.14 $0.00 $12.14 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Baker, FL — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Baker

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for FL20260053-16490-res →