Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Washington, D.C., District of Columbia (construction type: building) is $38.80/hr base + $15.17/hr fringe = $53.97/hr total package (WD DC20260002-20008-bld, Rev. 3).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: DC20260002-20008-bld
Revision: 3
Construction Type: building
State: District of Columbia (DC)
County: Washington, D.C.
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference DC20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $38.80 $15.17 $53.97 +75% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDES DRYWALL HANGING, FORM WORK, AND SOFT FLOOR LAYING-CARPET $34.41 $14.33 $48.74 +53% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.50 $14.23 $44.73 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $57.16 $38.44 $95.60 $0.00 $0.00 $0.00 $0.00
ELECTRICAL INSTALLER SCOPE OF WORK: INCLUDES LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING OUTSIDE $34.16 $13.54 $47.70 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS $59.50 $23.06 $82.56 +110% vs market $0.00 $0.00 $0.00 $0.00
FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDE $30.21 $10.43 $40.64 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $36.65 $14.46 $51.11 +39% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER: GLAZING CONTRACTS $2 MILLION AND UNDER $32.41 $14.46 $46.87 +28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $31.88 $23.78 $55.66 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $37.86 $25.86 $63.72 Above median +114% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.04 $2.80 $15.84 Above median -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.40 $2.85 $18.25 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER FOR POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES; EXCLUDES POINTING, CAULKING AND CLEANI $11.67 $0.00 $11.67 -51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SKILLED $30.47 $8.70 $39.17 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
MARBLE/STONE MASON INCLUDING POINTING, CAULKING AND CLEANING OF ALL TYPES OF MASONRY, BRICK, STONE AND CEMENT EXCEPT POINTING, CAULKING, CLEANING OF E $45.65 $21.21 $66.86 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $39.50 $17.32 $56.82 $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $36.60 $14.47 $51.07 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDES HVAC PIPE INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY $55.00 $24.46 $79.46 +102% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $32.86 $10.46 $43.32 $0.00 $0.00 $0.00 $0.00
PLUMBER A. PAID HOLIDAYS: LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND THE DAY AFTER THANKSGIVING, CHRISTMAS DAY, NEW YEAR'S DAY, MARTIN LUTHER KING $53.30 $23.71 $77.01 +95% vs market $0.00 $0.00 $0.00 $0.00
POINTER, CAULKER, CLEANER, INCLUDES POINTING, CAULKING, CLEANING OF EXISTING MASONRY, BRICK, STONE AND CEMENT STRUCTURES; EXCLUDES POINTING, CAULKING $18.88 $0.00 $18.88 $0.00 $0.00 $0.00 $0.00
ROOFER $36.26 $14.91 $51.17 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY $53.42 $23.20 $76.62 +108% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.22 $27.69 $72.91 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $28.85 $12.55 $41.40 Above median $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $34.34 $14.20 $48.54 Bottom 10% $0.00 $0.00 $0.00 $0.00
TILE FINISHER $28.85 $12.55 $41.40 $0.00 $0.00 $0.00 $0.00
TILE SETTER $34.34 $14.20 $48.54 Above median $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Washington, D.C., DC — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Washington, D.C.

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for DC20260002-20008-bld →