Highway Construction — Kent, Delaware

WD DE20260004-16447-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Kent, Delaware (construction type: highway) is $50.70/hr base + $3.74/hr fringe = $54.44/hr total package (WD DE20260004-16447-hwy, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: DE20260004-16447-hwy
Revision: 1
Construction Type: highway
State: Delaware (DE)
County: Kent
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference DE20260004View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $50.70 $3.74 $54.44 +85% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $34.85 $1.34 $36.19 Above median +43% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $65.86 $0.00 $65.86 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $54.81 $2.11 $56.92 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $49.64 $0.00 $49.64 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER $31.15 $16.50 $47.65 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $34.24 $5.00 $39.24 Top 10% +79% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $43.30 $2.06 $45.36 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $42.29 $1.63 $43.92 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $42.29 $1.63 $43.92 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $35.18 $14.27 $49.45 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $38.36 $4.31 $42.67 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $28.11 $11.18 $39.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $34.01 $12.25 $46.26 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $35.07 $17.17 $52.24 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $45.81 $31.38 $77.19 Top 10% +183% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL $43.76 $30.77 $74.53 Top 10% +174% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: POUNDER $43.76 $30.77 $74.53 +174% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $43.40 $30.66 $74.06 Top 10% +172% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $39.45 $0.00 $39.45 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $22.89 $9.05 $31.94 Top 10% +14% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Kent, DE — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Kent

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for DE20260004-16447-hwy →