Highway Construction — Middlesex, Connecticut

WD CT20260001-16435-hwy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Middlesex, Connecticut (construction type: highway) is $46.09/hr base + $36.29/hr fringe = $82.38/hr total package (WD CT20260001-16435-hwy, Rev. 2).

Scroll down for all 67 trade classifications covered by this determination.

WD Number: CT20260001-16435-hwy
Revision: 2
Construction Type: highway
State: Connecticut (CT)
County: Middlesex
Effective: May 17, 2026
Trades covered: 67
Official source: SAM.gov reference CT20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $46.09 $36.29 $82.38 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: CARPENTERS, PILEDRIVERS $42.03 $29.19 $71.22 +133% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVER TENDERS $42.03 $29.19 $71.22 +133% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVERS $50.49 $29.19 $79.68 Bottom 10% +161% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS:: CARPENTERS, PILEDRIVERS (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETH $42.03 $29.19 $71.22 +133% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS:: DIVER TENDERS (LITCHFIELD COUNTY HARWINTON, PLYMOUTH, THOMASTON, WATERTOWN MIDDLESEX COUNTY NEW HAVEN COUNTY BEACON FALLS, BETHANY, BRANF $42.03 $29.19 $71.22 +133% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (FAIRFIELD COUNTY) $45.00 $36.63 $81.63 +121% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $46.48 $38.05 $84.53 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $47.40 $36.74 $84.14 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS (MIDDLESEX COUNTY; TOLLAND COUNTY; WINDHAM COUNTY) $48.25 $36.67 $84.92 +130% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: REINFORCING, STRUCTURAL AND PRECAST CONCRETE ERECTION. PAID HOLIDAY: LABOR DAY PROVIDED EMPLOYEE HAS BEEN ON THE PAYROLL FOR THE 5 CONSEC $45.25 $43.62 $88.87 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 LABORERS, CONCRETE SPECIALIST $35.70 $28.85 $64.55 +160% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 CHAIN SAW OPERATORS, FENCE AND GUARD RAIL ERECTORS, PNEUMATIC TOOL OPERATORS AND POWDERMEN $35.95 $28.85 $64.80 +161% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 PIPELAYERS, JACKHAMMER/PAVEMENT BREAKER, MASON TENDERS/CATCH BASIN BUILDERS, ASPHALT RAKERS, AIR TRACK OPERATORS, BLOCK PAVER AND CU $36.20 $28.85 $65.05 +162% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 ASBESTOS/LEAD REMOVAL $38.70 $28.85 $67.55 +172% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 BLASTERS $37.45 $28.85 $66.30 +167% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 TOXIC WASTE REMOVER $37.70 $28.85 $66.55 +168% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 7 TRAFFIC CONTROL SIGNALMAN $21.42 $28.85 $50.27 +102% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 8: ACETYLENE BURNER $36.70 $28.85 $65.55 +164% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 9: TOXIC WASTE REMOVERS A OR B WITH PPE $38.70 $28.85 $67.55 +172% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: CONCRETE WORKERS, FORM MOVERS AND STRIPPERS A. PAID HOLIDAYS: ON TUNNEL WORK ON $36.96 $28.85 $65.81 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: CLEANING, CONCRETE AND CAULKING TUNNEL: FORM ERECTORS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, MEMORIAL D $37.29 $28.85 $66.14 Top 10% +166% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: BRAKEMEN, TRACKMEN, TUNNEL LABORERS, SHAFT LABORERS A. PAI $36.96 $28.85 $65.81 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: LABORERS TOPSIDE, CAGE TENDERS, BELLMAN A. PAID HOLIDAYS $36.85 $28.85 $65.70 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: ROCK SHAFT, CONCRETE, LINING OF SAME AND TUNNEL IN FREE AIR: MINERS A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S D $37.93 $28.85 $66.78 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: BRAKEMEN AND TRACKMEN A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR $36.96 $28.85 $65.81 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: SHIELD DRIVE AND LINER PLATE TUNNELS IN FREE AIR: MINERS, MOTORMEN, MUCKING MACHINE OPERATORS, NOZZLEMEN, GROUT MEN, SH $37.93 $28.85 $66.78 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BLASTER A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: NEW YEAR'S DAY, ME $44.42 $28.85 $73.27 Top 10% +195% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: BRAKEMEN, TRACKMEN, GROUTMAN, LABORERS, OUTSIDE LOCK TENDER, GAUG $44.22 $28.85 $73.07 Top 10% +194% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: CHANGE HOUSE ATTENDANTS, POWDER WATCHMEN, TOP ON IRON BOLT A. PAI $42.24 $28.85 $71.09 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: TUNNEL CONSTRUCTION: TUNNELS, CAISSON AND CYLINDER WORK IN COMPRESSED AIR: MUCKING MACHINE OPERATOR A. PAID HOLIDAYS: ON TUNNEL WORK ONLY: N $45.01 $28.85 $73.86 Top 10% +197% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $45.14 $30.24 $75.38 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BLAST AND SPRAY $42.57 $26.75 $69.32 +169% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLL $39.57 $26.75 $66.32 +157% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH, ROLLER, BLASTING SPRAY $59.70 $26.90 $86.60 +236% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: TANKS, TOWERS, SWING $41.57 $26.75 $68.32 +165% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 CRANE HANDLING OR ERECTING STRUCTURAL STEEL OR STONE, HOISTING ENGINEER HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER $58.19 $29.80 $87.99 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 10 VIBRATORY HAMMER,ICE MACHINE, DIESEL & AIR, HAMMER, ETC. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL D $45.96 $29.80 $75.76 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 11 CONVEYOR, EARTH ROLLER, POWER PAVEMENT BREAKER, ROBOT DEMOLITION EQUIPMENT. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD $45.96 $29.80 $75.76 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 12 WELLPOINT OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THAN $45.87 $29.80 $75.67 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 13 PORTABLE ASPHALT PLANT OPERATOR, PORTABLE CONCRETE PLANT OPERATOR, PORTABLE CRUSHER PLANT OPERATOR, PORTABLE GROUT $47.91 $29.80 $77.71 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 14 COMPRESSOR BATTERY OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR $45.12 $29.80 $74.92 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 15 POWER SAFETY BOAT, VACUUM TRUCK, ZIM MIXER, SWEEPER; . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY $44.70 $29.80 $74.50 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 16 ELEVATOR OPERATOR, TOW MOTOR OPERATOR. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE D $43.60 $29.80 $73.40 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 17 GENERATOR OPERATOR, COMPRESSOR OPERATOR, PUMP OPERATOR,WELDING MACHINE OPERATOR; HEATER OPERATOR. A. PAID HOLIDAYS $43.06 $29.80 $72.86 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 18 MAINTENANCE ENGINEER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, TH $42.20 $29.80 $72.00 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 19 FRONT END LOADER; WORK BOAT 26 FT. AND OVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPEND $53.33 $29.80 $83.13 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 CRANES BAUER DRILL/CAISSON HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING $57.78 $29.80 $87.58 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 20 EXCAVATOR OVER 2 CUBIC YARDS; PILE DRIVER. A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDEN $52.92 $29.80 $82.72 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 21 EXCAVATOR, GRADALL, MASTER MECHANIC, HOISTING ENGINEER, RUBBER TIRE EXCAVATOR, GRADER OPERATOR, BULLDOZER FINEGRAD $51.92 $29.80 $81.72 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 CRANES HAZARDOUS WASTE PREMIUM $3.00 PER HOUR OVER CLASSIFIED RATE. CRANE WITH BOOM, INCLUDING JIB, 150 FEET - $1.5 $56.79 $29.80 $86.59 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 TRENCHING MACHINES, LIGHTER DERRICK, CONCRETE FINISHING MACHINE, CMI MACHINE OR SIMILAR, KOEHRING LOADER. A. PAID H $51.92 $29.80 $81.72 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 SPECIALTY RAILROAD EQUIPMENT, ASPHALT SPREADER, ASPHALT RECLAIMING MACHINE, LINE GRIDER, CONCRETE PUMPS, DRILLS WIT $50.63 $29.80 $80.43 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 6 FRONT END LOADER, BULLDOZER . A. PAID HOLIDAYS: NEW YEAR'S DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR $50.22 $29.80 $80.02 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 7 ASPHALT ROLLER, CONCRETE SAWS AND CUTTERS, VERMEER CONCRETE CUTTER, STUMP GRINDER, SCRAPER, SNOOPER, SKIDDER, MILLI $49.25 $29.80 $79.05 Top 10% +114% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 8 MECHANIC, GREASE TRUCK OPERATOR, HYDOBLASTER, BARRIER MOVER, POWER STONE SPREADER, WELDER, WORK BOAT UNDER 26 FT. T $49.25 $29.80 $79.05 Top 10% +114% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 9 FRONT END LOADER, SKID STEER LOADER, BOBCAT OR SIMILAR, FORKLIFT, POWER CHIPPER, LANDSCAPE EQUIPMENT, VACUUM EXACAV $48.67 $29.80 $78.47 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
SOUTHBURY, WALLINGFORD, WATERBURY, WEST HAVEN, WOLCOTT, WOODBRIDGE TOLLAND COUNTY ANDOVER, COLUMBIA, COVENTRY $50.49 $29.19 $79.68 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: 2 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEP $36.27 $32.68 $68.95 Top 10% +144% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: 3 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA $36.27 $32.68 $68.95 Top 10% +144% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: 3 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEP $36.33 $32.68 $69.01 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: 4 AXLE HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA $36.39 $32.68 $69.07 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: 4 AXLE READY MIX HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEP $37.19 $32.68 $69.87 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: HEAVY DUTY TRAILER 40 TONS AND OVER HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY $38.66 $32.68 $71.34 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: HEAVY DUTY TRAILER UP TO 40 TONS HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEM $37.39 $32.68 $70.07 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: SNORKLE TRUCK HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPEND $36.54 $32.68 $69.22 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: SPECIALIZED HAZARDOUS WASTE REMOVAL WORK RECEIVES ADDITIONAL $1.25 PER HOUR. A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDEN $36.44 $32.68 $69.12 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Middlesex, CT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Middlesex

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for CT20260001-16435-hwy →