Building Construction — Litchfield, Connecticut

WD CT20260019-16434-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Litchfield, Connecticut (construction type: building) is $42.03/hr base + $29.19/hr fringe = $71.22/hr total package (WD CT20260019-16434-bld, Rev. 2).

Scroll down for all 10 trade classifications covered by this determination.

WD Number: CT20260019-16434-bld
Revision: 2
Construction Type: building
State: Connecticut (CT)
County: Litchfield
Effective: May 17, 2026
Trades covered: 10
Official source: SAM.gov reference CT20260019View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $42.03 $29.19 $71.22 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $29.36 $0.00 $29.36 +2% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.40 $36.74 $84.14 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $48.81 $33.65 $82.46 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING, STRUCTURAL $45.25 $43.62 $88.87 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER $35.70 $28.85 $64.55 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $39.57 $26.75 $66.32 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: COMPOSITION $45.15 $23.53 $68.68 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: SLATE AND TILE $45.65 $23.53 $69.18 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $50.60 $45.61 $96.21 Top 10% +221% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Litchfield, CT — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Litchfield

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for CT20260019-16434-bld →