Highway Construction — Sedgwick, Colorado

WD CO20260011-16391-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Sedgwick, Colorado (construction type: highway) is $18.96/hr base + $3.18/hr fringe = $22.14/hr total package (WD CO20260011-16391-hwy, Rev. 1).

Scroll down for all 68 trade classifications covered by this determination.

WD Number: CO20260011-16391-hwy
Revision: 1
Construction Type: highway
State: Colorado (CO)
County: Sedgwick
Effective: May 17, 2026
Trades covered: 68
Official source: SAM.gov reference CO20260011View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $18.96 $3.18 $22.14 -23% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, FORM WORK ONLY $20.98 $3.89 $24.87 Top 10% -13% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, FORM WORK ONLY $20.28 $4.50 $24.78 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.00 $1.40 $22.40 -23% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.98 $2.53 $20.51 -30% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.22 $2.74 $21.96 -25% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.06 $8.76 $36.82 +23% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $12.90 $3.07 $15.97 Bottom 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $14.60 $3.49 $18.09 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.12 $3.89 $25.01 Above median -15% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $20.84 $7.04 $27.88 Top 10% +24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $15.79 $4.87 $20.66 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER.$ 17.02 5.79 IRONWORKER, STRUCTURAL $16.76 $6.01 $22.77 +2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SPREADER $22.67 $8.72 $31.39 Above median +40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.44 $3.53 $15.97 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $16.00 $6.14 $22.14 Bottom 10% -1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $12.81 $3.16 $15.97 -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-CEMENT/CONCRETE $14.71 $3.29 $18.00 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL $12.39 $3.20 $15.59 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL $9.42 $3.21 $12.63 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $17.54 $3.52 $21.06 -14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN $24.56 $6.68 $31.24 Bottom 10% +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT PAVER $22.67 $8.72 $31.39 Top 10% +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT PLANT $21.13 $2.16 $23.29 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER.$ 23.92 9.22 POWER EQUIPMENT OPERATOR: ASPHALT ROLLER $23.79 $7.59 $31.38 +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER $23.19 $7.66 $30.85 +4% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE $28.64 $1.40 $30.04 Top 10% +1% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE $25.88 $4.18 $30.06 Top 10% +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER $20.79 $5.36 $26.15 Top 10% -12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $29.99 $2.90 $32.89 +11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CHIPPER $22.04 $8.26 $30.30 Top 10% +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL $20.49 $2.66 $23.15 Bottom 10% -22% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $18.30 $2.01 $20.31 Bottom 10% -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $19.02 $4.20 $23.22 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER $16.07 $4.41 $20.48 Top 10% -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $27.22 $5.85 $33.07 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $21.09 $4.87 $25.96 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $16.74 $4.20 $20.94 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC.$ 20.52 5.49 POWER EQUIPMENT OPERATOR: LOADER $27.48 $4.87 $32.35 +9% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $22.54 $9.22 $31.76 +7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR $16.52 $4.87 $21.39 -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCRAPER $19.93 $5.38 $25.31 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $21.30 $6.40 $27.70 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR $16.83 $2.95 $19.78 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- DRILL RIG CAISSON, POWER BROOM/SWEEPER $35.03 $15.20 $50.23 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:-ASPHALT SCREED $35.03 $15.20 $50.23 +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:-CRANE $37.34 $15.20 $52.54 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:-DRILL RIG CAISSON, CRANE.$ 35.41 15.20 POWER EQUIPMENT OPERATOR:-CRANE $35.78 $15.20 $50.98 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:-POWER BROOM/SWEEPER $34.14 $15.20 $49.34 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR $17.98 $5.27 $23.25 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $27.10 $4.87 $31.97 +10% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $28.21 $4.87 $33.08 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $28.77 $4.87 $33.64 Above median +16% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $27.25 $4.87 $32.12 +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $28.50 $4.87 $33.37 Above median +15% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $27.93 $4.87 $32.80 +13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $27.59 $4.87 $32.46 +12% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $29.06 $4.87 $33.93 Above median +17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.92 $6.19 $25.11 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.15 $3.83 $17.98 Above median -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.52 $5.96 $24.48 Above median -15% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $18.29 $4.87 $23.16 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $17.79 $3.51 $21.30 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK $18.79 $3.49 $22.28 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP AND PILOT CAR $14.04 $3.49 $17.53 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI TRUCK $15.80 $4.67 $20.47 Bottom 10% -29% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI TRUCK $17.58 $4.67 $22.25 -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $14.88 $2.07 $16.95 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sedgwick, CO — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.