Heavy Construction — Phillips, Colorado

WD CO20260003-16390-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTERS: ALL OTHER WORK in Phillips, Colorado (construction type: heavy) is $15.72/hr base + $0.00/hr fringe = $15.72/hr total package (WD CO20260003-16390-hvy, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: CO20260003-16390-hvy
Revision: 1
Construction Type: heavy
State: Colorado (CO)
County: Phillips
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference CO20260003View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTERS: ALL OTHER WORK $15.72 $0.00 $15.72 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: FORM BUILDING AND SETTING $16.16 $0.82 $16.98 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.76 $2.28 $17.04 -42% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.80 $19.53 $66.33 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.75 $13.25 $45.00 +51% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.95 $14.41 $51.36 +72% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.70 $18.47 $59.17 +98% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $35.40 $16.06 $51.46 +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON $11.11 $3.80 $14.91 -33% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMEN $27.39 $5.82 $33.21 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINE EQUIPMENT OPERATOR $44.27 $9.41 $53.68 Above median +3% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN AND WELDER $61.36 $14.88 $76.24 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $18.13 $1.84 $19.97 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $50.68 $20.15 $70.83 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA, CROWLEY, CUSTER, ELBERT, FREMONT, HUERFANO, KIOWA, KIT CARSON, LAS ANIMAS, LINCOLN $45.90 $17.17 $63.07 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER (ARCHULETA, DELTA, DOLORES, EAGLE, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN $41.32 $16.01 $57.33 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDES HVAC WORK $45.90 $17.17 $63.07 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $15.39 $0.00 $15.39 Above median -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $15.93 $3.58 $19.51 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER $20.22 $4.41 $24.63 Top 10% -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $15.08 $4.44 $19.52 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER $15.86 $3.59 $19.45 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MECHANIC $35.58 $15.20 $50.78 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-FINISH $35.58 $15.20 $50.78 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MOTOR GRADER: BLADE-ROUGH $35.03 $15.20 $50.23 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED, ALL TYPES OVER 5 TONS $35.03 $15.20 $50.23 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED, RUBBER TIRES UNDER 5 TONS $34.58 $15.20 $49.78 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: TRACKHOE $35.20 $15.20 $50.40 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Phillips, CO — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.