Highway Construction — Larimer, Colorado
WD CO20260014-17090-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Larimer, Colorado (construction type: highway) is $20.72/hr base + $5.34/hr fringe = $26.06/hr total package (WD CO20260014-17090-hwy, Rev. 1).
Scroll down for all 91 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $20.72 | $5.34 | $26.06 -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, FORM WORK ONLY | $16.54 | $3.90 | $20.44 -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, FORM WORK ONLY | $18.79 | $3.67 | $22.46 -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.53 | $3.00 | $20.53 -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $16.05 | $3.00 | $19.05 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: EXCLUDES TRAFFIC SIGNALIZATION..$ 33.45 7.58 CEMENT MASON/CONCRETE FINISHER | $17.48 | $3.00 | $20.48 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: TRAFFIC SIGNALIZTION | $25.84 | $6.66 | $32.50 +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FENCE ERECTOR | $17.46 | $3.47 | $20.93 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GUARDRAIL INSTALLER | $12.89 | $3.39 | $16.28 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $14.79 | $3.98 | $18.77 | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING:PAINTER | $14.66 | $3.21 | $17.87 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| HIGHWAY/PARKING LOT STRIPING:PAINTER | $14.75 | $3.21 | $17.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING, EXCLUDES GUARDRAIL INSTALLATION | $16.69 | $5.45 | $22.14 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: STRUCTURAL, EXCLUDES GUARDRAIL INSTALLATION | $18.22 | $6.01 | $24.23 -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT RAKER | $16.72 | $4.25 | $20.97 Above median -6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT RAKER | $18.66 | $4.66 | $23.32 Above median +4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT SHOVELER | $21.21 | $4.25 | $25.46 Above median +14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT SPREADER | $18.58 | $4.65 | $23.23 Bottom 10% +4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $16.29 | $4.25 | $20.54 Above median -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONCRETE SAW | $16.29 | $6.14 | $22.43 +0% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE AND IRRIGATION | $12.26 | $3.16 | $15.42 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-CEMENT/CONCRETE | $16.29 | $4.25 | $20.54 Above median -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $16.23 | $3.36 | $19.59 Above median -13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $17.27 | $3.83 | $21.10 Above median -6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: TRAFFIC CONTROL | $12.43 | $3.22 | $15.65 Above median -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: TRAFFIC CONTROL | $9.55 | $3.05 | $12.60 Bottom 10% -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN | $23.93 | $7.72 | $31.65 Above median +7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN.$ 26.75 5.39 PAINTER | $16.99 | $2.87 | $19.86 -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER | $27.23 | $3.50 | $30.73 +4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER | $24.25 | $3.50 | $27.75 Bottom 10% -6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER..$ 23.57 3.50 POWER EQUIPMENT OPERATOR: ASPHALT PAVER | $21.50 | $3.50 | $25.00 -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER | $23.66 | $7.36 | $31.02 Above median +5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER | $25.88 | $6.80 | $32.68 Top 10% +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $20.98 | $6.33 | $27.31 Above median -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $19.81 | $6.34 | $26.15 Above median -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | $21.46 | $4.85 | $26.31 Above median -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $15.37 | $4.28 | $19.65 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $17.13 | $4.46 | $21.59 -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BOOM | $22.67 | $8.72 | $31.39 Top 10% +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $23.38 | $6.58 | $29.96 Above median +1% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $23.55 | $6.20 | $29.75 +1% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $22.67 | $8.72 | $31.39 +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: BULLDOZER.$ 22.05 6.23 POWER EQUIPMENT OPERATOR: BROOM/SWEEPER | $23.23 | $6.89 | $30.12 +2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $26.75 | $6.16 | $32.91 +11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: DRILL | $35.06 | $0.00 | $35.06 Above median +18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: DRILL | $31.39 | $0.00 | $31.39 Above median +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $15.91 | $4.68 | $20.59 Bottom 10% -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $24.53 | $6.15 | $30.68 Above median +4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $23.42 | $9.22 | $32.64 Above median +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $24.82 | $5.75 | $30.57 Above median +3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER | $16.07 | $4.41 | $20.48 Top 10% -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: LOADER.$ 23.92 6.67 POWER EQUIPMENT OPERATOR: LOADER.$ 22.44 9.22 POWER EQUIPMENT OPERATOR: LOADER | $20.45 | $3.50 | $23.95 -19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $24.67 | $5.68 | $30.35 Above median +3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $25.50 | $5.38 | $30.88 Above median +4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $27.68 | $4.57 | $32.25 Above median +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $23.93 | $9.22 | $33.15 Above median +12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: OILER | $24.16 | $8.35 | $32.51 Above median +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR | $21.33 | $6.99 | $28.32 Above median -4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION | $23.67 | $8.22 | $31.89 +8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | $16.22 | $4.41 | $20.63 -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | $18.59 | $4.41 | $23.00 Above median -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $30.14 | $1.40 | $31.54 Top 10% +7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $24.06 | $4.13 | $28.19 Above median -5% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $21.33 | $3.50 | $24.83 Above median -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCREED | $27.95 | $3.50 | $31.45 Above median +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCREED | $27.24 | $5.04 | $32.28 Above median +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SCREED | $27.20 | $5.52 | $32.72 Above median +11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $13.13 | $2.95 | $16.08 Above median -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:- DRILL RIG CAISSON | $35.03 | $15.20 | $50.23 Above median +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:-DRILL RIG CAISSON | $35.41 | $15.20 | $50.61 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR:-OILER | $35.20 | $15.20 | $50.40 +70% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC SIGNALIZATION: GROUNDSMAN | $16.93 | $3.58 | $20.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC SIGNALIZATION: GROUNDSMAN | $16.00 | $5.85 | $21.85 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC SIGNALIZATION: GROUNDSMAN | $11.44 | $2.84 | $14.28 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DISTRIBUTOR | $20.61 | $5.27 | $25.88 Top 10% -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DISTRIBUTOR | $19.17 | $4.84 | $24.01 Above median -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DISTRIBUTOR | $19.28 | $4.89 | $24.17 Above median -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.27 | $5.27 | $20.54 Above median -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.27 | $4.28 | $19.55 Above median -33% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $18.86 | $3.50 | $22.36 Above median -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $18.84 | $5.17 | $24.01 Above median -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY TRUCK | $18.96 | $5.30 | $24.26 Above median -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: MECHANIC | $26.48 | $3.50 | $29.98 Top 10% +3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK | $16.87 | $5.56 | $22.43 Top 10% -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK | $16.65 | $5.46 | $22.11 Above median -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: PICKUP AND PILOT CAR | $13.93 | $3.68 | $17.61 Top 10% -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $18.39 | $4.13 | $22.52 Top 10% -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR | $12.43 | $3.22 | $15.65 Top 10% -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $19.28 | $5.04 | $24.32 Above median -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $15.96 | $5.27 | $21.23 Above median -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $19.14 | $4.99 | $24.13 Above median -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Larimer, CO — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Larimer
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Larimer, Colorado.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.