Heavy Construction — El Paso, Colorado

WD CO20260002-16373-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKERS/INSULATOR in El Paso, Colorado (construction type: heavy) is $36.98/hr base + $16.82/hr fringe = $53.80/hr total package (WD CO20260002-16373-hvy, Rev. 1).

Scroll down for all 43 trade classifications covered by this determination.

WD Number: CO20260002-16373-hvy
Revision: 1
Construction Type: heavy
State: Colorado (CO)
County: El Paso
Effective: May 17, 2026
Trades covered: 43
Official source: SAM.gov reference CO20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKERS/INSULATOR $36.98 $16.82 $53.80 +130% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $17.60 $0.00 $17.60 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $42.37 $12.86 $55.23 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.93 $14.29 $47.22 +55% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: ALL OTHER WORK $15.14 $3.37 $18.51 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: FORM BUILDING AND SETTING $16.97 $2.74 $19.71 Top 10% -31% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.31 $2.85 $20.16 -31% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $35.40 $16.06 $51.46 +72% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.80 $19.53 $66.33 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.75 $13.25 $45.00 +51% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.70 $18.47 $59.17 +98% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $18.83 $3.90 $22.73 -23% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL $39.21 $22.84 $62.05 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $11.22 $2.92 $14.14 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: FLAGGER $8.91 $3.80 $12.71 Top 10% -43% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: LANDSCAPE $12.56 $3.21 $15.77 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: PIPELAYER $18.68 $6.78 $25.46 Top 10% +14% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $27.39 $5.82 $33.21 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINE EQUIPMENT OPERATOR $44.27 $9.41 $53.68 Above median +3% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN AND WELDER $61.46 $14.90 $76.36 Top 10% +47% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH, ROLLER & SPRAY $15.81 $3.26 $19.07 Top 10% -22% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $44.15 $22.43 $66.58 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $50.68 $20.15 $70.83 Above median +132% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $45.90 $17.17 $63.07 +106% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $41.32 $16.01 $57.33 +87% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $16.36 $2.48 $18.84 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BLADE: FINISH $34.58 $15.20 $49.78 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BLADE: ROUGH $34.05 $15.20 $49.25 Top 10% +66% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER $34.05 $15.20 $49.25 Top 10% +66% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANES: 141 TONS AND OVER $38.63 $15.20 $53.83 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANES: 50 TONS AND UNDER $34.77 $15.20 $49.97 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CRANES: 91 TO 140 TONS..$ 36.27 15.20 POWER EQUIPMENT OPERATORS: CRANES: 51 TO 90 TONS $35.07 $15.20 $50.27 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FORKLIFT $34.58 $15.20 $49.78 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER $17.24 $3.23 $20.47 Top 10% -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MECHANIC $35.58 $15.20 $50.78 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: OILER $34.14 $15.20 $49.34 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPER: SINGLE BOWL UNDER 40 CUBIC YARDS $35.20 $15.20 $50.40 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SCRAPER: SINGLE BOWL, INCLUDING PUPS 40 CUBIC YARDS AND OVER AND TANDEM BOWLS $35.41 $15.20 $50.61 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: SKID LOADER $15.37 $4.41 $19.78 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: TRACKHOE $35.20 $15.20 $50.40 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $43.05 $22.65 $65.70 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: PICKUP $26.96 $4.87 $31.83 Top 10% +10% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: TANDEM/SEMI AND WATER $27.59 $4.87 $32.46 Top 10% +12% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the El Paso, CO — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in El Paso

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for CO20260002-16373-hvy →