Highway Construction — Crowley, Colorado

WD CO20260010-16403-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Crowley, Colorado (construction type: highway) is $33.11/hr base + $12.17/hr fringe = $45.28/hr total package (WD CO20260010-16403-hwy, Rev. 1).

Scroll down for all 50 trade classifications covered by this determination.

WD Number: CO20260010-16403-hwy
Revision: 1
Construction Type: highway
State: Colorado (CO)
County: Crowley
Effective: May 17, 2026
Trades covered: 50
Official source: SAM.gov reference CO20260010View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $33.11 $12.17 $45.28 +58% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.24 $2.85 $20.09 -31% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER.$ 17.70 2.53 CARPENTER $18.96 $3.18 $22.14 -24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.06 $8.76 $36.82 +23% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $13.92 $3.07 $16.99 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER $14.60 $3.49 $18.09 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $16.94 $6.77 $23.71 -19% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $16.76 $6.01 $22.77 -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.52 $3.53 $18.05 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.48 $3.53 $18.01 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $16.00 $6.14 $22.14 Bottom 10% -1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $15.37 $3.16 $18.53 Top 10% -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-CEMENT/CONCRETE $12.44 $3.10 $15.54 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL $12.39 $3.20 $15.59 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TRAFFIC CONTROL $9.42 $3.21 $12.63 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $17.54 $3.52 $21.06 -14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $22.54 $9.22 $31.76 Above median +7% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN $24.17 $6.73 $30.90 Bottom 10% +4% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT PAVER $22.67 $8.72 $31.39 Top 10% +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT PLANT $21.13 $2.16 $23.29 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT ROLLER $23.14 $7.51 $30.65 +4% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT SPREADER $23.19 $7.66 $30.85 +4% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE $24.70 $3.40 $28.10 Above median -5% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE $23.19 $4.18 $27.37 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER $18.43 $3.12 $21.55 -27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $26.65 $4.46 $31.11 +5% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CHIPPER $22.04 $8.26 $30.30 Top 10% +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL $20.49 $2.66 $23.15 Bottom 10% -22% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE.$ 18.88 3.14 POWER EQUIPMENT OPERATOR: GRADER/BLADE.$ 18.40 4.20 POWER EQUIPMENT OPERATOR: FORKLIFT $18.30 $5.01 $23.31 -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER $16.07 $4.41 $20.48 Top 10% -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $23.56 $5.93 $29.49 +0% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $23.58 $6.66 $30.24 +2% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $18.91 $4.20 $23.11 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER COMPACTOR $17.78 $2.83 $20.61 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCRAPER $19.93 $5.38 $25.31 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $16.21 $3.76 $19.97 -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR $16.83 $2.95 $19.78 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:- DRILL RIG CAISSON, POWER BROOM/SWEEPER $35.03 $15.20 $50.23 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:-CRANE $35.58 $15.20 $50.78 Bottom 10% +72% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:-DRILL RIG CAISSON, CRANE.$ 35.41 15.20 POWER EQUIPMENT OPERATOR:-CRANE $35.20 $15.20 $50.40 Bottom 10% +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:-POWER BROOM/SWEEPER $34.14 $15.20 $49.34 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $17.58 $4.67 $22.25 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DISTRIBUTOR $17.98 $5.27 $23.25 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.61 $2.69 $20.30 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $19.77 $3.25 $23.02 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $19.95 $3.36 $23.31 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MECHANIC $17.79 $3.51 $21.30 Above median -26% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK $18.89 $3.49 $22.38 Top 10% -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP AND PILOT CAR $14.04 $3.49 $17.53 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $14.88 $2.07 $16.95 -41% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Crowley, CO — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Crowley

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for CO20260010-16403-hwy →