Building Construction — Costilla, Colorado

WD CO20260001-16402-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKERS/INSULATOR in Costilla, Colorado (construction type: building) is $36.60/hr base + $11.83/hr fringe = $48.43/hr total package (WD CO20260001-16402-bld, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: CO20260001-16402-bld
Revision: 1
Construction Type: building
State: Colorado (CO)
County: Costilla
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference CO20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKERS/INSULATOR $36.60 $11.83 $48.43 Bottom 10% +107% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICA $36.98 $16.82 $53.80 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.93 $14.29 $47.22 +55% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.11 $12.17 $45.28 +58% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: ACOUSTICAL $15.69 $3.15 $18.84 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: ALL OTHER WORK $15.94 $3.41 $19.35 Top 10% -32% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: FORMBUILDING/FORMSETTING, DRYWALL HANGING/FRAMING AND METAL STUD WORK $33.11 $12.17 $45.28 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $34.73 $15.15 $49.88 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $14.44 $2.19 $16.63 -40% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $31.75 $13.25 $45.00 +51% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $36.95 $14.41 $51.36 +72% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS, TELEPHONES, COMPUTERS AND TEMPERATURE CONTROLS $46.80 $19.53 $66.33 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING AND INSTALLATION OF FIRE ALARMS, TELEPHONES, COMPUTERS AND TEMPERATURE CONTROLS $40.70 $18.47 $59.17 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $35.40 $16.06 $51.46 +72% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $56.57 $38.44 $95.01 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $37.26 $13.15 $50.41 +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $39.21 $12.50 $51.71 +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON $9.75 $0.00 $9.75 -56% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE/MASON TENDERS $21.10 $7.89 $28.99 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, SPRAY $15.19 $0.00 $15.19 Above median -38% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $43.40 $22.11 $65.51 Above median +114% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.40 $22.11 $67.51 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $47.23 $21.68 $68.91 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: (ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA, CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, KIT CARSON, LAS ANIMAS, LIN $47.60 $18.10 $65.70 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: PLUMBERS & PIPEFITTERS (ARCHULETA, DELTA, DOLORES, EAGLE, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OUR $41.32 $16.01 $57.33 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE $13.41 $0.00 $13.41 Top 10% -55% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $32.90 $6.18 $39.08 +46% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER () $43.05 $22.65 $65.70 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Costilla, CO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Costilla

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for CO20260001-16402-bld →