Building Construction — Boulder, Colorado

WD CO20260017-16379-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL in Boulder, Colorado (construction type: building) is $36.98/hr base + $16.82/hr fringe = $53.80/hr total package (WD CO20260017-16379-bld, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: CO20260017-16379-bld
Revision: 1
Construction Type: building
State: Colorado (CO)
County: Boulder
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference CO20260017View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL $36.98 $16.82 $53.80 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $21.96 $0.00 $21.96 -28% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING $22.66 $6.79 $29.45 Top 10% +3% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.31 $6.76 $27.07 -7% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $20.82 $6.37 $27.19 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $19.24 $6.30 $25.54 Top 10% -9% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.80 $19.53 $66.33 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $56.57 $38.44 $95.01 Bottom 10% +68% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC: HVAC UNIT INSTALLATION, EXCLUDES PIPE AND DUCT INSTALLATION $25.23 $9.36 $34.59 +13% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $39.21 $12.50 $51.71 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $39.21 $12.50 $51.71 +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.76 $0.00 $11.76 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $15.99 $0.00 $15.99 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $16.00 $0.00 $16.00 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.96 $3.68 $20.64 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.10 $19.02 $61.12 +68% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.78 $5.78 $26.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.58 $2.42 $21.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $21.50 $0.00 $21.50 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $27.41 $11.56 $38.97 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.55 $22.11 $67.66 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $47.23 $21.68 $68.91 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $37.34 $15.20 $52.54 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $36.09 $15.20 $51.29 +73% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $17.14 $0.00 $17.14 -36% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $43.05 $22.65 $65.70 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $18.25 $14.33 $32.58 Bottom 10% +31% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $48.60 $27.57 $76.17 Above median +149% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.34 $0.00 $17.34 Above median -40% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Boulder, CO — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Boulder

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for CO20260017-16379-bld →