Residential Construction — Yuba, California
WD CA20260019-16351-res · Revision 5 · Effective May 17, 2026
The Davis-Bacon prevailing wage for AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN in Yuba, California (construction type: residential) is $37.20/hr base + $27.30/hr fringe = $64.50/hr total package (WD CA20260019-16351-res, Rev. 5).
Scroll down for all 291 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN | $37.20 | $27.30 | $64.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. FOOTNOTE: LABORERS WORKING OFF | $36.05 | $27.30 | $63.35 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. FOOTNOTE: LABORERS WORKING OFF | $37.05 | $27.30 | $64.35 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF | $34.56 | $11.40 | $45.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF | $36.53 | $9.27 | $45.80 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $64.56 | $25.07 | $89.63 Above median +318% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $84.76 | $25.07 | $109.83 Top 10% +412% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All bu | $49.64 | $28.56 | $78.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All bu | $54.25 | $28.56 | $82.81 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| BETWEEN AREA 1 AND AREA 2 AS NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All bu | $57.85 | $28.56 | $86.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICK TENDER FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL | $37.05 | $27.45 | $64.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SE | $56.94 | $26.28 | $83.22 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: EL DORADO, PLACER, SACRAMENTO, SUTTER SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES | $52.76 | $25.01 | $77.77 Top 10% +144% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SOLANO, SONOMA SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BAS | $57.02 | $28.50 | $85.52 Top 10% +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: MONTEREY, SANTA CRUZ SPECIALTY PAY: UNDERGROUND WORK SUCH AS TUNNEL WORK, SEWER WORK, MANHOLES, CATCH BASINS, SEWER PIPES AND TELEPHONE CO | $54.18 | $27.82 | $82.00 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $55.12 | $24.30 | $79.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $47.93 | $24.09 | $72.02 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $46.00 | $25.68 | $71.68 | $0.00 | $0.00 | $0.00 | $0.00 |
| BUILDING ACCESS); EXCLUDING ENERGY MANAGEMENT SYSTEMS | $40.00 | $25.50 | $65.50 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $74.54 | $36.09 | $110.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $87.40 | $49.41 | $136.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN COUNTY | $52.65 | $30.82 | $83.47 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER MARIN COUNTY | $52.80 | $30.82 | $83.62 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTY | $52.65 | $30.82 | $83.47 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: MILLWRIGHT MARIN COUNTY | $52.75 | $32.41 | $85.16 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER | $60.39 | $33.52 | $93.91 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER | $52.65 | $30.82 | $83.47 Bottom 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER | $54.85 | $31.49 | $86.34 Above median +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER (EL DORADO, PLACER, SUTTER AND YUBA COUNTIES) | $60.39 | $33.52 | $93.91 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO, PLACER, SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY INCLUDES TERRITORY WEST OF AND IN | $60.39 | $33.52 | $93.91 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER SOLANO COUNTY | $54.85 | $31.49 | $86.34 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $60.54 | $33.52 | $94.06 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $52.80 | $30.82 | $83.62 Above median +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $55.00 | $31.49 | $86.49 Above median +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $49.12 | $31.49 | $80.61 +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO, PLACER, SACRAMENTO AND YOL | $54.66 | $33.52 | $88.18 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO, PLACER, SUTTER AND YUBA CO | $53.31 | $33.52 | $86.83 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER SOLANO COUNTY | $55.00 | $31.49 | $86.49 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $60.39 | $33.52 | $93.91 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $52.65 | $30.82 | $83.47 Above median +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $54.85 | $31.49 | $86.34 Above median +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $48.97 | $31.49 | $80.46 +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER (EL DORADO, PLACER, SUTTER AND YUBA COUNTIES) | $53.16 | $33.52 | $86.68 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER EL DORADO, PLACER, SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY INCLUDES TERRITORY WEST OF AND INCLUDING HIGH | $54.51 | $33.52 | $88.03 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTY | $54.85 | $31.49 | $86.34 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER.$ 60.39 33.52 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR | $60.54 | $33.52 | $94.06 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER..$ 48.97 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR | $49.12 | $31.49 | $80.61 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $60.49 | $35.11 | $95.60 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $52.75 | $32.41 | $85.16 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $54.95 | $33.08 | $88.03 Above median +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $51.47 | $33.08 | $84.55 Above median +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT (EL DORADO, PLACER, SUTTER AND YUBA COUNTIES) | $55.66 | $35.11 | $90.77 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT EL DORADO, PLACER, SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND | $57.01 | $35.11 | $92.12 Top 10% +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT SOLANO COUNTY | $54.95 | $33.08 | $88.03 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT.$ 54.95 33.08 CARPENTERS: JOURNEYMAN CARPENTER | $54.85 | $31.49 | $86.34 Top 10% +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $32.15 | $23.27 | $55.42 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S | $36.25 | $27.30 | $63.55 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S | $36.35 | $27.30 | $63.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S | $37.08 | $27.30 | $64.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S | $36.55 | $27.30 | $63.85 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CLEANERS SHALL RECEIVE $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN S | $36.72 | $27.30 | $64.02 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER STEEPLEJACK-DRYWALL FINISHER OVER 40 FT WITH OPEN SPACE BELOW: $1.50 ADDITIONAL PER HOUR | $42.79 | $16.12 | $58.91 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER: AREA 1: ALAMEDA, CONTRA COSTA, NAPA, SAN FRANCISCO, SAN SANTA CLARA, SOLANO AND SONOMA COUNTIES | $63.76 | $32.69 | $96.45 Top 10% +188% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER: AREA 2: EL DORADO COUNTY, MONTEREY, PLACER, SACRAMENTO, BENITO, SANTA CRUZ, SIERRA, SUTTER AND YUBA COUNTIES | $59.63 | $31.29 | $90.92 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS: AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties | $54.85 | $31.93 | $86.78 Top 10% +174% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS: AREA 2: Monterey, San Benito & Santa Cruz Counties | $48.97 | $31.93 | $80.90 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS: AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & YubaCounties | $48.12 | $31.93 | $80.05 Top 10% +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER: AREA 1: Alameda, Contra Costa, Marin, Napa, San Francisco, San Mateo, Santa Clara, Solano & Sonoma Counties | $27.43 | $18.58 | $46.01 Top 10% +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER: AREA 2: Monterey, San Benito & Santa Cruz Counties | $24.49 | $18.58 | $43.07 Top 10% +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER: AREA 4: El Dorado, Placer, Sacramento, Sutter, Yolo, & Yuba Counties | $24.07 | $18.58 | $42.65 Top 10% +35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $37.58 | $28.03 | $65.61 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $35.11 | $28.03 | $63.14 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $54.69 | $34.69 | $89.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $56.71 | $34.69 | $91.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $57.79 | $34.69 | $92.48 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $58.88 | $34.69 | $93.57 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $60.15 | $34.69 | $94.84 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $61.36 | $34.69 | $96.05 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $62.69 | $34.69 | $97.38 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $64.09 | $34.69 | $98.78 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remainder | $65.54 | $34.69 | $100.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 | $63.06 | $34.69 | $97.75 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 | $42.55 | $31.15 | $73.70 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 | $66.39 | $34.69 | $101.08 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 | $43.79 | $31.15 | $74.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 | $58.88 | $34.69 | $93.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: SONOMA Area 1 | $62.69 | $34.69 | $97.38 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $38.50 | $21.16 | $59.66 +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $66.26 | $35.84 | $102.10 Top 10% +177% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $47.35 | $23.49 | $70.84 Above median +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $41.00 | $24.26 | $65.26 Above median +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $76.00 | $49.07 | $125.07 Top 10% +240% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $86.00 | $51.07 | $137.07 Top 10% +272% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN WORK ON RESIDENTIAL WOOD FRAME REMODEL AND REPAIR IN ALL WOOD-CONSTRUCTED BUILDINGS NOT TO EXCEED 24 LIVING UNITS; AND NEW WOOD FRAME SING | $55.50 | $25.64 | $81.14 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN ZONE PAY: ZONE 1 - 0 TO 70 MILES $0.00 PER HOUR ZONE 2 - 70 TO 90 MILES $5.00 PER HOUR ZONE 3 - 91 MILES AND OVER $7.00 PER HOUR | $31.88 | $8.46 | $40.34 Top 10% +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: FOUR STORIES | $39.06 | $24.51 | $63.57 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: WORK ON SINGLE FAMILY HOMES AND APARTMENTS UP TO AND INCLUDING 3 STORIES | $23.10 | $12.48 | $35.58 Top 10% -3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ZONE B: ZONE B: ANY AREA OUTSIDE OF ZONE A | $77.45 | $33.97 | $111.42 Top 10% +203% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEA | $84.05 | $38.44 | $122.49 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER (ALAMEDA, CONTRA COSTA, MARIN, MONTEREY, NAPA, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SANTA CRUZ, SONOMA COUNTIES;AND SOLANO COUNT | $56.22 | $34.00 | $90.22 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSG | $43.25 | $35.62 | $78.87 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: FENCE ERECTOR PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reser | $45.78 | $26.51 | $72.29 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocol | $50.70 | $35.15 | $85.85 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: FENCE ERECTOR PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Rese | $45.78 | $26.51 | $72.29 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Choco | $55.33 | $35.15 | $90.48 Bottom 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL PREMIUM $6.00 additional per hour at the following locations: China Lake Naval Test Station, Choco | $55.83 | $35.15 | $90.98 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-cont | $39.15 | $30.03 | $69.18 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 SCOPE OF WORK: Covers site mobilization; initial site clean-up; site preparation; removal of asbestos-cont | $38.15 | $30.03 | $68.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK | $36.29 | $25.55 | $61.84 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK FOOTNOTE: REFRACTORY WORK WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL | $36.84 | $26.24 | $63.08 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK MARIN COUNTY | $37.54 | $25.55 | $63.09 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST | $37.20 | $27.30 | $64.50 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST: ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST | $36.20 | $27.30 | $63.50 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' w | $37.20 | $27.30 | $64.50 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' | $37.20 | $27.30 | $64.50 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' | $36.20 | $27.30 | $63.50 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1 ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAP | $36.50 | $27.30 | $63.80 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG | $35.72 | $27.30 | $63.02 Above median +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-A: JOY DRILL MODEL TWM-2A; GARDNER-DENVER MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG | $36.72 | $27.30 | $64.02 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1-C: BURNING AND WELDING IN CONNECTION WITH LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WE | $36.55 | $27.30 | $63.85 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 1: Asphalt spreader boxes; Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewra | $35.50 | $27.30 | $62.80 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE | $35.35 | $27.30 | $62.65 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 2: ASPHALT SHOVELER; CEMENT DUMPER AND HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE | $36.35 | $27.30 | $63.65 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WA | $35.25 | $27.30 | $62.55 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 3: CONSTRUCTION LABORERS, INCLUDING BRIDGE AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WA | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEAN | $28.94 | $27.30 | $56.24 Bottom 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, CONSTRUCTION CRAFT LABORERS: GROUP 4: ALL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEAN | $29.94 | $27.30 | $57.24 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.2 | $37.46 | $27.30 | $64.76 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 1: Structural nozzleman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.2 | $37.46 | $27.30 | $64.76 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffo | $36.96 | $27.30 | $64.26 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 2: Nozzleman, Gunman, Potman, Groundman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffo | $36.96 | $27.30 | $64.26 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 3: REBOUNDMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour | $36.37 | $27.30 | $63.67 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 3: Reboundman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour | $36.37 | $27.30 | $63.67 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 4: GUNITE LABORER FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 4: Gunite laborer FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA B: GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.2 | $36.46 | $27.30 | $63.76 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA B: GROUP 1: Structural nozzleman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.2 | $36.46 | $27.30 | $63.76 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GORUNDMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffo | $35.96 | $27.30 | $63.26 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA B: GROUP 2: Nozzleman, Gunman, Potman, Groundman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffo | $35.96 | $27.30 | $63.26 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA B: GROUP 3: REBOUNDMAN FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour | $35.37 | $27.30 | $62.67 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA B: GROUP 3: Reboundman FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour | $35.37 | $27.30 | $62.67 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA B: GROUP 4: GUNITE LABORER FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per | $35.25 | $27.30 | $62.55 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA B: GROUP 4: Gunite laborer FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per | $35.25 | $27.30 | $62.55 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOU | $36.46 | $27.30 | $63.76 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE: GROUP 1 STRUCTURAL NOZZLEMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR | $37.46 | $27.30 | $64.76 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS | $35.96 | $27.30 | $63.26 Bottom 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS | $36.96 | $27.30 | $64.26 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE: GROUP 3 REBOUNDMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDITION | $35.37 | $27.30 | $62.67 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE: GROUP 3 REBOUNDMAN FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDITIONA | $36.37 | $27.30 | $63.67 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE: GROUP 4 GUNITE LABORER FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS : $0.25 PER HOUR ADDI | $35.25 | $27.30 | $62.55 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE: GROUP 4 GUNITE LABORER FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR ADDIT | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING - AREA A: GROUP 1: Skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 p | $36.50 | $27.30 | $63.80 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING - AREA A: GROUP 2: Semi-skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0 | $36.35 | $27.30 | $63.65 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING - AREA B: GROUP 1: Skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 p | $35.50 | $27.30 | $62.80 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING - AREA B: GROUP 2 : Semi-skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $ | $35.35 | $27.30 | $62.65 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING - AREA B: GROUP 2: Semi-skilled wrecker FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0 | $35.35 | $27.30 | $62.65 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING: GROUP 1 SKILLED WRECKER (REMOVING AND SALVAGING OF SASH, WINDOWS ADN MATERIALS FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS | $36.50 | $27.30 | $63.80 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING: GROUP 1 Skilled wrecker FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS): $0.25 PER HOUR A | $35.50 | $27.30 | $62.80 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING: GROUP 1 Skilled wrecker FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HOUR AD | $36.50 | $27.30 | $63.80 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING: GROUP 2 GROUP 2: Semi-skilled wrecker FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0 | $36.35 | $27.30 | $63.65 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING: GROUP 2 SEMI-SKILLED WRECKER FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS ): $0.25 PER | $36.35 | $27.30 | $63.65 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, WRECKING: GROUP 2 Semi-skilled wrecker FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS: $0.25 PER HO | $35.35 | $27.30 | $62.65 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: ESTABLISHMENT WARRANTY PERIOD FOOTNOTE: Laborers working off or with or fro | $29.94 | $27.30 | $57.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A: NEW CONSTRUCTION FOOTNOTE: Laborers working off or with or from bos'n chair | $36.25 | $27.30 | $63.55 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: ESTABLISHMENT WARRANTY PERIOD FOOTNOTE: Laborers working off or with or fro | $28.94 | $27.30 | $56.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B: NEW CONSTRUCTION FOOTNOTE: Laborers working off or with or from bos'n chair | $35.25 | $27.30 | $62.55 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N C | $29.94 | $27.30 | $57.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGI | $35.25 | $27.30 | $62.55 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER, GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: NEW CONSTRUCTION FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGI | $36.25 | $27.30 | $63.55 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS: ESTABLISHMENT WARRANTY PERIOD FOOTNOTE: LABORERS WORKING OFF OR WITH OR FROM BOS'N C | $28.94 | $27.30 | $56.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER | $77.35 | $36.53 | $113.88 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE | $70.41 | $33.76 | $104.17 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE FINISHER | $42.06 | $19.80 | $61.86 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE MASON | $61.72 | $30.31 | $92.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN A | $47.64 | $28.56 | $76.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN A | $52.25 | $28.56 | $80.81 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARIN, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SANTA CLARA, SANTA CRUZ, SOLANO, YOLO, AND YUBA COUNTIESTHE REMAINING COUNTIES ARE SPLIT BETWEEN A | $55.85 | $28.56 | $84.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON TENDER, BRICK | $35.29 | $26.85 | $62.14 Bottom 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO COUNTIES FOOTNOTES: UNDERGROUND WORK SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES, TELEPHONE CO | $37.05 | $27.45 | $64.50 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind | $37.86 | $28.03 | $65.89 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind | $37.20 | $28.03 | $65.23 | $0.00 | $0.00 | $0.00 | $0.00 |
| NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind | $63.06 | $34.69 | $97.75 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind | $37.83 | $28.03 | $65.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind | $35.34 | $28.03 | $63.37 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind | $64.70 | $34.69 | $99.39 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind | $66.39 | $34.69 | $101.08 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind | $35.59 | $28.03 | $63.62 | $0.00 | $0.00 | $0.00 | $0.00 |
| NOTED ELDORADO Area 1: North Central Area 2: MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern PLACER Area 1: All but the Central Area 2: Remaind | $38.05 | $28.03 | $66.08 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 1: Operator of helicopter; Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7cu. yds. (EL DORADO | $65.54 | $34.69 | $100.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat o | $64.09 | $34.69 | $98.78 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu | $61.36 | $34.69 | $96.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete p | $60.15 | $34.69 | $94.84 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or si | $57.79 | $34.69 | $92.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1: GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor; Compressor oper | $56.71 | $34.69 | $91.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar; Mini excavator under 25 | $54.69 | $34.69 | $89.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 1: TRUCK CRANE OILER: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons | $46.08 | $31.15 | $77.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: CRANES: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Cra | $64.70 | $34.69 | $99.39 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Cran | $42.83 | $31.15 | $73.98 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 2: TRUCK CRANE OILER: Clamshell and dragline over 1 cu. yd. up to and including 7 cu | $45.07 | $31.15 | $76.22 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: HYDRAULIC: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons a | $44.44 | $31.15 | $75.59 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1: GROUP 3: TRUCK CRANE OILER: Clamshell and dragline up to and including 1 cu. yd.; Cranes 4 | $44.83 | $31.15 | $75.98 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $57.00 | $28.04 | $85.04 Top 10% +208% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER FOOTNOTES: SPRAY WORK: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR | $53.38 | $28.04 | $81.42 Top 10% +195% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH AND ROLLER PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS, & SANDBLAST = $0.50/HR SPECIAL COATINGS, & STEEPLEJACK = $1.00/HR | $39.43 | $16.16 | $55.59 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: PAPER HANGER PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS, & SANDBLAST = $0.50/HR SPECIAL COATINGS, & STEEPLEJACK = $1.00/HR SWI | $42.19 | $16.16 | $58.35 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: SPRAY PAINTER PREMIUMS: SPRAY & PAPERHANGER = $0.85/HR SPECIAL COATINGS, & SANDBLAST = $0.50/HR SPECIAL COATINGS, & STEEPLEJACK = $1.00/HR SW | $41.43 | $16.16 | $57.59 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH SPRAY/SANDBLAST: $0.50 ADDITIONAL PER HOUR. EXOTIC MATERIALS: $1.25 ADDITIONAL PER HOUR. HIGH TIME: OVER 50 FT ABOVE GROUND OR WATER L | $43.45 | $22.80 | $66.25 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER | $34.71 | $17.62 | $52.33 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO | $40.83 | $17.62 | $58.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING | $35.11 | $17.62 | $52.73 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $40.68 | $29.68 | $70.36 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTER TENDER Work on a swing stage scaffold: $1.00 per hour additional | $39.77 | $28.54 | $68.31 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $42.41 | $30.73 | $73.14 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $36.73 | $31.68 | $68.41 Above median +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $32.88 | $31.68 | $64.56 Above median +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $32.70 | $31.68 | $64.38 Above median +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $40.68 | $29.68 | $70.36 Above median +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $52.75 | $41.39 | $94.14 Top 10% +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER & STEAMFITTER | $57.75 | $43.60 | $101.35 Top 10% +208% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER & STEAMFITTER | $80.50 | $50.45 | $130.95 Top 10% +298% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $43.72 | $20.29 | $64.01 Bottom 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, STEAMFITTER, REFRIGERATION FITTER: NEW CONSTRUCTION IN SAN FRANCISCO COUNTY | $91.00 | $49.49 | $140.49 Top 10% +327% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, STEAMFITTER, REFRIGERATION FITTER: Wood Frame Construction in San Francisco, and all work in Marin & Sonoma Counties | $82.00 | $48.18 | $130.18 Top 10% +296% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER/STEAMFITTER | $87.75 | $41.44 | $129.19 Top 10% +293% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $30.90 | $7.90 | $38.80 Bottom 10% +18% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $55.58 | $24.02 | $79.60 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS (EL DORADO AND PLACER COUNTIES) | $52.14 | $18.71 | $70.85 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS FOOTNOTES: WORK FROM TRUSSES, TEMPORARY STAGING, UNGUARDED STRUCTURES 35' FROM THE GROUND OR WATER: $.75 PER HOUR ADDITIONAL | $37.35 | $21.15 | $58.50 Top 10% +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $46.73 | $21.36 | $68.09 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $55.30 | $22.97 | $78.27 Top 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $54.94 | $23.34 | $78.28 Top 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER | $57.17 | $21.51 | $78.68 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: JOURNEYMAN | $53.17 | $21.51 | $74.68 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: KETTLE PERSON | $55.17 | $21.51 | $76.68 Top 10% +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $30.29 | $16.41 | $46.70 +22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: AREA 1: ALAMEDA, CONTRA COSTA, MARIN, NAPA, SAN FRANCISCO, SAN MATEO, SANTA CLARA, SOLANO & SONOMA | $67.03 | $50.79 | $117.82 Top 10% +208% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: AREA 2: MONTEREY & SAN BENITO | $60.64 | $39.04 | $99.68 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: AREA 3: SANTA CRUZ | $55.16 | $34.18 | $89.34 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $59.00 | $33.03 | $92.03 Top 10% +215% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $34.27 | $16.47 | $50.74 Bottom 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $48.54 | $26.59 | $75.13 Above median +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS, INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT | $56.68 | $28.35 | $85.03 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT | $58.83 | $31.51 | $90.34 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT | $53.08 | $30.84 | $83.92 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT | $58.33 | $31.00 | $89.33 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O | $67.65 | $31.78 | $99.43 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O | $61.04 | $31.08 | $92.12 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O | $67.08 | $31.26 | $98.34 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.82 | $18.05 | $67.87 +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $49.69 | $29.72 | $79.41 Above median +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $52.06 | $29.86 | $81.92 Above median +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TR | $44.21 | $34.28 | $78.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER FOOTNOTE: BASE MACHINE OPERATOR: $1.00 PER HOUR ADDITIONAL | $44.93 | $20.98 | $65.91 Top 10% +240% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER FOOTNOTE: BASE MACHINE OPERATOR: $1.00 PER HOUR ADDITIONAL | $60.58 | $29.79 | $90.37 Top 10% +366% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $35.78 | $19.23 | $55.01 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $35.00 | $17.44 | $52.44 Above median +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $37.75 | $19.28 | $57.03 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER | $56.79 | $22.54 | $79.33 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER | $55.55 | $21.08 | $76.63 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER | $59.92 | $22.62 | $82.54 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK; NIPPER TRUCK; CONCRETE PUMP TRUCK; CONCRETE PUMP MACHINE; FORK LIFT AND LIFT | $43.26 | $34.28 | $77.54 Top 10% +169% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK; BULK CEMENT SPREADER; DUMPCRETE TRUCK; SKID TRUCK; DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YA | $44.56 | $34.28 | $78.84 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER | $36.01 | $18.50 | $54.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR; RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION | $43.56 | $34.28 | $77.84 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAIL | $43.86 | $34.28 | $78.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $36.50 | $27.30 | $63.80 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $36.35 | $27.30 | $63.65 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $37.05 | $27.30 | $64.35 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $36.55 | $27.30 | $63.85 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $36.72 | $27.30 | $64.02 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE MAINTENANCE AND REPAIR T | $29.94 | $27.30 | $57.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker includi | $35.50 | $27.30 | $62.80 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker includi | $36.50 | $27.30 | $63.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; J | $35.25 | $27.30 | $62.55 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; J | $36.25 | $27.30 | $63.55 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner; material cleaner. The classification ""material cl | $28.94 | $27.30 | $56.24 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner; material cleaner. The classification ""material cl | $29.94 | $27.30 | $57.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| grade checking on connection with peiplaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; pressure pipe tester; No joint pipe an | $36.70 | $27.30 | $64.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| guniting or shot crete FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional | $36.08 | $27.30 | $63.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| guniting or shot crete FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts: $0.25 per hour additional. Sewer cleane | $37.08 | $27.30 | $64.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| handling dry cement or gypsum; Choke-setter and rigger; Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer; Driller te | $35.35 | $27.30 | $62.65 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| handling dry cement or gypsum; Choke-setter and rigger; Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer; Driller te | $36.35 | $27.30 | $63.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| laborers' work; Synthetic thermoplastics and similar type welding FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, bel | $35.55 | $27.30 | $62.85 Bottom 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| laborers' work; Synthetic thermoplastics and similar type welding FOOTNOTE: Laborers working off or with or from bos'n chairs, swinging scaffolds, bel | $36.55 | $27.30 | $63.85 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of po | $35.72 | $27.30 | $63.02 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of po | $36.72 | $27.30 | $64.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| shafts thereof, and work on and in deep footings. In the event the depth of the footing is unknown at the commencement of excavation, and the final de | $36.05 | $27.30 | $63.35 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| shafts thereof, and work on and in deep footings. In the event the depth of the footing is unknown at the commencement of excavation, and the final de | $37.05 | $27.30 | $64.35 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Yuba, CA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Yuba, California.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.