Heavy Construction — Sutter, California
WD CA20260007-16347-hvy · Revision 4 · Effective May 17, 2026
The Davis-Bacon prevailing wage for 180 FEET - $4.00 PER HOUR ADDITIONAL OVER 180 FEET - $6.00 PER HOUIR ADDITIONAL in Sutter, California (construction type: heavy) is $53.38/hr base + $28.04/hr fringe = $81.42/hr total package (WD CA20260007-16347-hvy, Rev. 4).
Scroll down for all 260 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| 180 FEET - $4.00 PER HOUR ADDITIONAL OVER 180 FEET - $6.00 PER HOUIR ADDITIONAL | $53.38 | $28.04 | $81.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT | $59.51 | $34.69 | $94.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT | $64.51 | $34.69 | $99.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ADDITIONAL PER HOUR. 100 TO 180 FT ABOVE GROUND OR WATER LEVEL $4.00 ADDITIONAL PER HOUR. OVER 180 FT ABOVE GROUND OR WATER LEVEL $6.00 ADDITIONAL PER | $43.45 | $22.80 | $66.25 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; J | $35.25 | $27.30 | $62.55 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; J | $36.25 | $27.30 | $63.55 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN | $35.50 | $27.30 | $62.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| AND SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINA | $36.05 | $27.30 | $63.35 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF | $44.73 | $12.75 | $57.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF | $35.31 | $12.75 | $48.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $64.56 | $25.07 | $89.63 Above median +318% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $84.76 | $25.07 | $109.83 Top 10% +412% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER: MARIN & SOLANO COUNTIES | $49.62 | $41.27 | $90.89 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER: REMAINING COUNTIES | $45.60 | $38.99 | $84.59 Top 10% +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR | $57.65 | $39.55 | $97.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR | $55.65 | $39.55 | $95.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $57.02 | $28.50 | $85.52 Top 10% +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $52.76 | $25.01 | $77.77 Top 10% +144% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL | $28.94 | $27.30 | $56.24 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL | $29.94 | $27.30 | $57.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH | $53.23 | $39.55 | $92.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH | $56.53 | $39.55 | $96.08 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH | $51.23 | $39.55 | $90.78 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH | $54.53 | $39.55 | $94.08 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER NAPA AND SOLANO COUNTIES | $69.26 | $31.36 | $100.62 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: BRIDGE BUILDER/HIGHWAY CARPENTER MARIN COUNTY | $52.65 | $30.82 | $83.47 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER MARIN COUNTY | $52.80 | $30.82 | $83.62 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: JOURNEYMAN CARPENTER MARIN COUNTY | $52.65 | $30.82 | $83.47 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: MILLWRIGHT MARIN COUNTY | $52.75 | $32.41 | $85.16 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER ALPINE, COLUSA, EL DORADO, NEVADA, PLACER, SIERRA, SUTTER AND YUBA COUNTIES | $60.39 | $33.52 | $93.91 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER AMADOR COUNTY | $52.65 | $30.82 | $83.47 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES | $52.65 | $30.82 | $83.47 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER EL DORADO, PLACER, SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY INCLUDES TERRITORY WEST OF AND IN | $60.39 | $33.52 | $93.91 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER NAPA AND SONOMA COUNTIES | $54.85 | $31.49 | $86.34 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER SOLANO COUNTY | $54.85 | $31.49 | $86.34 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER ALPINE, COLUSA, EL DORADO, NEVADA, PL | $53.31 | $33.52 | $86.83 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER AMADOR COUNTY | $45.57 | $30.82 | $76.39 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER BUTTE, GLENN, LASSEN, MODOC, PLUMAS | $45.57 | $30.82 | $76.39 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER EL DORADO, PLACER, SACRAMENTO AND YOL | $54.66 | $33.52 | $88.18 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER NAPA AND SONOMA COUNTIES | $55.00 | $31.49 | $86.49 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER SOLANO COUNTY | $55.00 | $31.49 | $86.49 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER ALPINE, COLUSA, EL DORADO, NEVADA, PLACER, SIERRA, SUTTER AND YUBA COUNTIES | $53.16 | $33.52 | $86.68 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER AMADOR COUNTY | $45.42 | $30.82 | $76.24 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES | $45.42 | $30.82 | $76.24 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER EL DORADO, PLACER, SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY INCLUDES TERRITORY WEST OF AND INCLUDING HIGH | $54.51 | $33.52 | $88.03 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER NAPA AND SONOMA COUNTIES | $54.85 | $31.49 | $86.34 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER SOLANO COUNTY | $54.85 | $31.49 | $86.34 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT ALPINE, COLUSA, EL DORADO, NEVADA, PLACER, SIERRA, SUTTER AND YUBA COUNTIES | $55.66 | $35.11 | $90.77 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT AMADOR COUNTY | $47.92 | $32.41 | $80.33 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SISKIYOU, TEHAMA AND TRINITY COUNTIES | $47.92 | $32.41 | $80.33 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT EL DORADO, PLACER, SACRAMENTO AND YOLO COUNTIES FOOTNOTE: PLACER COUNTY INCLUDES TERRITORY WEST OF AND INCLUDING HIGHWAY 49 AND | $57.01 | $35.11 | $92.12 Top 10% +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT NAPA AND SONOMA COUNTIES | $54.95 | $33.08 | $88.03 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT SOLANO COUNTY | $54.95 | $33.08 | $88.03 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $32.15 | $23.27 | $55.42 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM: SOUND & COMMUNICATIONS INSTALLER ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS, SACRAMENTO, T | $40.00 | $25.50 | $65.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM: SOUND & COMMUNICATIONS TECHNICIAN ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS, SACRAMENTO | $46.00 | $25.68 | $71.68 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 F | $54.10 | $34.69 | $88.79 Top 10% +202% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER: DIVER WET DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATUR | $103.62 | $34.69 | $138.31 Top 10% +371% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR | $59.51 | $34.69 | $94.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR | $60.51 | $34.69 | $95.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER ALPINE, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN; MARIN, MODOC, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIY | $59.63 | $31.29 | $90.92 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS | $45.92 | $31.26 | $77.18 Bottom 10% +144% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS | $47.27 | $31.26 | $78.53 Above median +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS | $52.65 | $31.26 | $83.91 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER | $22.97 | $18.22 | $41.19 Bottom 10% +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER | $23.64 | $18.22 | $41.86 Above median +32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER | $26.33 | $18.22 | $44.55 Top 10% +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHAMA, TRINITY, YOLO | $52.70 | $38.68 | $91.38 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN MARIN AND SONOMA COUNTIES | $59.17 | $32.04 | $91.21 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN MODOC AND SISKIYOU COUNTIES | $47.04 | $21.84 | $68.88 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN NAPA AND SOLANO COUNTIES | $61.56 | $31.13 | $92.69 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEA | $84.05 | $38.44 | $122.49 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK; NIPPER TRUCK; CONCRETE PUMP TR | $43.26 | $34.28 | $77.54 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLANO, SUTTER | $43.25 | $35.62 | $78.87 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER MARIN , NAPA & SONOMA COUNTIES; SOLANO COUNTY | $56.22 | $34.00 | $90.22 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GUNITING OR SHOT CRETE FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE | $36.08 | $27.30 | $63.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER; DRILLER TE | $35.35 | $27.30 | $62.65 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER; DRILLER TE | $36.35 | $27.30 | $63.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HONEY LAKE); NEVADA COUNTY; PLACER COUNTY AND SIERRA COUNTY) | $34.27 | $16.47 | $50.74 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HONEY LAKE); NEVADA COUNTY; PLACER COUNTY; AND SIERRA COUNTY | $44.29 | $16.12 | $60.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HONEY LAKE); NEVADA COUNTY; PLACER COUNTY; AND SIERRA COUNTY | $42.79 | $16.12 | $58.91 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HOUR ADDITIONAL. WORK FROM SWINGING SCAFFOLDS, BOATSWAINS CHAIRS OR SIMILAR DEVICES: $.75 PER HOUR ADDITIONAL | $71.60 | $38.38 | $109.98 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER AREA 1 | $28.76 | $22.53 | $51.29 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER AREA 2 | $26.11 | $22.53 | $48.64 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER ALPINE, LASSEN, MODOC, SISKIYOU AND TRINITY COUNTIES | $43.75 | $34.45 | $78.20 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER AMADOR, BUTTE, COLUSA,EL DORADO, GLENN,MARIN, NAPA, NEVADA, PLACER,PLUMAS, SACRAMENTO, SHASTA, SIERRA, SOLANO, SONOMA, SUTTER, TEHAMA, YOLO | $50.70 | $35.15 | $85.85 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: MARIN AND NAPA COUNTIES | $37.75 | $29.69 | $67.44 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: REMAINING COUNTIES | $36.75 | $29.69 | $66.44 Top 10% +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLD | $36.50 | $27.30 | $63.80 Above median +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A: GROUP 3 REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0 | $36.37 | $27.30 | $63.67 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A:: GROUP 1 | $37.46 | $27.30 | $64.76 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 1- GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BEL | $36.46 | $27.30 | $63.76 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLD | $35.96 | $27.30 | $63.26 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 2: NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOL | $35.96 | $27.30 | $63.26 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 3 REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0 | $35.37 | $27.30 | $62.67 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 3: REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0 | $35.37 | $27.30 | $62.67 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE | $35.25 | $27.30 | $62.55 Bottom 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 4: GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIV | $35.25 | $27.30 | $62.55 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B:: GROUP 1 | $36.46 | $27.30 | $63.76 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON | $36.26 | $27.32 | $63.58 +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON | $37.26 | $27.32 | $64.58 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON | $37.26 | $27.30 | $64.56 Above median +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON NAPA, SOLANO, AND SONOMA, COUNTIES | $36.26 | $27.30 | $63.56 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I | $36.56 | $27.32 | $63.88 +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I | $37.56 | $27.32 | $64.88 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE. MAR | $37.56 | $27.30 | $64.86 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II | $34.06 | $27.32 | $61.38 +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II | $35.06 | $27.32 | $62.38 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH | $35.06 | $27.30 | $62.36 Above median +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH | $36.56 | $27.30 | $63.86 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA A:: GROUP 1.$ 36.50 27.30 LABORER, WRECKING - AREA A: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR | $36.35 | $27.30 | $63.65 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA B: GROUP 1- SKILLED WRECKER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL REC | $35.50 | $27.30 | $62.80 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled wrecker NAPA, SOLANO, AND SONOMA COUNTIES) FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAI | $35.35 | $27.30 | $62.65 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA B: GROUP 2: SEMI-SKILLED WRECKER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHAL | $35.35 | $27.30 | $62.65 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA B:: GROUP 1 | $35.50 | $27.30 | $62.80 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK; CAST-IN- PLACE MANHOLE FORM S | $36.20 | $27.30 | $63.50 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:- Establishment Warranty Period | $29.94 | $27.30 | $57.24 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:- New Construction | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:- Establishment Warranty Period | $28.94 | $27.30 | $56.24 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:- New Construction | $35.25 | $27.30 | $62.55 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIY | $36.29 | $25.55 | $61.84 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK MARIN COUNTY | $37.54 | $25.55 | $63.09 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK SOLANO AND SONOMA COUNTIES | $36.84 | $26.24 | $63.08 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BE | $35.55 | $27.30 | $62.85 Bottom 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BE | $36.55 | $27.30 | $63.85 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER MARIN & SONOMA COUNTIES | $77.35 | $36.53 | $113.88 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LEAD INSTALLER AREA 3.$ 27.96 23.03 LEAD INSTALLER AREA 2.$ 29.08 23.03 LEAD INSTALLER AREA 1.$ 32.21 23.03 INSTALLER AREA 3 | $25.16 | $22.53 | $47.69 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVIN | $70.16 | $24.71 | $94.87 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: CABLE SPLICER DEL NORTE, MODOC & SISKIYOU COUNTIES | $67.80 | $25.20 | $93.00 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT SPECIALIST OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIST | $53.30 | $22.26 | $75.56 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN ALL COUNTIES EXCEPT DEL NORTE, MODOC & SISKIYOU HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY | $40.76 | $21.76 | $62.52 Top 10% +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN, POLE SPRAYER, HEAVY LINE EQUIPMENT MAN DEL NORTE, MODOC & SISKIYOU COUNTIES | $60.54 | $24.87 | $85.41 Top 10% +45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE FINISHER | $42.06 | $19.80 | $61.86 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE MASON | $61.72 | $30.31 | $92.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MASTER INSTALLER AREA 1 | $36.43 | $23.03 | $59.46 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MASTER INSTALLER AREA 2 | $32.71 | $23.03 | $55.74 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MASTER INSTALLER AREA 3 | $31.38 | $23.03 | $54.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO | $35.72 | $27.30 | $63.02 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO | $36.72 | $27.30 | $64.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 1 | $66.96 | $32.53 | $99.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 2 | $65.43 | $32.53 | $97.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 3 | $63.95 | $32.53 | $96.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 4 | $62.57 | $32.53 | $95.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 5 | $61.30 | $32.53 | $93.83 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 6 | $59.98 | $32.53 | $92.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 7 | $58.84 | $32.53 | $91.37 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8 | $57.70 | $32.53 | $90.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A | $55.49 | $32.53 | $88.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 1 | $68.59 | $32.53 | $101.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 2 | $66.08 | $32.53 | $98.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 | $60.61 | $32.53 | $93.14 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 | $64.34 | $32.53 | $96.87 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4 | $61.30 | $32.53 | $93.83 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 | $57.85 | $28.56 | $86.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 | $55.85 | $28.56 | $84.41 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 | $54.25 | $28.56 | $82.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 | $52.25 | $28.56 | $80.81 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 | $49.64 | $28.56 | $78.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 | $47.64 | $28.56 | $76.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 | $45.66 | $31.15 | $76.81 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 | $43.38 | $31.15 | $74.53 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 | $52.64 | $31.15 | $83.79 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 | $45.41 | $31.15 | $76.56 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 | $43.11 | $31.15 | $74.26 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 | $50.82 | $31.15 | $81.97 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 | $45.12 | $31.15 | $76.27 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 | $42.89 | $31.15 | $74.04 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 | $49.14 | $31.15 | $80.29 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 4 | $47.37 | $31.15 | $78.52 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 5 | $44.73 | $31.15 | $75.88 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 6 | $42.50 | $31.15 | $73.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 1 | $68.81 | $32.53 | $101.34 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 2 | $67.04 | $32.53 | $99.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 | $65.56 | $32.53 | $98.09 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 4 | $63.54 | $32.53 | $96.07 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5 | $62.24 | $32.53 | $94.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES | $58.19 | $32.53 | $90.72 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES | $59.33 | $32.53 | $91.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES | $60.47 | $32.53 | $93.00 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES | $61.80 | $32.53 | $94.33 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO | $63.06 | $32.53 | $95.59 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $58.09 | $32.53 | $90.62 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $59.23 | $32.53 | $91.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $60.37 | $32.53 | $92.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $61.70 | $32.53 | $94.23 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $65.43 | $32.53 | $97.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $62.96 | $32.53 | $95.49 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH AND ROLLER EL DORADO COUNTY; LASSEN COUNTY; NEVADA COUNTY; PLACER COUNTY; AND SIERRA COUNTY PREMIUMS: SPECIAL COATINGS, AND SANDBLASTI | $39.43 | $16.16 | $55.59 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: PAPERHANGER (EL DORADO COUNTY; LASSEN COUNTY; NEVADA COUNTY; PLACER COUNTY; AND SIERRA COUNTY PREMIUMS: SPECIAL COATINGS, AND SANDBLASTING = | $42.19 | $16.16 | $58.35 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY PAINTER EL DORADO COUNTY; LASSEN COUNTY; NEVADA COUNTY; PLACER COUNTY; AND SIERRA COUNTY PREMIUMS: SPECIAL COATINGS, AND SANDBLASTING | $41.43 | $16.16 | $57.59 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER | $34.71 | $17.62 | $52.33 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO | $40.83 | $17.62 | $58.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING | $35.11 | $17.62 | $52.73 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $54.10 | $34.69 | $88.79 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER AREA 295: ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SOLA | $32.70 | $31.68 | $64.38 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER AREA 355: MARIN | $36.73 | $31.68 | $68.41 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER AREA 355: NAPA & SONOMA COUNTIES | $32.70 | $31.68 | $64.38 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AMADOR AND ALPINE COUNTIES | $58.45 | $38.74 | $97.19 Top 10% +196% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER BUTTE, COLUSA, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY & YUBA COUNTIES | $52.75 | $41.39 | $94.14 Top 10% +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PLUMBER, STEAMFITTER, REFRIGERATION FITTER | $91.00 | $49.40 | $140.40 Top 10% +327% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER EL DORADO COUNTY; NEVADA COUNTY; AND PLACER COUNTY | $52.14 | $18.71 | $70.85 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER: JOURNEYMAN AMADOR, EL DORADO, NEVADA; PLACER, SACRAMENTO AND YOLO COUNTIES | $67.37 | $30.00 | $97.37 Top 10% +196% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER: LIGHT COMMERCIAL WORK AMADOR, EL DORADO, NEVADA; PLACER, SACRAMENTO AND YOLO COUNTIES | $55.58 | $24.02 | $79.60 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER ALPINE, BUTTE, COLUSA, EL DORADO, GLENN,LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SISKIYOU, SUTTER, TEHAMA, TRINITY, Y | $46.73 | $21.36 | $68.09 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER MARIN, NAPA, SOLANO AND SONOMA COUNTIES | $54.94 | $23.34 | $78.28 Top 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DE | $36.05 | $27.30 | $63.35 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER ALPINE COUNTY | $43.50 | $37.42 | $80.92 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER AMADOR, COLUSA, EL DORADO, NEVADA, PLACER, SACRAMENTO, SUTTER, YOLO AND YUBA COUNTIES | $47.85 | $41.90 | $89.75 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: ALL OTHER WORK MARIN, NAPA, SOLANO SONOMA & TRINITY COUNTIES | $64.06 | $46.83 | $110.89 Top 10% +190% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: MECHANICAL CONTRACTS $200,000 OR LESS MARIN, NAPA, SOLANO SONOMA & TRINITY COUNTIES | $55.92 | $45.29 | $101.21 Top 10% +164% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: MECHANICAL JOBS $200,000 & UNDER BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU AND TEHAMA COUNTIES | $35.16 | $35.88 | $71.04 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: MECHANICAL JOBS OVER $200,000 BUTTE, GLENN, LASSEN, MODOC, PLUMAS, SHASTA, SIERRA, SISKIYOU AND TEHAMA COUNTIES | $46.60 | $40.21 | $86.81 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: METAL DECKING AND SIDING ONLY BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA | $44.45 | $35.55 | $80.00 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER ALPINE; COLUSA; EL DORADO; GLENN; LASSEN; MODOC; NEVADA; PLACER; PLUMAS; SACRAMENTO; SHASTA; SIERRA; SISKIYOU; SUTTER; TEHAMA; TRINIT | $48.54 | $26.59 | $75.13 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER MARIN, NAPA, SOLANO AND SONOMA COUNTIES | $59.00 | $33.03 | $92.03 Top 10% +215% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER MARIN & SONOMA COUNTIES SCOPE OF WORK INCLUDES- SOUND & VOICE TRANSMISSION; FIRE ALARM SYSTEMS [EXCLUDING FIRE ALARM | $53.08 | $30.84 | $83.92 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER NAPA AND SOLANO COUNTIES SCOPE OF WORK INCLUDES- SOUND & VOICE TRANSMISSION; FIRE ALARM SYSTEMS [EXCLUDING FIRE ALAR | $53.08 | $30.84 | $83.92 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: TECHNICIAN MARIN & SONOMA COUNTIES SCOPE OF WORK INCLUDES- SOUND & VOICE TRANSMISSION; FIRE ALARM SYSTEMS [EXCLUDING FIRE ALAR | $61.04 | $31.08 | $92.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: TECHNICIAN NAPA AND SOLANO COUNTIES SCOPE OF WORK INCLUDES- SOUND & VOICE TRANSMISSION; FIRE ALARM SYSTEMS [EXCLUDING FIRE ALA | $61.04 | $31.08 | $92.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $52.06 | $29.86 | $81.92 Above median +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER MARIN, NAPA, SOLANO AND SONOMA COUNTIES | $81.54 | $41.35 | $122.89 Top 10% +274% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TR | $44.21 | $34.28 | $78.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $44.93 | $20.98 | $65.91 Top 10% +240% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $60.58 | $29.79 | $90.37 Top 10% +366% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER | $62.61 | $39.55 | $102.16 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER | $60.61 | $39.55 | $100.16 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER AREA 1: BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO, YUBA | $35.00 | $17.44 | $52.44 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER AREA 2: ALPINE, AMADOR | $34.76 | $19.22 | $53.98 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER AREA 3: MARIN, NAPA, SOLANO, SISKIYOU | $37.75 | $19.28 | $57.03 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER AREA 4: SONOMA | $35.78 | $19.23 | $55.01 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER AREA 1: BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SHASTA, SIERRA, SUTTER, TEHEMA, YOLO, YUBA | $55.55 | $21.08 | $76.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER AREA 3: MARIN, NAPA, SOLANO, SISKIYOU..$ 59.92 22.62 TILE LAYER AREA 2: ALPINE, AMADOR | $55.17 | $22.52 | $77.69 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER AREA 4: SONOMA | $56.79 | $22.54 | $79.33 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDE | $37.20 | $27.30 | $64.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK; BULK CEMENT SPREADER; DUMPCRETE TRUCK; SKID TRUCK; DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YA | $44.56 | $34.28 | $78.84 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN | $45.89 | $27.72 | $73.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 1: DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN | $45.89 | $27.72 | $73.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE | $45.66 | $27.72 | $73.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 2: RODMEN; SHAFT WORK & RAISE | $45.66 | $27.72 | $73.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUN | $45.41 | $27.72 | $73.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 3: BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TU | $45.41 | $27.72 | $73.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING | $44.96 | $27.72 | $72.68 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 4: VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING | $44.96 | $27.72 | $72.68 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN | $44.42 | $27.72 | $72.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 5: GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN | $44.42 | $27.72 | $72.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NEVADA, PLACER, PLUMAS, SACRAMENTO, SH | $46.41 | $27.72 | $74.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST MARIN COUNTY | $46.41 | $27.72 | $74.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST NAPA, SOLANO, AND SONOMA COUNTIES | $46.41 | $27.72 | $74.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER ALPINE, AMADOR, BUTTE, COLUSA, EL DORADO, GLENN, LASSEN, MODOC, NAPA, NEVADA, PLACER, PLUMAS, SACRAMENTO | $36.01 | $18.50 | $54.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR; RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION | $43.56 | $34.28 | $77.84 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAIL | $43.86 | $34.28 | $78.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $35.50 | $27.30 | $62.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $37.05 | $27.30 | $64.35 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $28.94 | $27.30 | $56.24 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $35.25 | $27.30 | $62.55 | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $35.35 | $27.30 | $62.65 | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $35.72 | $27.30 | $63.02 | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $36.20 | $27.30 | $63.50 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Sutter, CA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Sutter
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Sutter, California.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.