Heavy Construction — Santa Cruz, California
WD CA20260018-16358-hvy · Revision 5 · Effective May 17, 2026
The Davis-Bacon prevailing wage for $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. T in Santa Cruz, California (construction type: heavy) is $37.05/hr base + $27.30/hr fringe = $64.35/hr total package (WD CA20260018-16358-hvy, Rev. 5).
Scroll down for all 328 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| $4.00 PER DAY ABOVE GROUP 1 WAGE RATES. ""SEWER CLEANER"" MEANS ANY WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. T | $37.05 | $27.30 | $64.35 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT | $59.51 | $34.69 | $94.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATURATION DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RAT | $64.51 | $34.69 | $99.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ADDITIONAL OVER 180 FEET - $6.00 PER HOUIR ADDITIONAL | $53.38 | $28.04 | $81.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ADDITIONAL PER HOUR | $43.45 | $22.80 | $66.25 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| AND GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; J | $35.25 | $27.30 | $62.55 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN | $29.94 | $27.30 | $57.24 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN | $36.50 | $27.30 | $63.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN | $36.08 | $27.30 | $63.38 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN | $36.05 | $27.30 | $63.35 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN | $35.55 | $27.30 | $62.85 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDERGROUN | $35.50 | $27.30 | $62.80 | $0.00 | $0.00 | $0.00 | $0.00 |
| APPLY TO ALL EMPLOYEES FOR EACH AND EVERY DAY WORKED ON OR IN THE EXCAVATION OF THE FOOTING FROM THE DATE OF INCEPTION. FOOTNOTES: LABORERS WORKING OF | $38.70 | $29.89 | $68.59 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| AREA EXTENDING 5 MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE | $70.41 | $33.76 | $104.17 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER: INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF | $44.73 | $12.75 | $57.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $64.56 | $25.07 | $89.63 Above median +318% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $84.76 | $25.07 | $109.83 Top 10% +412% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $45.60 | $38.99 | $84.59 Above median +64% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $49.62 | $41.27 | $90.89 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR | $57.65 | $39.55 | $97.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BORDER WITH SHASTA COUNTY AREA 2: REMAINDER MADERA COUNTY: AREA 1: EXCEPT EASTERN PART AREA 2: EASTERN PART MARIPOSA COUNTY AREA 1: EXCEPT EASTERN PAR | $55.65 | $39.55 | $95.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICK TENDER FOOTNOTES: WORK ON JOBS WHERE HEAT-PROTECTIVE CLOTHING IS REQUIRED: $2.00 PER HOUR ADDITIONAL. WORK AT GRINDERS: $.25 PER HOUR ADDITIONAL | $37.05 | $27.45 | $64.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER ALAMEDA, CONTRA COSTA, SAN BENITO, SANTA CLARA) | $56.94 | $26.28 | $83.22 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER CALAVERAS, SAN JOAQUIN, STANISLAUS, TOULUMNE | $52.76 | $25.01 | $77.77 Top 10% +144% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER FRESNO, KINGS, MADERA, MARIPOSA, MERCED | $51.17 | $25.80 | $76.97 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER MONTEREY, SANTA CRUZ | $54.18 | $27.82 | $82.00 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER SAN FRANCISCO, SAN MATEO | $57.02 | $28.50 | $85.52 Top 10% +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL | $29.94 | $27.30 | $57.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANER; MATERIAL CLEANER. THE CLASSIFICATION ""MATERIAL CL | $28.94 | $27.30 | $56.24 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH | $53.23 | $39.55 | $92.78 | $0.00 | $0.00 | $0.00 | $0.00 |
| BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH | $56.53 | $39.55 | $96.08 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH | $51.23 | $39.55 | $90.78 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BUT THE WESTERN BORDER WITH MENDOCINO & TRINITY COUNTIES AREA 2: REMAINDER TRINITY COUNTY: AREA 1: EAST CENTRAL PART AND THE NORTHEASTERN BORDER WITH | $54.53 | $39.55 | $94.08 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $74.54 | $36.09 | $110.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $87.40 | $49.41 | $136.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER | $104.68 | $49.46 | $154.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER | $60.39 | $33.52 | $93.91 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER | $52.65 | $30.82 | $83.47 Bottom 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: BRIDGE BUILDER/HIGHWAY CARPENTER | $54.85 | $31.49 | $86.34 Above median +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $60.54 | $33.52 | $94.06 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $52.80 | $30.82 | $83.62 Above median +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $46.92 | $30.82 | $77.74 Bottom 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $55.00 | $31.49 | $86.49 Above median +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $49.12 | $31.49 | $80.61 +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER | $47.77 | $31.49 | $79.26 +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR, SAW FILER KINGS COUNTY | $47.77 | $31.49 | $79.26 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $60.39 | $33.52 | $93.91 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $52.65 | $30.82 | $83.47 Above median +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $46.77 | $30.82 | $77.59 Bottom 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $54.85 | $31.49 | $86.34 Above median +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $48.97 | $31.49 | $80.46 +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER | $47.62 | $31.49 | $79.11 +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER.$ 45.42 30.82 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR | $45.57 | $30.82 | $76.39 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER.$ 60.39 33.52 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR | $60.54 | $33.52 | $94.06 Top 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: JOURNEYMAN CARPENTER..$ 48.97 31.49 CARPENTERS: HARDWOOD FLOORLAYER, SHINGLER, POWER SAW OPERATOR, STEEL SCAFFOLD & STEEL SHORING ERECTOR | $49.12 | $31.49 | $80.61 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $47.92 | $32.41 | $80.33 Bottom 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $60.49 | $35.11 | $95.60 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $52.75 | $32.41 | $85.16 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $49.27 | $32.41 | $81.68 +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $54.95 | $33.08 | $88.03 Above median +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $51.47 | $33.08 | $84.55 Above median +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $50.12 | $33.08 | $83.20 +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT.$ 50.12 33.08 CARPENTERS: JOURNEYMAN CARPENTER | $47.62 | $31.49 | $79.11 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $32.15 | $23.27 | $55.42 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM: INSTALLER SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE | $45.28 | $28.01 | $73.29 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OTH | $45.28 | $28.01 | $73.29 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM: TECHNICIAN SCOPE OF WORK INCLUDES THE INSTALLATION TESTING, SERVICE AND MAINTENANCE, OF THE FOLLOWING SYSTEMS WHICH UTILIZE THE | $52.07 | $28.21 | $80.28 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COMMUNICATIONS SYSTEM: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT | $52.07 | $28.21 | $80.28 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| COUNTIES) FINAL CLEAN-UP WORK OF DEBRIS, GROUNDS AND BUILDING INCLUDING BUT NOT LIMITED TO: STREET CLEANER; CLEANING AND WASHING WINDOWS; BRICK CLEANE | $28.94 | $27.30 | $56.24 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER: ASSISTANT TENDER, ROV TENDER/TECHNICIAN DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 F | $54.10 | $34.69 | $88.79 Top 10% +202% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER: DIVER WET DEPTH PAY: 050 TO 100 FT $2.00 PER FOOT 101 TO 150 FT $3.00 PER FOOT 151 TO 220 FT $4.00 PER FOOT 221 FT.-DEEPER $5.00 PER FOOT SATUR | $103.62 | $34.69 | $138.31 Top 10% +371% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR | $59.51 | $34.69 | $94.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVING: THE STANDBY RATE SHALL APPLY UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WOR | $60.51 | $34.69 | $95.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $59.63 | $31.29 | $90.92 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $63.76 | $32.69 | $96.45 Top 10% +188% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS | $45.92 | $31.26 | $77.18 Bottom 10% +144% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS | $47.27 | $31.26 | $78.53 Above median +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS | $46.77 | $31.26 | $78.03 +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS | $52.65 | $31.26 | $83.91 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER | $22.97 | $18.22 | $41.19 Bottom 10% +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER | $23.64 | $18.22 | $41.86 Above median +32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER | $23.39 | $18.22 | $41.61 +31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL STOCKER/SCRAPPER | $26.33 | $18.22 | $44.55 Top 10% +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $91.25 | $48.05 | $139.30 Top 10% +279% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.00 | $30.15 | $80.15 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $66.26 | $35.84 | $102.10 Top 10% +177% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $76.00 | $49.07 | $125.07 Top 10% +240% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $86.00 | $51.07 | $137.07 Top 10% +272% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN CABLE SPLICER = 110% OF JOURNEYMAN ELECTRICIAN | $48.50 | $30.09 | $78.59 Top 10% +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN FOOTNOTES: WORK UNDER COMPRESSED AIR OR WHERE GAS MASKS ARE REQUIRED, ORWORK ON LADDERS, SCAFFOLDS, STACKS, ""BOSUN'S CHAIRS,"" OR OTHER S | $91.03 | $49.05 | $140.08 Top 10% +281% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN ZONE B: ANY AREA OUTSIDE OF ZONE A | $77.45 | $33.97 | $111.42 Top 10% +203% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ALL OTHER WORK | $49.45 | $31.96 | $81.41 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: TUNNEL WORK | $51.92 | $32.04 | $83.96 Top 10% +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEA | $84.05 | $38.44 | $122.49 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FOR THE POWER UNIT OR THE EQUIPMENT UTILIZED. TRUCK DRIVERS: GROUP 1: DUMP TRUCKS, UNDER 6 YDS.; SINGLE UNIT FLAT RACK; NIPPER TRUCK; CONCRETE PUMP TR | $43.26 | $34.28 | $77.54 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTI | $36.25 | $27.30 | $63.55 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GENERAL LABORER; DUMP, LOAD SPOTTER; FLAG PERSON; FIRE WATCHER; FENCE ERECTOR; GUARDRAIL ERECTOR; GARDENER, HORTICULTURAL AND LANDSCAPE LABORER; JETTI | $35.25 | $27.30 | $62.55 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $44.33 | $28.88 | $73.21 Above median +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $56.22 | $34.00 | $90.22 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING, JR. DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSG | $43.25 | $35.62 | $78.87 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GUNITING OR SHOT CRETE FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HOUR ABOVE THE | $36.08 | $27.30 | $63.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER; DRILLER TE | $36.35 | $27.30 | $63.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HANDLING DRY CEMENT OR GYPSUM; CHOKE-SETTER AND RIGGER; CONCRETE BUCKET DUMPER AND CHUTE; CONCRETE CHIPPING AND GRINDING; CONCRETE LABORER; DRILLER TE | $35.35 | $27.30 | $62.65 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER AREA 1 | $28.76 | $22.53 | $51.29 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSTALLER AREA 2 | $26.11 | $22.53 | $48.64 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: FENCE ERECTOR | $45.78 | $26.51 | $72.29 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $50.70 | $35.15 | $85.85 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: FENCE ERECTOR | $45.78 | $26.51 | $72.29 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL | $55.33 | $35.15 | $90.48 Bottom 10% +161% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: ORNAMENTAL, REINFORCING AND STRUCTURAL | $55.83 | $35.15 | $90.98 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER GROUP 1-f CALAVERAS AND SAN JOAQUIN COUNTIES | $30.37 | $29.89 | $60.26 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 1 | $39.15 | $30.03 | $69.18 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, ASBESTOS/MOLD/LEAD LABORER: AREA 2 | $38.15 | $30.03 | $68.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, BRICK: MASON TENDER-BRICK | $36.29 | $25.55 | $61.84 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A: CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORER | $37.20 | $27.30 | $64.50 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA A:: GROUP 1 | $36.50 | $27.30 | $63.80 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, CONSTRUCTION CRAFT LABORERS - AREA B: CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORER | $36.20 | $27.30 | $63.50 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, CONSTRUCTION CRAFT LABORERS: CONSTRUCTION SPECIALIST GROUP ASPHALT IRONER AND RAKER; CHAINSAW; LASER BEAM IN CONNECTION WITH LABORERS' WORK | $38.85 | $29.89 | $68.74 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, CONSTRUCTION CRAFT LABORERS: GROUP 1- ASPHALT SPREADER BOXES; BARKO, WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPP | $38.15 | $29.89 | $68.04 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLD | $36.50 | $27.30 | $63.80 Above median +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLD | $36.70 | $27.30 | $64.00 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A: GROUP 3 REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0 | $36.37 | $27.30 | $63.67 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A: GROUP 3REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.2 | $36.37 | $27.30 | $63.67 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A:: GROUP 1 | $37.46 | $27.30 | $64.76 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA A:: GROUP 1.$ 37.46 27.30 LABORER, GUNITE - AREA A: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS' | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 1 | $36.46 | $27.30 | $63.76 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 1- GROUP 1: STRUCTURAL NOZZLEMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BEL | $36.46 | $27.30 | $63.76 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLD | $35.96 | $27.30 | $63.26 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 3 REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0 | $35.37 | $27.30 | $62.67 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE | $35.96 | $27.30 | $63.26 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE | $35.37 | $27.30 | $62.67 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B: GROUP 4 Gunite laborer FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE | $35.25 | $27.30 | $62.55 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE - AREA B:: GROUP 1 | $36.46 | $27.30 | $63.76 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS | $39.11 | $29.89 | $69.00 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE: GROUP 3 REBOUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PER HO | $38.02 | $29.89 | $67.91 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GUNITE: GROUP 4 GUINTE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE $0.25 PE | $37.90 | $29.89 | $67.79 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, PLASTER TENDER | $39.77 | $28.54 | $68.31 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 Bottom 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $40.68 | $29.68 | $70.36 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON | $37.26 | $27.30 | $64.56 Above median +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: ESCORT DRIVER, FLAG PERSON | $36.26 | $27.30 | $63.56 Bottom 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I | $36.56 | $27.30 | $63.86 Bottom 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I | $37.56 | $27.30 | $64.86 Above median +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE | $36.56 | $27.30 | $63.86 Bottom 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON I LAYOUT OF TRAFFIC CONTROL, CRASH CUSHIONS, CONSTRUCTION AREA AND ROADSIDE SIGNAGE | $37.56 | $27.30 | $64.86 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II | $34.06 | $27.30 | $61.36 Bottom 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II | $35.06 | $27.30 | $62.36 Above median +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH | $34.06 | $27.30 | $61.36 Bottom 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, TRAFFIC CONTROL/LANE CLOSURE: TRAFFIC CONTROL PERSON II INSTALLATION AND REMOVAL OF TEMPORARY/PERMANENT SIGNS, MARKERS, DELINEATORS AND CRASH | $35.06 | $27.30 | $62.36 Above median +114% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA A: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL | $36.35 | $27.30 | $63.65 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA A:: GROUP 1 | $36.50 | $27.30 | $63.80 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA A:: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHAL | $36.35 | $27.30 | $63.65 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA B: GROUP 1- SKILLED WRECKER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL REC | $35.50 | $27.30 | $62.80 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA B: GROUP 2 SEMI-SKILLED WRECKER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL | $35.35 | $27.30 | $62.65 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL | $35.50 | $27.30 | $62.80 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA B: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL | $35.35 | $27.30 | $62.65 Bottom 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING - AREA B:: GROUP 1 | $35.50 | $27.30 | $62.80 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING: GROUP 1 | $38.15 | $29.89 | $68.04 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, WRECKING: GROUP 2 Semi-skilled wrecker FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEIVE | $38.00 | $29.89 | $67.89 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:- Establishment Warranty Period | $29.94 | $27.30 | $57.24 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:- New Construction | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B- Establishment Warranty Period | $28.94 | $27.30 | $56.24 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B- New Construction | $35.25 | $27.30 | $62.55 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:- Establishment Warranty Period | $28.94 | $27.30 | $56.24 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:- New Construction | $35.25 | $27.30 | $62.55 Top 10% +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS- Establishment Warranty Period | $31.59 | $29.89 | $61.48 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS- New Construction | $37.90 | $29.89 | $67.79 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A:- Establishment Warranty Period | $29.94 | $27.30 | $57.24 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A:- New Construction | $36.25 | $27.30 | $63.55 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER-BRICK | $36.29 | $25.55 | $61.84 Top 10% +112% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BE | $36.55 | $27.30 | $63.85 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS' WORK; SYNTHETIC THERMOPLASTICS AND SIMILAR TYPE WELDING FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BE | $35.55 | $27.30 | $62.85 Bottom 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 2 NOZZLEMAN, GUNMAN, POTMAN, GROUNDMAN FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFO | $36.96 | $27.30 | $64.26 Top 10% +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A: GROUP 4 GUNITE LABORER FOOTNOTES: LABORERS WORKING OFF OR WITH OR FROM BOS'N CHAIRS, SWINGING SCAFFOLDS, BELTS SHALL RECEI | $36.37 | $27.30 | $63.67 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS:, GUNITE - AREA A:: GROUP 1 | $37.46 | $27.30 | $64.76 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE/IRRIGATION FITTER: UNDERGROUND/UTILITY FITTER | $77.35 | $36.53 | $113.88 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LEAD INSTALLER AREA 3.$ 27.96 23.03 LEAD INSTALLER AREA 2.$ 29.08 23.03 LEAD INSTALLER AREA 1.$ 32.21 23.03 INSTALLER AREA 3 | $25.16 | $22.53 | $47.69 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS | $53.30 | $22.26 | $75.56 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DA | $40.76 | $21.76 | $62.52 Top 10% +6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVI | $70.16 | $24.71 | $94.87 Top 10% +61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE FINISHER | $42.06 | $19.80 | $61.86 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE MASON | $61.72 | $30.31 | $92.03 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON TENDER, BRICK SAN FRANCISCO AND SAN MATEO COUNTIES FOOTNOTES: UNDERGROUND WORK SUCH AS SEWERS, MANHOLES, CATCH BASINS, SEWER PIPES, TELEPHONE CO | $37.05 | $27.45 | $64.50 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MASTER INSTALLER AREA 1 | $36.43 | $23.03 | $59.46 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MASTER INSTALLER AREA 2 | $32.71 | $23.03 | $55.74 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MASTER INSTALLER AREA 3 | $31.38 | $23.03 | $54.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO | $36.72 | $27.30 | $64.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MODEL DH143 AND SIMILAR TYPE DRILLS; TRACK DRILLER; JACK LEG DRILLER; WAGON DRILLER; MECHANICAL DRILLERS, ALL TYPES REGARDLESS OF TYPE OR METHOD OF PO | $35.72 | $27.30 | $63.02 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 1 | $66.96 | $32.53 | $99.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 2 | $65.43 | $32.53 | $97.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 3 | $63.95 | $32.53 | $96.48 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 4 | $62.57 | $32.53 | $95.10 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 5 | $61.30 | $32.53 | $93.83 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 6 | $59.98 | $32.53 | $92.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 7 | $58.84 | $32.53 | $91.37 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8 | $57.70 | $32.53 | $90.23 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, AREA 1:: GROUP 8-A | $55.49 | $32.53 | $88.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 1 | $68.59 | $32.53 | $101.12 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 2 | $66.08 | $32.53 | $98.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 | $59.98 | $32.53 | $92.51 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 3 | $64.34 | $32.53 | $96.87 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, CRANES AND ATTACHMENTS - AREA 1:: GROUP 4 | $61.30 | $32.53 | $93.83 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 | $57.85 | $28.56 | $86.41 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 1 | $55.85 | $28.56 | $84.41 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 | $54.25 | $28.56 | $82.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 2 | $52.25 | $28.56 | $80.81 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 | $49.64 | $28.56 | $78.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, LANDSCAPE WORK ONLY: GROUP 3 | $47.64 | $28.56 | $76.20 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 | $45.66 | $31.15 | $76.81 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 | $43.38 | $31.15 | $74.53 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 1 | $52.64 | $31.15 | $83.79 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 | $45.41 | $31.15 | $76.56 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 | $43.11 | $31.15 | $74.26 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 2 | $50.82 | $31.15 | $81.97 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 | $45.12 | $31.15 | $76.27 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 | $42.89 | $31.15 | $74.04 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 3 | $49.14 | $31.15 | $80.29 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 4 | $47.37 | $31.15 | $78.52 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 5 | $44.73 | $31.15 | $75.88 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, PILEDRIVING - AREA 1:: GROUP 6 | $42.50 | $31.15 | $73.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 1 | $68.81 | $32.53 | $101.34 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 2 | $67.04 | $32.53 | $99.57 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 3 | $65.56 | $32.53 | $98.09 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 4 | $63.54 | $32.53 | $96.07 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION - AREA 1:: GROUP 5 | $62.24 | $32.53 | $94.77 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES | $58.19 | $32.53 | $90.72 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES | $59.33 | $32.53 | $91.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES | $60.47 | $32.53 | $93.00 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES | $61.80 | $32.53 | $94.33 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: SHAFTS, STOPES, RAISES:.$ 65.53 32.53 OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGRO | $63.06 | $32.53 | $95.59 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $58.09 | $32.53 | $90.62 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $59.23 | $32.53 | $91.76 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $60.37 | $32.53 | $92.90 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $61.70 | $32.53 | $94.23 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $65.43 | $32.53 | $97.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT, TUNNEL AND UNDERGROUND WORK - AREA 1:: UNDERGROUND | $62.96 | $32.53 | $95.49 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $57.00 | $28.04 | $85.04 Top 10% +208% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.25 ADDITIO | $34.49 | $21.80 | $56.29 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHER/TAPER FOOTNOTE: SPRAY PAINTERS & PAPERHANGERS RECIVE $1.00 ADDITIONAL PER HOUR. PAINTERS DOING DRYWALL PATCHING RECEIVE $1.2 | $35.74 | $21.80 | $57.54 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMEMT: GROUP 2 GAMECOURT & PLAYGROUND INSTALLER | $34.71 | $17.62 | $52.33 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 1 STRIPER: LAYOUT AND APPLICATION OF PAINTED TRAFFIC STRIPES AND MARKING; HOT THERMO | $40.83 | $17.62 | $58.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: HIGHWAY IMPROVEMENT: GROUP 3 PROTECTIVE COATING, PAVEMENT SEALING | $35.11 | $17.62 | $52.73 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $54.10 | $34.69 | $88.79 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: CONTRA COSTA COUNTY | $80.50 | $50.45 | $130.95 Top 10% +298% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $42.41 | $30.73 | $73.14 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $32.88 | $31.68 | $64.56 Above median +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $32.70 | $31.68 | $64.38 Above median +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $39.77 | $28.54 | $68.31 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL | $41.93 | $30.32 | $72.25 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER & STEAMFITTER | $57.75 | $43.60 | $101.35 Top 10% +208% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER & STEAMFITTER | $54.50 | $42.54 | $97.04 Bottom 10% +195% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER & STEAMFITTER | $58.45 | $38.74 | $97.19 Above median +196% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER: ALL OTHER WORK | $68.57 | $49.04 | $117.61 Top 10% +258% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER: REFRIGERATION | $67.68 | $49.04 | $116.72 Top 10% +255% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PIPEFITTER, STEAMFITTER | $80.50 | $50.45 | $130.95 Top 10% +298% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER, PLUMBER, STEAMFITTER, REFRIGERATION FITTER | $85.50 | $48.98 | $134.48 Bottom 10% +309% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER | $68.76 | $46.63 | $115.39 Top 10% +251% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER/STEAMFITTER | $87.75 | $41.44 | $129.19 Top 10% +293% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: PIPE TRADESMAN PIPE TRADESMAN SCOPE OF WORK: INSTALLATION OF CORRUGATED METAL PIPING FOR DRAINAGE, AS WELL AS INSTALLATION OF CORRUGATED META | $13.00 | $10.74 | $23.74 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $45.76 | $16.86 | $62.62 Above median +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $55.30 | $22.97 | $78.27 Top 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $54.94 | $23.34 | $78.28 Top 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $49.65 | $22.19 | $71.84 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: BITUMASTIC, ENAMELER, COAL TAR, PITCH AND MASTIC WORKER | $57.17 | $21.51 | $78.68 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: JOURNEYMAN | $53.17 | $21.51 | $74.68 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER: KETTLE PERSON | $55.17 | $21.51 | $76.68 Top 10% +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DE | $37.05 | $27.30 | $64.35 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SHAFTS THEREOF, AND WORK ON AND IN DEEP FOOTINGS. IN THE EVENT THE DEPTH OF THE FOOTING IS UNKNOWN AT THE COMMENCEMENT OF EXCAVATION, AND THE FINAL DE | $36.05 | $27.30 | $63.35 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $64.23 | $39.65 | $103.88 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $44.34 | $39.22 | $83.56 Above median +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $44.07 | $40.79 | $84.86 Above median +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: EXCLUDING METAL DECK AND SIDING | $41.28 | $45.41 | $86.69 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: METAL DECKING AND SIDING ONLY ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ CO | $56.23 | $37.52 | $93.75 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: METAL DECKING AND SIDING ONLY CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES | $56.23 | $37.52 | $93.75 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $38.53 | $23.19 | $61.72 +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $48.54 | $26.59 | $75.13 Above median +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES | $59.00 | $33.03 | $92.03 Top 10% +215% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS, INSTALLER | $47.93 | $24.09 | $72.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS, TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O | $55.12 | $24.30 | $79.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT | $58.83 | $31.51 | $90.34 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT | $53.08 | $30.84 | $83.92 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL OT | $58.33 | $31.00 | $89.33 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER..$ 58.33 31.00 SOUND & COMMUNICATIONS, TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO | $67.08 | $31.26 | $98.34 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O | $67.65 | $31.78 | $99.43 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O | $61.04 | $31.08 | $92.12 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: TECHNICIAN SCOPE OF WORK: INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO TRANSMIT OR RECEIVE INFORMATION; EXCLUDING ALL O | $67.08 | $31.26 | $98.34 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES | $49.69 | $29.72 | $79.41 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRA COBRA, LETOURNEAU PULLS, TOURNOROCKER, EUCLID AND SIMILAR TYPE EQUIPMENT WHEN PULLING FUEL AND/OR GREASE TANK TRAILERS OR OTHER MISCELLANEOUS TR | $44.21 | $34.28 | $78.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER | $44.93 | $20.98 | $65.91 Top 10% +240% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO WORKER/SETTER | $60.58 | $29.79 | $90.37 Top 10% +366% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER | $62.61 | $39.55 | $102.16 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| THE CENTRAL PORTION AREA 2: REMAINDER PLUMAS COUNTY: AREA 1: WESTERN PORTION AREA 2: REMAINDER SHASTA COUNTY: AREA 1: ALL BUT THE NORTHEASTERN CORNER | $60.61 | $39.55 | $100.16 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER AREA 1 | $37.75 | $19.28 | $57.03 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER AREA 2 | $34.76 | $19.22 | $53.98 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER AREA 3 | $32.68 | $18.32 | $51.00 Top 10% +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER AREA 1 | $59.92 | $22.62 | $82.54 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER AREA 2 | $55.17 | $22.52 | $77.69 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER AREA 3 | $50.28 | $22.05 | $72.33 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRACK AND ROAD BEDS. ALL EMPLOYEES PERFORMING WORK COVERED HEREIN SHALL RECEIVE $ .25 PER HOUR ABOVE THEIR REGULAR RATE FOR ALL WORK PERFORMED ON UNDE | $37.20 | $27.30 | $64.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK; BULK CEMENT SPREADER; DUMPCRETE TRUCK; SKID TRUCK; DRY PRE-BATCH CONCRETE MIX TRUCKS; DUMPSTER OR SIMILAR TYPE; SLURRY TRUCK: USE DUMP TRUCK YA | $44.56 | $34.28 | $78.84 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN | $45.89 | $27.72 | $73.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 1: DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN | $45.89 | $27.72 | $73.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 2 RODMEN; SHAFT WORK & RAISE | $45.66 | $27.72 | $73.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 3 BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TUN | $45.41 | $27.72 | $73.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING | $44.96 | $27.72 | $72.68 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN | $44.42 | $27.72 | $72.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS: SHOTCRETE SPECIALIST | $46.41 | $27.72 | $74.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS:, GROUP 1 DIAMOND DRILLER; GROUNDMEN; GUNITE AND SHOTCRETE NOZZLEMEN | $45.89 | $27.72 | $73.61 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS:, GROUP 2 RODMEN; SHAFT WORK & RAISE | $45.66 | $27.72 | $73.38 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS:, GROUP 3 BIT GRINDER; BLASTER, DRILLER, POWDERMEN, HEADING; CHERRY PICKERMEN - WHERE CAR IS LIFTED; CONCRETE FINISHER IN TU | $45.41 | $27.72 | $73.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS:, GROUP 4 VIBRATOR OPERATOR, PAVEMENT BREAKER; BULL GANG - MUCKERS, TRACKMEN; CONCRETE CREW - INCLUDES RODDING AND SPREADING | $44.96 | $27.72 | $72.68 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS:, GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN | $44.42 | $27.72 | $72.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TUNNEL AND SHAFT LABORERS:, GROUP 5 GROUT CREW; REBOUNDMAN; SWAMPER/ BRAKEMAN.$ 44.42 27.72 TUNNEL AND SHAFT LABORERS:, GROUP 4 VIBRATOR OPERATOR, PAV | $44.96 | $27.72 | $72.68 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| UNDERGROUND UTILITY WORKER: /LANDSCAPE FITTER ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOA | $36.01 | $18.50 | $54.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| UNIT); HIGHBED HEAVY DUTY TRANSPORT; SCISSOR TRUCK; RUBBER-TIRED MUCK CAR; RUBBER-TIRED TRUCK JUMBO; WINCH TRUCK AND ""A"" FRAME DRIVERS; COMBINATION | $43.56 | $34.28 | $77.84 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WACKER AND SIMILAR TYPE TAMPERS; BUGGYMOBILE; CAULKER, BANDER, PIPEWRAPPER, CONDUIT LAYER, PLASTIC PIPELAYER; CERTIFIED HAZARDOUS WASTE WORKER INCLUDI | $35.50 | $27.30 | $62.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WATER TRUCKS, 7,000 GALS. AND OVER; JETTING TRUCKS, 7,000 GALS. AND OVER; VACUUM TRUCKS UNDER 7500 GALS. TRUCKS TOWING TILT BED OR FLAT BED PULL TRAIL | $43.86 | $34.28 | $78.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $31.59 | $29.89 | $61.48 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $37.90 | $29.89 | $67.79 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $38.00 | $29.89 | $67.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $38.20 | $29.89 | $68.09 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $38.37 | $29.89 | $68.26 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $37.08 | $27.30 | $64.38 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $36.55 | $27.30 | $63.85 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $36.05 | $27.30 | $63.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| WORKER WHO HANDLES OR COMES IN CONTACT WITH RAW SEWAGE IN SMALL DIAMETER SEWERS. THOSE WHO WORK INSIDE RECENTLY ACTIVE, LARGE DIAMETER SEWERS, AND ALL | $35.50 | $27.30 | $62.80 | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Santa Cruz, CA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Santa Cruz
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Santa Cruz, California.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.