Heavy Construction — Riverside, California

WD CA20260025-16327-hvy · Revision 3 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE in Riverside, California (construction type: heavy) is $55.88/hr base + $23.77/hr fringe = $79.65/hr total package (WD CA20260025-16327-hvy, Rev. 3).

Scroll down for all 123 trade classifications covered by this determination.

WD Number: CA20260025-16327-hvy
Revision: 3
Construction Type: heavy
State: California (CA)
County: Riverside
Effective: May 17, 2026
Trades covered: 123
Official source: SAM.gov reference CA20260025View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ABOVE THE 75'-0"" LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE $55.88 $23.77 $79.65 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL LABORER SCOPE OF WORK: INCLUDES SITE MOBILIZATION, INITIAL SITE CLEANUP, SITE PREPARATION, REMOVAL OF ASBESTOS-CONTAINING MATERIAL AN $46.48 $25.93 $72.41 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER $23.52 $13.37 $36.89 Above median $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR $56.32 $26.52 $82.84 Above median +286% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $51.98 $42.11 $94.09 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
BRICK TENDER $42.60 $22.13 $64.73 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER; MARBLE SETTER *THE WAGE SCALE FOR PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS, N $45.53 $20.29 $65.82 Above median +106% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: CARPENTER, CABINET INSTALLER, INSULATION INSTALLER, HARDWOOD FLOOR WORKER AND ACOUSTICAL INSTALLER FOOTNOTE: WORK OF FORMING IN THE CONSTRU $52.24 $26.18 $78.42 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: MILLWRIGHT FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS U $52.24 $26.68 $78.92 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: PILEDRIVERMEN/DERRICK BARGEMAN, BRIDGE OR DOCK CARPENTER, HEAVY FRAMER, ROCK BARGEMAN OR SCOWMAN, ROCKSLINGER, SHINGLER FOOTNOTE: WORK OF F $52.37 $26.18 $78.55 Top 10% +54% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: PNEUMATIC NAILER, POWER STAPLER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HO $52.37 $26.18 $78.55 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: SAWFILER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING IS USE $52.34 $26.18 $78.52 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: SCAFFOLD BUILDER FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGIN $45.37 $25.43 $70.80 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: TABLE POWER SAW OPERATOR FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTA $52.34 $26.18 $78.52 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $47.70 $27.07 $74.77 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE $51.39 $23.77 $75.16 Bottom 10% $0.00 $0.00 $0.00 $0.00
CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE $54.93 $23.77 $78.70 Top 10% $0.00 $0.00 $0.00 $0.00
CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR. OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED; RUBBER-TIRE $67.91 $33.20 $101.11 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER (ASSISTANT TENDER) $52.37 $3.27 $55.64 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
DIVER (STANDBY) $56.37 $3.27 $59.64 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
DIVER (TENDER) $55.37 $3.27 $58.64 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
DIVER (WET) $112.74 $3.27 $116.01 Top 10% +295% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL $21.45 $11.27 $32.72 Above median +3% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL $52.24 $26.18 $78.42 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $49.33 $26.82 $76.15 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: INSIDE ELECTRICIAN ZONE PAY: ZONE A: FREE TRAVEL ZONE FOR ALL CONTRACTORS PERFORMING WORK IN ZONE A. ZONE B:ANY WORK PERFORMED IN ZONE SH $57.26 $32.83 $90.09 +145% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEA $69.43 $38.44 $107.87 Bottom 10% +63% vs market $0.00 $0.00 $0.00 $0.00
EQUIPMENT OPERATOR, TOWER CRANE REPAIRMAN; TRACTOR LOADER OPERATOR; WOODS MIXER OPERATOR PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIP $66.41 $33.20 $99.61 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
FIRE STOP TECHNICIAN $39.94 $20.65 $60.59 Bottom 10% $0.00 $0.00 $0.00 $0.00
GLAZIER FOOTNOTE: ADDITIONAL $1.25 PER HOUR FOR WORK IN A CONDOR, FROM THE THIRD FLOOR AND UP ADDITIONAL $1.25 PER HOUR FOR WORK ON THE OUTSIDE OF THE $53.05 $30.64 $83.69 Top 10% +164% vs market $0.00 $0.00 $0.00 $0.00
HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEEL $67.18 $33.20 $100.38 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER.$ 50.70 35.15 IRONWORKER $45.78 $26.51 $72.29 Top 10% +109% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 CLEANING AND HANDLING OF PANEL FORMS; CONCRETE SCREEDING FOR ROUGH STRIKE-OFF; CONCRETE, WATER CURING; DEMOLITION LABORER, THE CLEANIN $46.48 $25.95 $72.43 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 ASPHALT SHOVELER; CEMENT DUMPER; CESSPOOL DIGGER AND INSTALLER; CHUCKTENDER; CHUTE HANDLER, POURING CONCRETE, THE HANDLING OF THE CHUT $47.03 $25.95 $72.98 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 BUGGYMOBILE PERSON; CONCRETE CUTTING TORCH; CONCRETE PILE CUTTER; DRILLER, JACKHAMMER, 2-1/2 FT. DRILL STEEL OR LONGER; DRI-PAK-IT MAC $47.58 $25.95 $73.53 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 5 BLASTER POWDER, ALL WORK OF LOADING HOLES, PLACING AND BLASTING OF ALL POWDER AND EXPLOSIVES OF WHATEVER TYPE, REGARDLESS OF METHOD US $49.48 $25.95 $75.43 Top 10% +159% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 1 Batch plant laborer; Changehouse person; Dump person; Dump person; Swamper; Tunnel materials handling person; Nipper; Pot ten $53.60 $25.74 $79.34 +173% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 2 Chucktender, cabletender; Loading and unloading agitator cars; Vibrator person, jack hammer, pneumatic tools; Bull gang mucke $53.92 $25.74 $79.66 +174% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 3 Blaster, driller, powder person; Chemical grout jet person; Cherry picker person; Grout gun person; Grout mixer person; Grout $54.38 $25.74 $80.12 +175% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TUNNEL: GROUP 4 Diamond driller; Sandblaster; Shaft and raise work $55.07 $25.74 $80.81 +178% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PLASTER CLEAN-UP LABORER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $46.17 $25.97 $72.14 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PLASTER TENDER WORK ON A SWING STAGE SCAFFOLD: $1.00 PER HOUR ADDITIONAL $48.72 $25.97 $74.69 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: DRILLING CREW LABORER $47.94 $20.86 $68.80 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: ELECTRONIC TRACKING LOCATOR $51.96 $20.86 $72.82 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: HORIZONTAL DIRECTIONAL DRILL OPERATOR $49.96 $20.86 $70.82 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: VEHICLE OPERATOR/HAULER $48.11 $20.86 $68.97 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 1 PROTECTIVE COATING, PAVEMENT SEALING, INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN $49.30 $23.97 $73.27 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 2 TRAFFIC SURFACE ABRASIVE BLASTER; POT TENDER - REMOVAL OF ALL TRAFFIC LINES AND MARKINGS BY ANY METHOD AND PR $50.60 $23.97 $74.57 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 3 TRAFFIC DELINEATING DEVICE APPLICATOR: LAYOUT AND APPLICATION OF PAVEMENT MARKERS, DELINEATING SIGNS, RUMBLE $52.61 $23.97 $76.58 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
LABORERS:, STRIPING/SLURRY SEAL: GROUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND $54.35 $23.97 $78.32 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: EQUIPMENT SPECIALIST (OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR VEHICLES, BACKHOES, TRENCHERS, CRANES, OVERHEAD & UNDERGROUND DIS $53.30 $22.26 $75.56 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DA $40.76 $21.76 $62.52 Top 10% +6% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVI $70.16 $24.71 $94.87 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
MARBLE FINISHER $43.38 $15.36 $58.74 Bottom 10% $0.00 $0.00 $0.00 $0.00
MODULAR FURNITURE INSTALLER $25.00 $13.06 $38.06 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: BARGE MATE $61.34 $40.95 $102.29 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: DECKMATE..$ 61.82 40.95 OPERATOR, POWER EQUIPMENT: DREDGE DOZER $61.93 $40.95 $102.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND $60.73 $40.95 $101.68 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR, POWER EQUIPMENT: WINCH OPERATOR $61.27 $40.95 $102.22 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR AUGER TY $66.58 $33.20 $99.78 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM PREMIUM PA $66.68 $33.20 $99.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR; REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR; WH $66.71 $33.20 $99.91 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T $66.79 $33.20 $99.99 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; RUBBER-T $66.91 $33.20 $100.11 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM; TANDEM T $67.08 $33.20 $100.28 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 19- ROTEX CONCRETE BELT OPERATOR; RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM $67.29 $33.20 $100.49 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2- ASPHALT-RUBBER PLANT OPERATOR;COIL TUBING RIG OPERATOR, CONCRETE MIXER OPERATOR-SKIP TYPE; CONVEYO $64.18 $33.20 $97.38 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 2-0 RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM; RUBBER-TIRED EARTH-MOVING EQUI $67.41 $33.20 $100.61 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN TANDEM PREMIUM PAY: $10.00 PER HOUR SH $67.58 $33.20 $100.78 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTE $67.68 $33.20 $100.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR, OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL SYSTE $67.79 $33.20 $100.99 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR TYPE; EQUIPMENT GREASER; FORD FERGUSON; HELICOPTE $64.67 $33.20 $97.87 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR; BORING MACHINE OPERATOR; BOXMAN OR MIXERMAN; CHIP SPREADI $65.96 $33.20 $99.16 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP 6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER; CONCRET $66.18 $33.20 $99.38 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 1- Engineer oiler; Fork lift operator PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON A $64.75 $33.20 $97.95 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 10- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o $67.75 $33.20 $100.95 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 11- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o $68.75 $33.20 $101.95 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 12- Crane operator; Derrick barge operator; Hoist operator, stiff legs, Guy derrick o $69.75 $33.20 $102.95 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 13 Crane operator; Derrick barge operator; Helicopter pilot; Hoist operator, stiff le $70.75 $33.20 $103.95 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 2- Truck crane oiler PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMEN $65.53 $33.20 $98.73 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator PREMIUM PAY: $10.00 PER HOU $65.82 $33.20 $99.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator PREMIUM PAY $65.96 $33.20 $99.16 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 5 HYDRAULIC BOOM TRUCK; STINGER CRANE; TUGGER HOIST OPERATOR PREMIUM PAY: $10.00 PER $66.18 $33.20 $99.38 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 6 Bridge crane operator; Cretor crane operator; Hoist operator; Lift mobile operator $66.29 $33.20 $99.49 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 7 PEDESTAL CRANE OPERATOR; SHOVEL, BACKHOE, DRAGLINE, CLAMSHELL OPERATOR; TOWER CRANE $66.41 $33.20 $99.61 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 8 Crane operator; Crawler transporter operator; Derrick barge operator; Hoist operato $66.58 $33.20 $99.78 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING & HOISTING: GROUP 9 Crane operator; Derrick barge operator; Highline cableway operator; Hoist operator $66.75 $33.20 $99.95 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1- Skiploader PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the fol $65.25 $33.20 $98.45 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2- Power-driven jumbo form setter operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equip $66.03 $33.20 $99.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3- Dinkey locomotive or motorperson PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Op $66.32 $33.20 $99.52 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4- Bit sharpener; Equipment greaser; Slip form pump operator; Tugger hoist operator; Tunnel locomotive o $66.46 $33.20 $99.66 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5- Backhoe operator; Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shiel $66.68 $33.20 $99.88 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6- Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work $66.79 $33.20 $99.99 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7- Tunnel mole boring machine operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment $66.91 $33.20 $100.11 Top 10% $0.00 $0.00 $0.00 $0.00
OR COMPRESSOR PLANT OPERATOR; PUMP OPERATOR; SIGNALMAN; SWITCHMAN PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON T $63.40 $33.20 $96.60 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTERS: INCLUDING LEAD ABATEMENT: ALL OTHER WORK $38.52 $18.64 $57.16 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $47.37 $19.64 $67.01 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $48.84 $23.58 $72.42 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $44.75 $26.20 $70.95 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $44.29 $24.16 $68.45 +108% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $61.73 $26.81 $88.54 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $59.85 $25.83 $85.68 Top 10% +161% vs market $0.00 $0.00 $0.00 $0.00
PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTRO NAVAL FACILITY, FORT IRWIN, MARINE COR $42.12 $35.69 $77.81 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER FOOTNOTE: PITCH PREMIUM: WORK ON WHICH EMPLOYEES ARE EXPOSED TO PITCH FUMES OR REQUIRED TO HANDLE PITCH, PITCH BASE OR PITCH IMPREGNATED PRODUC $52.63 $20.73 $73.36 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: COMMERCIAL - NEW CONSTRUCTION AND REMODEL WORK (LOS ANGELESAND CATALINA ISLAND, INYO, KERN, MONO ORANGE, RIVERSIDE, AND SAN BERNAR $59.31 $30.43 $89.74 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $50.79 $29.80 $80.59 Above median +145% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO FINISHER $42.11 $14.67 $56.78 Above median +193% vs market $0.00 $0.00 $0.00 $0.00
TERRAZZO WORKER/SETTER $49.62 $15.26 $64.88 Above median +235% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $37.96 $13.77 $51.73 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
TILE LAYER $51.82 $19.32 $71.14 Above median $0.00 $0.00 $0.00 $0.00
TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL LABORER GROUP 4 ASPHALT RAKER, LUTE PERSON, IRONER, ASPHALT DUMP PERSON, AND ASPHALT SPREADER BOXES $49.13 $25.95 $75.08 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 TRUCK DRIVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE $41.59 $35.69 $77.28 Top 10% +168% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 10 DUMP TRUCK - 50 YDS. OR MORE WATER LEVEL; WATER PULL - SINGLE ENGINE WITH ATTACHMENT WORK ON ALL MILITARY BASES: PREMIUM PAY: $3 $43.12 $35.69 $78.81 Top 10% +173% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 11 WATER PULL - TWIN ENGINE; WATER PULL - TWIN ENGINE WITH ATTACHMENTS; WINCH TRUCK DRIVER - $1.25 ADDITIONAL WHEN OPERATING WINCH $43.62 $35.69 $79.31 Top 10% +175% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 12 BOOM TRUCK 17K AND ABOVE WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS $44.05 $35.69 $79.74 Top 10% +177% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 2 AXLES; TRAFFIC CONTROL PILOT CAR EXCLUDING MOVING HEAVY EQUIPMENT PERMIT LOAD; T $41.74 $35.69 $77.43 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 DRIVER OF VEHICLE OR COMBINATION OF VEHICLES - 3 AXLES; BOOT PERSON; CEMENT MASON DISTRIBUTION TRUCK; FUEL TRUCK DRIVER; WATER TR $41.87 $35.69 $77.56 Top 10% +169% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 5 WATER TRUCK, 3 OR MORE AXLES; TRUCK GREASER AND TIRE PERSON; PIPELINE AND UTILITY WORKING TRUCK DRIVER, INCLUDING WINCH TRUCK AND $42.09 $35.69 $77.78 Top 10% +170% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 7 $42.37 $35.69 $78.06 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 8 DUMP TRUCK, 25 YDS. TO 49 YDS. WATER LEVEL; TRUCK REPAIR PERSON; WATER PULL - SINGLE ENGINE; WELDER WORK ON ALL MILITARY BASES: P $42.62 $35.69 $78.31 Top 10% +172% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 9 TRUCK REPAIR PERSON/WELDER; LOW BED DRIVER, 9 AXLES OR OVER WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [ $42.82 $35.69 $78.51 Top 10% +172% vs market $0.00 $0.00 $0.00 $0.00
TYPES; CABLE BUNDLING MACHINE OPERATOR; CABLE TRENCHING MACHINE OPERATOR CAST-IN-PLACE PIPE LAYING MACHINE OPERATOR; COMBINATION MIXER AND COMPRESSOR $66.29 $33.20 $99.49 Top 10% $0.00 $0.00 $0.00 $0.00
WATER LEVEL WORK ON ALL MILITARY BASES: PREMIUM PAY: $3.00 PER HOUR ADDITIONAL. [29 PALMS MARINE BASE, CAMP ROBERTS, CHINA LAKE, EDWARDS AFB, EL CENTR $42.06 $35.69 $77.75 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Riverside, CA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Riverside

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for CA20260025-16327-hvy →