Building Construction — Lake, California
WD CA20260005-16337-bld · Revision 2 · Effective May 19, 2026
The Davis-Bacon prevailing wage for BOILERMAKER in Lake, California (construction type: building) is $21.60/hr base + $4.25/hr fringe = $25.85/hr total package (WD CA20260005-16337-bld, Rev. 2).
Scroll down for all 125 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BOILERMAKER | $21.60 | $4.25 | $25.85 Bottom 10% -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICK TENDER | $18.54 | $3.86 | $22.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, STONEMASON | $22.45 | $8.60 | $31.05 Bottom 10% -3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $19.08 | $6.92 | $26.00 -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $19.23 | $6.96 | $26.19 Bottom 10% -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: MILLWRIGHT | $19.73 | $8.20 | $27.93 Bottom 10% -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: PILEDRIVERMAN | $19.38 | $9.88 | $29.26 -19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: PILEDRIVERMAN - BRIDGE BUILDING | $21.21 | $6.92 | $28.13 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASONS | $18.16 | $6.18 | $24.34 Bottom 10% -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASONS: CEMENT MASON | $17.91 | $6.18 | $24.09 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER | $20.38 | $6.16 | $26.54 Bottom 10% -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER | $31.63 | $9.88 | $41.51 Bottom 10% +41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS: DRYWALL INSTALLER/LATHER | $19.08 | $7.40 | $26.48 -16% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL INSTALLERS/LATHERS: DRYWALL STOCKER, SCRAPPER & CLEAN-UP | $9.54 | $7.40 | $16.94 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $17.41 | $6.05 | $23.46 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: (COMMUNICATIONS & SYSTEM ELECTRONIC INSTALLER: COMMUNICATIONS & SYSTEMS TECHNICIAN (INCLUDING ANY DATA SYSTEM WHOSE ONLY FUNCTION IS TO | $13.62 | $1.31 | $14.93 -59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: CABLE SPLICER | $18.80 | $6.09 | $24.89 -32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC | $31.06 | $3.87 | $34.93 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET DEL NORTE & HUMBOLDT | $14.19 | $4.41 | $18.60 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FLOOR LAYER: CARPET LAKE & MENDOCINO | $18.73 | $0.00 | $18.73 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $16.31 | $6.19 | $22.50 -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR/ASBESTOS WORKER | $21.60 | $5.61 | $27.21 +27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKERS: ORNAMENTAL, REINFORCING, & STRUCTURAL..$ 19.15 8.93 IRONWORKERS: FENCE ERECTOR | $18.26 | $8.93 | $27.19 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 1 Skilled wrecker WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES | $16.61 | $5.96 | $22.57 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 2 Semi-skilled wrecker WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES | $16.46 | $5.96 | $22.42 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 3 General laborer WRECKING, BUILDINGS AND MISCELLANEOUS STRUCTURES | $16.36 | $5.96 | $22.32 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GUNITE GROUP 1 Nozzle operator; Ground | $17.07 | $5.96 | $23.03 -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GUNITE GROUP 2 Rebound | $16.48 | $5.96 | $22.44 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GUNITE GROUP 3 General laborer | $17.36 | $5.96 | $23.32 -20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1-A Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Diamond driller; Wago | $16.83 | $5.96 | $22.79 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1-C Burning and welding in connection with laborers' work. Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recent | $16.66 | $5.96 | $22.62 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1-D Repair track and road beds. Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter se | $16.86 | $5.96 | $22.82 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1-E Laborer on general construction work on or in Bell Hole footings and shaft. Sewer cleaner receives an additional $4.00 per day, $5 | $17.16 | $5.96 | $23.12 -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1-F Wire winding machine in connection with guniting or shotcrete - aligner. Sewer cleaner receives an additional $4.00 per day, $5.00 | $17.19 | $5.96 | $23.15 -20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and digger; Concrete bucket dumper and chute; Concre | $16.46 | $5.96 | $22.42 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 All clean-up work of debris, grounds and buildings including but not limited to street cleaners; Cleaning and washing windows; Const | $16.36 | $5.96 | $22.32 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 4 Brick cleaner; Lumber cleaner; Sewer cleaner receives an additional $4.00 per day, $5.00 per day on recently active large diameter s | $10.05 | $5.96 | $16.01 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER: ESTABLISHMENT WARRANTY PERIOD..$ 10.05 5.96 LABORERS:, GROUP 1 Asphalt ironer and raker; Asphalt spreader boxes; Barko, Wacker and | $16.61 | $5.96 | $22.57 | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, CABLE SPLICER..$ 18.80 6.08 LANDSCAPE LABORER: NEW CONSTRUCTION | $16.36 | $5.96 | $22.32 -62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, GROUND PERSON | $18.28 | $5.29 | $23.57 -60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, GROUND PERSON..$ 13.93 5.89 LINE CONSTRUCTION, CABLE SPLICER | $25.14 | $5.49 | $30.63 -48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, GROUP 1- Cable splicer, lead pole sprayer. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 MILES RADIUS FROM THE GEOGRAPHICAL CENTER OF ALTURO | $20.63 | $3.97 | $24.60 -58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, GROUP 2-Line technician, pole sprayer, heavy line equipment operator, certified line welder. (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 M | $18.65 | $3.90 | $22.55 -62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR | $18.22 | $5.29 | $23.51 -60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, HEAVY EQUIPMENT OPERATOR | $15.67 | $5.96 | $21.63 -63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, LINE TECHNICIAN | $22.85 | $5.43 | $28.28 -52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LINE CONSTRUCTION, LINE TECHNICIAN | $17.41 | $6.03 | $23.44 -60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE AND TERRAZZO SETTER | $21.09 | $4.13 | $25.22 | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE FINISHER | $15.22 | $3.92 | $19.14 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE FINISHER | $13.92 | $3.67 | $17.59 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID WHEN WORKING OUT OF EMPLOYER'S PERMANENT SHOP. $ 13.23 3.71 LINE CONSTRUCTION, GROUP 6- Head ground person (DEL NORTE COUNTY ZONES- ZONE 1: 0-3 M | $14.07 | $3.74 | $17.81 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAID WHEN WORKING OUT OF EMPLOYER'S PERMANENT SHOP. $ 14.07 3.74 LINE CONSTRUCTION, GROUP 4- Line equipment operator. (DEL NORTE COUNTY ZONES- ZONE 1 | $16.08 | $3.81 | $19.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH | $20.78 | $4.68 | $25.46 Bottom 10% -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: BRUSH; ROLLER | $12.51 | $2.43 | $14.94 -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: DRYWALL FINISHER; PAPERHANGER | $21.78 | $4.68 | $26.46 -4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: PAPERHANGER; SANDBLASTER; SPRAY; STRUCTURAL STEEL; SWING STAGE; TAPER | $12.76 | $2.43 | $15.19 -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SANDBLASTING; SPRAY; STEAM-CLEANING | $21.28 | $4.68 | $25.96 -6% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 1 STRIPER: Layout and application of painted traffic stripes and markings; hot thermo plastic; tape traffi | $16.83 | $3.52 | $20.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 2 TRAFFIC DELINEATING DEVICE APPLICATOR: Layout and application of pavement markers, delineating signs, ru | $15.99 | $3.52 | $19.51 | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 3 SURFACE ABRASIVE BLASTER: removal of traffic lines and markings, preparation of surface for coatings | $14.31 | $3.52 | $17.83 | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: GROUP 4 TRAFFIC PROTECTIVE DELINEATING SYSTEMS INSTALLER: removes; relocates; installs permanently affixed roads | $16.83 | $3.52 | $20.35 | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: SLURRY SEAL WORK: OPERATOR & SHUTTLE | $12.88 | $3.52 | $16.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| PARKING LOT STRIPING/HIGHWAY MARKING: SLURRY SEAL WORK: SEALER/MIXER | $14.54 | $3.52 | $18.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $17.73 | $8.22 | $25.95 Bottom 10% -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER | $29.84 | $12.53 | $42.37 Bottom 10% +29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER | $16.47 | $9.45 | $25.92 Bottom 10% -21% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $12.00 | $2.00 | $14.00 -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $16.30 | $3.84 | $20.14 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFERS: BITUMASTIC; COAL TAR BUILT-UP; ENAMELER; PIPEWRAPPER | $19.65 | $7.17 | $26.82 -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFERS: ENAMELER & PITCH | $18.30 | $3.84 | $22.14 -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFERS: MASTIC WORKER; KETTLE TENDER | $17.90 | $7.17 | $25.07 -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $27.17 | $7.17 | $34.34 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER.$ 18.65 4.85 ROOFERS: ROOFER | $17.65 | $7.17 | $24.82 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $24.18 | $3.75 | $27.93 -15% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| Southeastern part MENDOCINO COUNTY: AREA 2: Remainder of County AREA 2: $2.00 PREMIUM OF AREA 1 | $17.31 | $9.70 | $27.01 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| Southeastern part MENDOCINO COUNTY: AREA 2: Remainder of County AREA 2: $2.00 PREMIUM OF AREA 1 | $18.15 | $9.70 | $27.85 | $0.00 | $0.00 | $0.00 | $0.00 |
| Southeastern part MENDOCINO COUNTY: AREA 2: Remainder of County AREA 2: $2.00 PREMIUM OF AREA 1 | $18.99 | $9.70 | $28.69 | $0.00 | $0.00 | $0.00 | $0.00 |
| Southeastern part MENDOCINO COUNTY: AREA 2: Remainder of County AREA 2: $2.00 PREMIUM OF AREA 1 | $19.97 | $9.70 | $29.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| Southeastern part MENDOCINO COUNTY: AREA 2: Remainder of County AREA 2: $2.00 PREMIUM OF AREA 1 | $20.93 | $9.70 | $30.63 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| Southeastern part MENDOCINO COUNTY: AREA 2: Remainder of County AREA 2: $2.00 PREMIUM OF AREA 1 | $21.96 | $9.70 | $31.66 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| Southeastern part MENDOCINO COUNTY: AREA 2: Remainder of County AREA 2: $2.00 PREMIUM OF AREA 1 | $23.04 | $9.70 | $32.74 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| Southeastern part MENDOCINO COUNTY: AREA 2: Remainder of County AREA 2: $2.00 PREMIUM OF AREA 1 | $24.17 | $9.70 | $33.87 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER: BASE MACHINE OPERATOR | $17.69 | $4.18 | $21.87 +13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER: BASE MACHINE OPERATOR | $17.42 | $3.95 | $21.37 +10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER: TERRAZZO FINISHER | $16.99 | $4.18 | $21.17 +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TERRAZZO FINISHER: TERRAZZO FINISHER | $16.72 | $3.95 | $20.67 +7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $16.17 | $4.98 | $21.15 -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $23.35 | $4.48 | $27.83 +1% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 Bulk cement spreader; Bus driver; Concrete pump machine; Concrete pump truck; Dump; Dumpcrete truck; Dumpster; Escort or pilot | $17.80 | $7.69 | $25.49 -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 10 Scissor truck; Single unit flat rack; Industrial lift truck; Small rubber-tired tractor | $18.00 | $7.69 | $25.69 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 11 Jetting truck and water truck, 2,500 gallons and under 4,000 gallons | $18.01 | $7.69 | $25.70 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 12 Combination winch truck with hoist; Transit mix or agitator | $18.05 | $7.69 | $25.74 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 13 Vacuum truck, 3,500 gallons and under 5,500 gallons | $18.06 | $7.69 | $25.75 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 14 Rubber-tired muck car | $18.07 | $7.69 | $25.76 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 16 A-frame, winch truck; Buggymobile; Jetting and water truck; Rubber-tired truck jumbo..$ 18.11 7.69 TRUCK DRIVERS: GROUP 15 Bul | $18.10 | $7.69 | $25.79 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 17 Heavy-duty transport | $18.12 | $7.69 | $25.81 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 18 Ross Hyster and similar straddle carrier | $18.14 | $7.69 | $25.83 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 19 Transit mix or agitator | $18.15 | $7.69 | $25.84 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 Teamster oiler and/or greaser and/or service | $17.88 | $7.69 | $25.57 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 20 Vacuum truck | $18.16 | $7.69 | $25.85 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 21 Jetting truck and water truck | $18.21 | $7.69 | $25.90 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 22 Combination boot person and road oiler | $18.24 | $7.69 | $25.93 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 23 Transit mix or agitator | $18.25 | $7.69 | $25.94 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 24 Bulk cement spreader; Dump; Dumpcrete; Dumpster; Self-propelled street sweeper with self-contained refuse bin; Skid; Snow Go a | $18.34 | $7.69 | $26.03 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 25 Heavy-duty transport; Transit mix or agitator | $18.35 | $7.69 | $26.04 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 26 Ammonia nitrate distributor driver and mixer; Bulk cement spreader; Dump; Dumpcrete; Dumpster; Skid; Truck | $18.38 | $7.69 | $26.07 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 27 Double gooseneck; Heavy-duty transport tiller | $18.40 | $7.69 | $26.09 -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 28 P.B. or similar type self-loading truck | $18.44 | $7.69 | $26.13 -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 29 Transit mix agitator | $18.45 | $7.69 | $26.14 -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 3 Bulk cement spreader; Dump; Dumpcrete; Dumpster; Skid; Single unit flat rack; Industrial lift truck; Truck | $17.90 | $7.69 | $25.59 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 30 Truck repair; Hydro-lift or Swedish crane type; Hydro-lift extension or retracting crane | $18.47 | $7.69 | $26.16 -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 31 Bulk cement spreader; Combination dump and dump trailer; Dump; Dumpcrete; Dumpster; Skid; Transit mix agitator; Truck | $18.48 | $7.69 | $26.17 -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 32 Bulk cement spreader; Dump; Dumpcrete; Dumpster; DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, T | $18.54 | $7.69 | $26.23 -9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 33 Bulk cement spreader; Dump; Dumpcrete; Dumpster; Skid; Truck | $18.69 | $7.69 | $26.38 -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 34 DW 10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTournapulls, Tournarocker, Euclid and similar type equipment wh | $18.79 | $7.69 | $26.48 -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 35 Bulk cement spreader; Dump; Dumpcrete; Dumpster; Helicopter pilot; Skid; Truck | $18.84 | $7.69 | $26.53 -8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 36 Over 65 to 80 yds | $18.99 | $7.69 | $26.68 -7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 37 Over 80 to 95 yds | $19.14 | $7.69 | $26.83 -7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 4 Jetting truck and water truck | $17.91 | $7.69 | $25.60 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 5 Road oil truck or boot | $17.92 | $7.69 | $25.61 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 6 Lift jitney, fork lift | $17.93 | $7.69 | $25.62 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 7 Transit mix, agitator | $17.95 | $7.69 | $25.64 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 8 Fuel and/or grease truck driver or fuel worker | $17.97 | $7.69 | $25.66 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 9 Vacuum truck, under 3,500 gallons | $17.98 | $7.69 | $25.67 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ZONE DIFFERENTIAL) | $15.35 | $3.79 | $19.14 | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Lake, CA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Lake
Compliance Notes
- This wage determination applies to federal contracts for building construction in Lake, California.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.