Building Construction — Yell, Arkansas

WD AR20260017-16240-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Yell, Arkansas (construction type: building) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD AR20260017-16240-bld, Rev. 1).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: AR20260017-16240-bld
Revision: 1
Construction Type: building
State: Arkansas (AR)
County: Yell
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference AR20260017View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.00 $0.00 $20.00 -13% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION $16.45 $2.80 $19.25 Bottom 10% -14% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.62 $0.00 $15.62 -29% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.94 $14.95 $43.89 +85% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC: HVAC DUCT INSTALLATION $17.27 $5.03 $22.30 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $28.00 $21.21 $49.21 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.18 $0.00 $12.18 -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $10.00 $0.00 $10.00 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $34.02 $11.88 $45.90 Bottom 10% +60% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $23.08 $0.00 $23.08 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.14 $0.00 $18.14 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $16.25 $10.42 $26.67 +44% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $17.78 $0.00 $17.78 -4% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $17.73 $2.84 $20.57 -14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $34.25 $15.00 $49.25 +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $33.25 $15.00 $48.25 +122% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.00 $0.00 $15.00 -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Yell, AR — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Yell

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260017-16240-bld →