Residential Construction — Van Buren, Arkansas

WD AR20260108-16237-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Van Buren, Arkansas (construction type: residential) is $13.28/hr base + $0.00/hr fringe = $13.28/hr total package (WD AR20260108-16237-res, Rev. 1).

Scroll down for all 14 trade classifications covered by this determination.

WD Number: AR20260108-16237-res
Revision: 1
Construction Type: residential
State: Arkansas (AR)
County: Van Buren
Effective: May 17, 2026
Trades covered: 14
Official source: SAM.gov reference AR20260108View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $13.28 $0.00 $13.28 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $11.96 $0.00 $11.96 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.60 $0.00 $13.60 -39% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC..$ 12.41 0.00 ELECTRICIAN $13.35 $0.00 $13.35 Top 10% -41% vs market $0.00 $0.00 $0.00 $0.00
INSTALLER - GUTTERS $9.95 $0.00 $9.95 Top 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - SIDING $8.00 $0.00 $8.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.00 $0.15 $8.15 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $8.39 $0.00 $8.39 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $8.23 $0.00 $8.23 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $10.50 $0.00 $10.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $9.33 $0.00 $9.33 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $16.67 $0.00 $16.67 -30% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 10.54 0.00 ROOFER $11.00 $0.00 $11.00 Top 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $8.95 $0.00 $8.95 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Van Buren, AR — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Van Buren

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260108-16237-res →