Residential Construction — Saline, Arkansas

WD AR20260126-16233-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Saline, Arkansas (construction type: residential) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD AR20260126-16233-res, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: AR20260126-16233-res
Revision: 1
Construction Type: residential
State: Arkansas (AR)
County: Saline
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference AR20260126View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $20.00 $0.00 $20.00 -13% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES SOFT FLOOR INSTALLATION $12.71 $0.00 $12.71 -43% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.68 $0.00 $13.68 -38% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $10.00 $0.00 $10.00 -52% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC..$ 11.91 0.00 ELECTRICIAN $14.50 $3.58 $18.08 -20% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - BATT $7.50 $0.00 $7.50 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $8.97 $0.00 $8.97 -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $9.33 $0.00 $9.33 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $9.04 $0.00 $9.04 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.26 $0.00 $11.26 -37% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PAVER $15.75 $0.00 $15.75 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $12.86 $0.00 $12.86 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $14.25 $0.00 $14.25 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $11.13 $0.00 $11.13 -40% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $15.00 $0.00 $15.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $14.65 $0.00 $14.65 -39% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $14.87 $0.00 $14.87 -31% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $32.00 $24.24 $56.24 +135% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.68 $0.00 $11.68 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Saline, AR — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Saline

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260126-16233-res →