Highway Construction — Randolph, Arkansas

WD AR20260157-16232-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Randolph, Arkansas (construction type: highway) is $18.87/hr base + $0.00/hr fringe = $18.87/hr total package (WD AR20260157-16232-hwy, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: AR20260157-16232-hwy
Revision: 1
Construction Type: highway
State: Arkansas (AR)
County: Randolph
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference AR20260157View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $18.87 $0.00 $18.87 -15% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $15.92 $0.00 $15.92 -29% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.36 $0.00 $14.36 -35% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $11.80 $0.00 $11.80 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $13.50 $0.00 $13.50 $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $15.80 $0.00 $15.80 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.80 $0.00 $15.80 -33% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $20.95 $9.26 $30.21 +28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $12.95 $0.00 $12.95 -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.43 $0.00 $12.43 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.51 $0.00 $11.51 -35% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT PLANT $17.67 $0.00 $17.67 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $19.73 $0.00 $19.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.49 $0.00 $19.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $14.94 $0.00 $14.94 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.01 $0.00 $18.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $25.21 $0.00 $25.21 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADE CHECKER $19.30 $0.00 $19.30 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $19.75 $0.00 $19.75 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.77 $0.00 $13.77 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $22.42 $0.00 $22.42 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $20.95 $0.00 $20.95 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $16.06 $0.00 $16.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.31 $0.00 $16.31 $0.00 $0.00 $0.00 $0.00
OPERATOR: POST DRIVER $19.30 $0.00 $19.30 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.48 $0.00 $15.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $17.78 $0.00 $17.78 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $15.91 $0.00 $15.91 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $18.31 $0.00 $18.31 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $18.75 $0.00 $18.75 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $11.76 $0.00 $11.76 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $10.97 $0.00 $10.97 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.64 $0.00 $16.64 Above median -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $12.75 $0.00 $12.75 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $17.74 $0.00 $17.74 Above median -25% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $10.75 $0.00 $10.75 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $16.09 $0.00 $16.09 -32% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Randolph, AR — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.