Building Construction — Pike, Arkansas

WD AR20260020-16256-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Pike, Arkansas (construction type: building) is $19.18/hr base + $1.60/hr fringe = $20.78/hr total package (WD AR20260020-16256-bld, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: AR20260020-16256-bld
Revision: 1
Construction Type: building
State: Arkansas (AR)
County: Pike
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference AR20260020View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $19.18 $1.60 $20.78 -10% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING $16.03 $0.00 $16.03 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.14 $0.00 $19.14 -14% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $16.19 $0.00 $16.19 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.21 $5.74 $26.95 +13% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $28.00 $21.21 $49.21 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.84 $0.00 $12.84 -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.88 $0.00 $12.88 -28% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $34.02 $11.88 $45.90 Bottom 10% +60% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $23.95 $0.00 $23.95 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $18.13 $0.00 $18.13 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $16.25 $10.42 $26.67 +44% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $17.02 $6.42 $23.44 +27% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $24.42 $4.86 $29.28 +23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $34.25 $15.00 $49.25 +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $33.25 $15.00 $48.25 +122% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $20.06 $6.75 $26.81 +31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.00 $0.00 $15.00 -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pike, AR — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pike

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260020-16256-bld →