Building Construction — Lonoke, Arkansas

WD AR20260029-16224-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Lonoke, Arkansas (construction type: building) is $34.21/hr base + $23.92/hr fringe = $58.13/hr total package (WD AR20260029-16224-bld, Rev. 1).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: AR20260029-16224-bld
Revision: 1
Construction Type: building
State: Arkansas (AR)
County: Lonoke
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference AR20260029View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $34.21 $23.92 $58.13 +62% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.33 $3.77 $24.10 +4% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING $15.72 $0.00 $15.72 Bottom 10% -29% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.80 $3.89 $23.69 +7% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $15.38 $0.00 $15.38 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $20.28 $2.90 $23.18 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $17.16 $4.76 $21.92 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $14.00 $0.00 $14.00 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $19.61 $0.00 $19.61 -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.88 $0.00 $12.88 -28% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.37 $0.00 $12.37 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.00 $0.00 $14.00 -21% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $34.02 $11.88 $45.90 Bottom 10% +60% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $28.21 $0.00 $28.21 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.74 $0.00 $16.74 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $17.52 $0.00 $17.52 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.66 $0.00 $14.66 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.75 $0.00 $23.75 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $14.78 $0.00 $14.78 $0.00 $0.00 $0.00 $0.00
PAINTER $16.25 $10.42 $26.67 +44% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $34.41 $15.70 $50.11 +110% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $34.41 $15.70 $50.11 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.39 $0.00 $15.39 -29% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $26.99 $15.67 $42.66 +108% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $23.56 $2.77 $26.33 +10% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.80 $0.71 $14.51 -39% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lonoke, AR — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lonoke

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260029-16224-bld →