Highway Construction — Grant, Arkansas

WD AR20260165-16251-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Grant, Arkansas (construction type: highway) is $14.09/hr base + $0.00/hr fringe = $14.09/hr total package (WD AR20260165-16251-hwy, Rev. 1).

Scroll down for all 39 trade classifications covered by this determination.

WD Number: AR20260165-16251-hwy
Revision: 1
Construction Type: highway
State: Arkansas (AR)
County: Grant
Effective: May 17, 2026
Trades covered: 39
Official source: SAM.gov reference AR20260165View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $14.09 $0.00 $14.09 -37% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.11 $0.00 $15.11 -32% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $12.69 $0.00 $12.69 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: OPERATOR $13.25 $0.00 $13.25 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $21.75 $0.00 $21.75 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $14.22 $0.00 $14.22 -40% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $15.36 $0.00 $15.36 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $14.45 $0.00 $14.45 -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.58 $0.00 $12.58 -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $15.23 $0.00 $15.23 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.33 $0.00 $14.33 -19% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER $15.80 $0.00 $15.80 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.79 $0.00 $15.79 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $16.06 $0.00 $16.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.15 $0.00 $15.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $20.63 $0.00 $20.63 $0.00 $0.00 $0.00 $0.00
OPERATOR: DISTRIBUTOR $14.52 $0.00 $14.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $14.85 $0.00 $14.85 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADE CHECKER $16.24 $0.00 $16.24 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.73 $0.00 $17.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $10.79 $0.00 $10.79 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.05 $0.00 $17.05 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $21.72 $0.00 $21.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $17.52 $0.00 $17.52 $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $18.46 $0.00 $18.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $18.27 $0.00 $18.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POST DRIVER $16.97 $0.00 $16.97 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.73 $0.00 $12.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $19.31 $0.00 $19.31 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $15.01 $0.00 $15.01 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $12.67 $0.00 $12.67 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $12.95 $0.00 $12.95 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.36 $0.00 $13.36 -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $21.03 $0.00 $21.03 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $17.49 $0.00 $17.49 Above median -27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI/TRAILER TRUCK $12.50 $0.00 $12.50 -48% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SERVICER $15.90 $0.00 $15.90 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $14.73 $0.00 $14.73 -38% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Grant, AR — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Grant

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260165-16251-hwy →