Heavy Construction — Garland, Arkansas

WD AR20260053-16217-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Garland, Arkansas (construction type: heavy) is $18.69/hr base + $3.79/hr fringe = $22.48/hr total package (WD AR20260053-16217-hvy, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: AR20260053-16217-hvy
Revision: 1
Construction Type: heavy
State: Arkansas (AR)
County: Garland
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference AR20260053View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $18.69 $3.79 $22.48 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.41 $3.46 $21.87 -1% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $22.88 $7.19 $30.07 +27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.59 $2.01 $15.60 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.53 $2.20 $16.73 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.67 $0.00 $17.67 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $16.32 $1.65 $17.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.21 $6.79 $31.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.43 $0.00 $15.43 $0.00 $0.00 $0.00 $0.00
PAINTER $18.00 $0.00 $18.00 -3% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.36 $0.00 $14.36 -40% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Garland, AR — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Garland

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260053-16217-hvy →