Residential Construction — Fulton, Arkansas

WD AR20260080-16216-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Fulton, Arkansas (construction type: residential) is $13.41/hr base + $0.00/hr fringe = $13.41/hr total package (WD AR20260080-16216-res, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: AR20260080-16216-res
Revision: 1
Construction Type: residential
State: Arkansas (AR)
County: Fulton
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference AR20260080View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $13.41 $0.00 $13.41 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES CABINET INSTALLATION, AND FORM WORK $11.37 $0.00 $11.37 Top 10% -49% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.00 $0.00 $13.00 -41% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $12.00 $0.00 $12.00 -43% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.78 $0.00 $15.78 Bottom 10% -34% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $10.00 $0.00 $10.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $10.00 $0.00 $10.00 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
INSTALLER - SIDING $10.75 $0.00 $10.75 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $7.87 $0.00 $7.87 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $8.38 $0.00 $8.38 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $8.07 $0.00 $8.07 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $10.50 $0.00 $10.50 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $10.75 $0.00 $10.75 Above median -42% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $13.71 $0.00 $13.71 -43% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $11.72 $0.00 $11.72 -46% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $10.54 $0.00 $10.54 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $8.00 $0.00 $8.00 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $9.15 $0.00 $9.15 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Fulton, AR — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Fulton

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AR20260080-16216-res →