Building Construction — Franklin, Arkansas
WD AR20260019-16261-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Franklin, Arkansas (construction type: building) is $20.00/hr base + $0.00/hr fringe = $20.00/hr total package (WD AR20260019-16261-bld, Rev. 1).
Scroll down for all 17 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $20.00 | $0.00 | $20.00 -13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $17.07 | $3.60 | $20.67 Above median -7% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $15.62 | $0.00 | $15.62 -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $28.94 | $14.95 | $43.89 +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HVAC MECHANIC: HVAC DUCT INSTALLATION | $17.27 | $5.03 | $22.30 Above median -2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $28.00 | $21.21 | $49.21 Above median +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.72 | $0.00 | $11.72 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $10.00 | $0.00 | $10.00 Bottom 10% -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $34.02 | $11.88 | $45.90 Bottom 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $23.08 | $0.00 | $23.08 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $18.14 | $0.00 | $18.14 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $16.25 | $10.42 | $26.67 +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $17.78 | $0.00 | $17.78 -4% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $17.73 | $2.84 | $20.57 -14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE | $34.25 | $15.00 | $49.25 +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $33.25 | $15.00 | $48.25 +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $15.00 | $0.00 | $15.00 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Franklin, AR — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Franklin
Compliance Notes
- This wage determination applies to federal contracts for building construction in Franklin, Arkansas.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.