Davis-Bacon Wage Determinations — Carroll, Arkansas

Carroll has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.

Quick Answer

Davis-Bacon prevailing wage determinations for Carroll, Arkansas cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.

building Active
WD: AR20260019-16259-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy Active
WD: AR20260046-16259-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway Active
WD: AR20260130-16259-hwy Rev. 1
Effective: May 17, 2026
View trade rates →
residential Active
WD: AR20260069-16259-res Rev. 1
Effective: May 17, 2026
View trade rates →

Top-Paying Trades in Carroll

Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.

# Trade Construction Type Base $/hr Fringe $/hr Total Package
1 POWER EQUIPMENT OPERATOR Crane building $34.25 $15.00 $49.25 WD →
2 POWER EQUIPMENT OPERATOR: CRANE building $34.25 $15.00 $49.25 WD →
3 IRONWORKER, STRUCTURAL building $28.00 $21.21 $49.21 WD →
4 POWER EQUIPMENT OPERATOR Forklift building $33.25 $15.00 $48.25 WD →
5 POWER EQUIPMENT OPERATOR: FORKLIFT building $33.25 $15.00 $48.25 WD →
6 MILLWRIGHT building $34.02 $11.88 $45.90 WD →
7 ELECTRICIAN building $28.94 $14.95 $43.89 WD →
8 POWER EQUIPMENT OPERATOR Grader/Blade highway $29.43 $12.59 $42.02 WD →
9 POWER EQUIPMENT OPERATOR: GRADER/BLADE highway $29.43 $12.59 $42.02 WD →
10 PAINTER building $16.25 $10.42 $26.67 WD →
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →