Residential Construction — Pima, Arizona
WD AZ20260002-16206-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H in Pima, Arizona (construction type: residential) is $32.29/hr base + $9.97/hr fringe = $42.26/hr total package (WD AZ20260002-16206-res, Rev. 1).
Scroll down for all 32 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H | $32.29 | $9.97 | $42.26 Top 10% +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $17.13 | $0.00 | $17.13 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $20.38 | $0.00 | $20.38 Above median -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER | $17.44 | $0.00 | $17.44 Above median -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $17.50 | $7.57 | $25.07 -12% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $25.36 | $5.54 | $30.90 +8% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FORM WORKER | $14.04 | $0.00 | $14.04 | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $16.86 | $0.00 | $16.86 Bottom 10% -30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER, STRUCTURAL | $33.00 | $19.91 | $52.91 Above median +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $10.39 | $0.23 | $10.62 -52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FORM-STRIPPING | $18.00 | $0.35 | $18.35 Bottom 10% -17% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER | $16.83 | $0.45 | $17.28 Above median -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $12.77 | $0.00 | $12.77 -43% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE/STONE | $13.94 | $0.00 | $13.94 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $13.00 | $0.00 | $13.00 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LATHER | $13.31 | $0.00 | $13.31 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $16.32 | $0.00 | $16.32 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $24.67 | $0.00 | $24.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $16.00 | $0.00 | $16.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $17.40 | $0.00 | $17.40 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $16.38 | $0.00 | $16.38 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $20.75 | $0.00 | $20.75 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $16.24 | $1.42 | $17.66 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: SCRAPER | $19.20 | $1.52 | $20.72 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACTOR | $20.00 | $0.47 | $20.47 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $13.31 | $0.00 | $13.31 Above median -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $21.78 | $0.00 | $21.78 -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $13.67 | $0.00 | $13.67 -38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $14.33 | $0.00 | $14.33 Bottom 10% -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $18.79 | $0.00 | $18.79 -19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $16.75 | $0.93 | $17.68 Above median -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER TRUCK | $14.50 | $0.00 | $14.50 -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Pima, AZ — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Pima, Arizona.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.