Heavy Construction — Mohave, Arizona

WD AZ20260006-16023-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 TRUCK DRIVER GROUP 5- 6-AXLE DUMP FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRI in Mohave, Arizona (construction type: heavy) is $27.80/hr base + $1.65/hr fringe = $29.45/hr total package (WD AZ20260006-16023-hvy, Rev. 1).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: AZ20260006-16023-hvy
Revision: 1
Construction Type: heavy
State: Arizona (AZ)
County: Mohave
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference AZ20260006View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 TRUCK DRIVER GROUP 5- 6-AXLE DUMP FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRI $27.80 $1.65 $29.45 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $36.07 $30.59 $66.66 +83% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H $25.95 $8.49 $34.44 +21% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER ZONE PAY: ZONE A: 0-60 MILES- BASE RATE ZONE B: 61-75 MILES- BASE RATE PLUS $2.00 PER HOUR ZONE C: 75-100 MILES- BASE RATE PLUS $3.00 PER H $25.31 $8.13 $33.44 Bottom 10% +17% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $28.08 $12.74 $40.82 +56% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $28.78 $9.17 $37.95 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
DIVER: ZONE 1 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESI $43.79 $8.93 $52.72 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER: ZONE 2 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESI $45.17 $8.93 $54.10 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER: ZONE 3 ZONE DEFINITIONS: MILEAGE SHALL BE CALCULATED FROM THE CONSTRUCTION SITE TO THE CITY HALL IN PHOENIX OR TUCSON, OR TO THE WORKMEN'S RESI $48.29 $8.93 $57.22 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $16.00 $2.84 $18.84 -34% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER ZONE 1: 0 TO 50 MILES FROM CITY HALL IN PHOENIX OR TUCSON ZONE 2: 050 TO 100 MILES - ADD $4.00 ZONE 3: 100 TO 150 MILES - ADD $5.00 ZONE 4 $33.00 $19.91 $52.91 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 LABORER, GENERAL OR CONSTRUCTION; TOOL DISPATCHER OR CHECKER; MANUALLY CONTROLLED SIGNAL OPERATOR; FENCE BUILDER, GUARD RAIL BUILDER $27.41 $9.26 $36.67 +65% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 CONCRETE LABORER; CEMENT MASON TENDER; CUTTING TORCH OPERATOR; POWER TYPE CONCRETE BUGGY; BANDER; GUINEA CHASER $29.05 $9.26 $38.31 +72% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 OPERATOR AND TENDER OF PNEUMATIC AND ELECTRIC TOOLS; CONCRETE VIBRATING MACHINES, CHAIN SAW; HYDRAULIC JACKS AND SIMILAR MECHANICAL $29.91 $9.26 $39.17 +76% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 ASPHALT RAKER AND IRONER; AIR AND WATER WASHOUT NOZZLEMAN; SCALER; TAMPER; SANDBLASTER; CONCRETE SAW; CONCRETE CUTTING TORCH; GUNITE $30.88 $9.26 $40.14 +81% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 DRILL DOCTOR AND/OR AIR TOOL REPAIRMAN; SCALER; FORM SETTER AND/OR BUILDER; WELDER AND/OR PIPELAYER INSTALLING PROCESS PIPING; DRILL $31.98 $9.26 $41.24 +86% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $25.47 $8.00 $33.47 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $27.38 $12.44 $39.82 Bottom 10% $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $54.15 $19.80 $73.95 Above median +148% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 A-FRAME BOOM TRUCK, WINCH TRUCK, AIR COMPRESSOR, BELTCRETE, BORING BRIDGE AND TEXTURE, CONCRETE MIXER, CONDUCTOR, BR $27.04 $11.72 $38.76 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 AGGREGATE PLANT, ASPHALT PLANT MIXER, ASPHALT LAYDOWN MACHINE, BACKHOE, BEE GEE OPERATOR BORING MACHINE, CONCRETE BA $30.31 $11.72 $42.03 Top 10% +46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANE OPERATOR, SKIP LOADER, UNIVERSAL EQUIPMENT OPERATOR MULTIPLE-UNIT EARTH EQUIPMENT, TRACTOR OPERATOR, PNEUMATIC $32.42 $11.72 $44.14 Top 10% +53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2: 2 OR 3 AXLE DUMP , WATER TRUCK UNDER 2500 GAL. FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS $26.95 $1.65 $28.60 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3- 4 AXLE DUMP, WATER TRUCK DRIVE- FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1 $27.43 $1.65 $29.08 Top 10% +13% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 4- 5 AXLE DUMP, WATER TRUCK 4000 GAL AND OVER FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF S $28.68 $1.65 $30.33 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 6- 7-AXLE DUMP, 8-AXLE DUMP FOOTNOTE: HEALTH & WELFARE $1,330.26 PER MONTH IN ADDITIONAL FRINGE BENEFITS. AS OF SEPTEMBER 1, 2024 $29.47 $1.65 $31.12 Top 10% +21% vs market $0.00 $0.00 $0.00 $0.00
WITH BOOM ATTACHMENT AND SLOPE BAR, DERRICK, GRADALL, HEAVY DUTY MECHANIC/WELDER, HELICOPTER HOIST OPERATOR OR PILOT, HIGHLINE CABLEWAY, MASS EXCAVATO $31.39 $11.72 $43.11 Top 10% $0.00 $0.00 $0.00 $0.00
ZONE 3: 50 MILES AND OVER $40.61 $17.53 $58.14 Top 10% $0.00 $0.00 $0.00 $0.00
ZONE 3: 50 MILES AND OVER $28.49 $8.93 $37.42 Above median $0.00 $0.00 $0.00 $0.00
ZONE 3: 50 MILES AND OVER $25.37 $8.93 $34.30 $0.00 $0.00 $0.00 $0.00
ZONE 3: 50 MILES AND OVER $22.98 $8.93 $31.91 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mohave, AZ — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Mohave

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AZ20260006-16023-hvy →