Highway Construction — Maricopa, Arizona

WD AZ20260045-15848-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, EXCLUDES FORMWORK CONCRETE in Maricopa, Arizona (construction type: highway) is $35.89/hr base + $14.98/hr fringe = $50.87/hr total package (WD AZ20260045-15848-hwy, Rev. 1).

Scroll down for all 48 trade classifications covered by this determination.

WD Number: AZ20260045-15848-hwy
Revision: 1
Construction Type: highway
State: Arizona (AZ)
County: Maricopa
Effective: May 17, 2026
Trades covered: 48
Official source: SAM.gov reference AZ20260045View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, EXCLUDES FORMWORK CONCRETE $35.89 $14.98 $50.87 +94% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: FORMWORK CONCRETE $29.86 $8.89 $38.75 +48% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.41 $0.00 $30.41 +10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $29.00 $7.58 $36.58 +28% vs market $0.00 $0.00 $0.00 $0.00
GENERAL LABORERS $27.41 $9.26 $36.67 $0.00 $0.00 $0.00 $0.00
IRONWORKER $33.00 $19.91 $52.91 +83% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $29.91 $9.26 $39.17 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $25.22 $5.08 $30.30 +36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FENCE ERECTOR $27.41 $9.26 $36.67 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE SETTER $29.91 $9.26 $39.17 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GUARDRAIL INSTALLER $29.91 $9.26 $39.17 +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE LABORER $19.00 $6.34 $25.34 +14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $25.92 $7.09 $33.01 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $25.97 $7.09 $33.06 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: PAVEMENT MARKING $23.35 $6.34 $29.69 +31% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SIGN AND DISPLAY ERECTOR $18.03 $0.00 $18.03 Bottom 10% -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/BACKHOE & LOADER COMBO/TRACK BACKHOE $35.56 $18.12 $53.68 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $29.91 $9.11 $39.02 Bottom 10% +35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOOM/CRANE TRUCK $43.11 $10.87 $53.98 +87% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BROOM/SWEEPER $25.95 $6.62 $32.57 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER $30.24 $0.00 $30.24 +5% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CONCRETE PUMP TRUCK $43.11 $10.87 $53.98 +87% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CONCRETE SCREED $26.41 $7.64 $34.05 Top 10% +18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE/DERRICK $36.64 $18.12 $54.76 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL RIG/AUGER $36.80 $13.07 $49.87 +73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE $36.64 $18.12 $54.76 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FIELD EQUIPMENT SERVICEPERSON $35.56 $18.12 $53.68 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $30.88 $9.26 $40.14 +39% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADE CHECKER $36.64 $18.12 $54.76 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: HORIZONTAL DIRECTIONAL DRILL $31.98 $9.26 $41.24 Top 10% +43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $37.67 $18.12 $55.79 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE $31.16 $0.00 $31.16 Above median +8% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE $36.64 $18.12 $54.76 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $32.29 $18.12 $50.41 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT $32.67 $0.00 $32.67 Above median +13% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCRAPER $29.69 $0.00 $29.69 Above median +3% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR $35.56 $18.12 $53.68 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRENCHER $30.88 $9.26 $40.14 Above median +39% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL $27.41 $9.26 $36.67 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE $30.88 $9.26 $40.14 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $26.71 $7.09 $33.80 Above median +31% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF ROAD TRUCK $35.56 $18.12 $53.68 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR $29.41 $7.63 $37.04 +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SWEEPER $20.24 $5.48 $25.72 +0% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER $30.88 $9.26 $40.14 Top 10% +56% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Maricopa, AZ — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Maricopa

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AZ20260045-15848-hwy →