Highway Construction — Greenlee, Arizona

WD AZ20260031-16205-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER: FORMWORK CONCRETE in Greenlee, Arizona (construction type: highway) is $33.16/hr base + $10.71/hr fringe = $43.87/hr total package (WD AZ20260031-16205-hwy, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: AZ20260031-16205-hwy
Revision: 1
Construction Type: highway
State: Arizona (AZ)
County: Greenlee
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference AZ20260031View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER: FORMWORK CONCRETE $33.16 $10.71 $43.87 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $39.50 $19.91 $59.41 +106% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $29.91 $9.26 $39.17 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GENERAL $31.66 $6.99 $38.65 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $29.91 $9.26 $39.17 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $31.98 $9.26 $41.24 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SIGN AND DISPLAY ERECTOR $19.06 $2.99 $22.05 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $35.56 $18.12 $53.68 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER $32.53 $0.00 $32.53 Bottom 10% +13% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER $26.91 $5.13 $32.04 +11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CONCRETE SCREED $33.90 $0.00 $33.90 Above median +18% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE / DERRICKS $48.32 $14.18 $62.50 +117% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE $39.48 $0.00 $39.48 Bottom 10% +37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $38.76 $9.20 $47.96 +67% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER $39.20 $0.00 $39.20 +36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE $36.90 $3.81 $40.71 +41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $31.86 $10.01 $41.87 Above median +45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT $30.40 $0.06 $30.46 Bottom 10% +6% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL $20.69 $2.77 $23.46 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP $24.50 $2.75 $27.25 +6% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER $29.52 $3.47 $32.99 Bottom 10% +28% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Greenlee, AZ — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Greenlee

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AZ20260031-16205-hwy →