Residential Construction — Coconino, Arizona

WD AZ20260005-15846-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Coconino, Arizona (construction type: residential) is $10.00/hr base + $0.00/hr fringe = $10.00/hr total package (WD AZ20260005-15846-res, Rev. 1).

Scroll down for all 12 trade classifications covered by this determination.

WD Number: AZ20260005-15846-res
Revision: 1
Construction Type: residential
State: Arizona (AZ)
County: Coconino
Effective: May 17, 2026
Trades covered: 12
Official source: SAM.gov reference AZ20260005View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $10.00 $0.00 $10.00 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $8.96 $0.00 $8.96 Bottom 10% -68% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $12.76 $0.00 $12.76 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $11.00 $0.00 $11.00 -51% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR, BATT & BLOWN $7.25 $0.00 $7.25 -68% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL $7.25 $0.00 $7.25 Bottom 10% -67% vs market $0.00 $0.00 $0.00 $0.00
LATHER $10.00 $0.00 $10.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $8.79 $0.00 $8.79 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $10.00 $0.00 $10.00 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $11.07 $0.00 $11.07 Bottom 10% -63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE $8.75 $0.00 $8.75 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $8.76 $0.00 $8.76 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Coconino, AZ — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Coconino

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AZ20260005-15846-res →