The Davis-Bacon prevailing wage for AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN in Dillingham, Alaska (construction type: heavy) is $46.37/hr base + $34.26/hr fringe = $80.63/hr total package (WD AK20260001-17990-hvy, Rev. 1).

Scroll down for all 74 trade classifications covered by this determination.

WD Number: AK20260001-17990-hvy
Revision: 1
Construction Type: heavy
State: Alaska (AK)
County: Dillingham
Effective: May 17, 2026
Trades covered: 74
Official source: SAM.gov reference AK20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN $46.37 $34.26 $80.63 Top 10% $0.00 $0.00 $0.00 $0.00
AND RAISES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR; DRILLERS; POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER; PIPELAYERS $51.18 $34.26 $85.44 Top 10% $0.00 $0.00 $0.00 $0.00
AND RAISES) ASPHALT WORKERS; BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABOR $44.28 $34.26 $78.54 Top 10% $0.00 $0.00 $0.00 $0.00
AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CURED I $45.38 $34.26 $79.64 Top 10% $0.00 $0.00 $0.00 $0.00
AND RAISES) GRADE CHECKER $59.41 $28.81 $88.22 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR $41.35 $16.46 $57.81 Above median +198% vs market $0.00 $0.00 $0.00 $0.00
ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR; DRILLERS; POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER; PIPELAYERS $46.53 $34.26 $80.79 Top 10% $0.00 $0.00 $0.00 $0.00
BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN $42.15 $34.26 $76.41 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $58.33 $28.79 $87.12 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER, BLOCKLAYER, STONEMASON, MARBLE MASON, TILE SETTER, TERRAZZO WORKER $52.77 $12.36 $65.13 Top 10% $0.00 $0.00 $0.00 $0.00
BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER; CRUSHER PLANT LABORER; DE $40.25 $34.26 $74.51 Top 10% $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $55.44 $30.33 $85.77 Above median $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $74.34 $35.70 $110.04 Above median $0.00 $0.00 $0.00 $0.00
CARPENTER $50.79 $26.42 $77.21 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $49.28 $22.28 $71.56 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS $29.82 $34.26 $64.08 Top 10% $0.00 $0.00 $0.00 $0.00
DIVER DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VE $53.03 $25.34 $78.37 Bottom 10% $0.00 $0.00 $0.00 $0.00
DIVER DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VE $61.42 $25.34 $86.76 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $55.44 $30.33 $85.77 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $39.48 $16.25 $55.73 Top 10% +15% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $46.76 $30.46 $77.22 Above median +174% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $47.42 $29.10 $76.52 Above median +171% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $37.38 $19.55 $56.93 Above median $0.00 $0.00 $0.00 $0.00
HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR $71.44 $38.44 $109.88 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.48 $39.48 $83.96 Top 10% +115% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $43.48 $39.48 $82.96 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $46.98 $39.48 $86.46 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $47.89 $39.48 $87.37 Top 10% +124% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.22 $39.48 $83.70 Top 10% +114% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 ASPHALT WORKERS; BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE $40.25 $34.26 $74.51 Top 10% +167% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CU $41.25 $34.26 $75.51 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE $42.15 $34.26 $76.41 Top 10% +174% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3A ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR; DRILLERS; POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER; PIPELAYERS $46.53 $34.26 $80.79 Top 10% +190% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3B GRADE CHECKER $54.01 $28.81 $82.82 Top 10% +197% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 4 FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS $29.82 $34.26 $64.08 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 1 ASPHALT WORKERS; BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER $44.28 $34.26 $78.54 Top 10% +182% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3 ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTI $46.37 $34.26 $80.63 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3A ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR; DRILLERS; POWDERMAN; PIONEER DRILLING AND DRIL $51.18 $34.26 $85.44 Top 10% +207% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3B GRADE CHECKER $59.41 $28.81 $88.22 Top 10% +217% vs market $0.00 $0.00 $0.00 $0.00
LINEMEN: LINE CONSTRUCTION $72.59 $35.65 $108.24 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $56.44 $25.87 $82.31 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH/ROLLER PAINT OR WALL COVERER $43.05 $26.45 $69.50 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: GENERAL PAINTER $37.29 $30.20 $67.49 Top 10% +114% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: INDUSTRIAL PAINTER $38.64 $30.20 $68.84 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: TAPER / PAPER & VINYL HANGER $38.54 $30.20 $68.74 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: TAPING, TEXTURING, STRUCTURAL PAINTING, SANDBLASTING, POT TENDER, FINISH METAL, SPRAY, BUFFER OPERATOR, RADON MITIGATION, LEAD BASED PAINT AB $43.57 $26.45 $70.02 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER $54.28 $26.42 $80.70 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVER $48.72 $26.42 $75.14 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVER $ 48.72 26.42 DIVER DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSU $92.83 $26.42 $119.25 Top 10% $0.00 $0.00 $0.00 $0.00
PLASTERER $49.28 $22.28 $71.56 Top 10% $0.00 $0.00 $0.00 $0.00
POWDERMAN, LINE CONSTRUCTION $70.59 $35.59 $106.18 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER; BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM $51.46 $29.50 $80.96 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE; BELTCRETE WITH POWER PACK AND SIMILAR CONV $53.23 $29.50 $82.73 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS; HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORI $52.32 $29.50 $81.82 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR CAMERA/TOOL/VIDEO OPERATOR, CRANES-OVER 45 TONS OR 150 FOOT: CLAMSHELLS AND DRAGLINES, TOWER CRANES; LICENSED WATER/WASTE WAT $55.33 $29.50 $84.83 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1A CAMERA/TOOL/VIDEO OPERATOR, CRANES-OVER 45 TONS OR 150 FOOT: CLAMSHELLS AND DRAGLINES, TOWER CRANES; LICENSED WATER/ $60.86 $29.50 $90.36 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS; HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGE $57.55 $29.50 $87.05 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER; BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSO $56.60 $29.50 $86.10 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER; SPOTTER; STEAM CLEANER; DRILL HELPER. FO $48.47 $29.50 $77.97 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER; SPOTTER; STEAM CLEANER; DRILL HELPER. FOOTNOTE $44.06 $29.50 $73.56 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $52.07 $19.62 $71.69 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $52.08 $30.81 $82.89 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $58.73 $29.54 $88.27 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $60.67 $31.39 $92.06 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO FINISHER $40.91 $12.48 $53.39 Top 10% $0.00 $0.00 $0.00 $0.00
TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL $41.25 $34.26 $75.51 Top 10% $0.00 $0.00 $0.00 $0.00
TREE TRIMMER, LINE CONSTRUCTION $42.23 $30.10 $72.33 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER BUGGYMOBILE; SEMI OR TRUCK AND TRAILER; DUMPSTER; TIREMAN; DUMP TRUCKS UP TO AND INCLUDING 10 YARDS; TRACK TRUCK EQUIPMENT; GREASE TRUCK $48.50 $26.43 $74.93 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER DUMP TRUCKS OVER 10 YARDS UP TO AND INCLUDING 20 YARDS; BATCH TRUCKS 8 YARDS AND UP; OIL DISTRIBUTOR DRIVERS; OIL DISTRIBUTOR DRIVERS; TR $49.17 $26.43 $75.60 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GRAVEL SPREADER BOX OPERATOR ON TRUCK; FLAT BEDS, SINGLE REAR AXLE; BOOM TRUCK/KNUCKLE TRUCK UP TO AND INCLUDING 5 TONS; PICKUPS; WATER W $47.62 $26.43 $74.05 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
TRUCK/HEAT STRESS TRUCK; READY-MIX OVER 7 YARDS UP TO AND INCLUDING 12 YARDS; PARTSMAN; STRINGING TRUCK $50.12 $26.43 $76.55 Top 10% $0.00 $0.00 $0.00 $0.00
TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM $58.55 $29.50 $88.05 Top 10% $0.00 $0.00 $0.00 $0.00
WAGON; TIREMAN, HEAVY DUTY/FUELER $51.58 $26.43 $78.01 Top 10% $0.00 $0.00 $0.00 $0.00
WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS $45.38 $34.26 $79.64 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dillingham, AK — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dillingham

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AK20260001-17990-hvy →