Residential Construction — Bristol Bay, Alaska

WD AK20260005-17989-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN in Bristol Bay, Alaska (construction type: residential) is $46.37/hr base + $34.26/hr fringe = $80.63/hr total package (WD AK20260005-17989-res, Rev. 1).

Scroll down for all 47 trade classifications covered by this determination.

WD Number: AK20260005-17989-res
Revision: 1
Construction Type: residential
State: Alaska (AK)
County: Bristol Bay
Effective: May 17, 2026
Trades covered: 47
Official source: SAM.gov reference AK20260005View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN $46.37 $34.26 $80.63 Top 10% $0.00 $0.00 $0.00 $0.00
AND RAISES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR; DRILLERS; POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER; PIPELAYERS $51.18 $34.26 $85.44 Top 10% $0.00 $0.00 $0.00 $0.00
AND RAISES) ASPHALT WORKERS; BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABOR $44.28 $34.26 $78.54 Top 10% $0.00 $0.00 $0.00 $0.00
AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CURED I $45.38 $34.26 $79.64 Top 10% $0.00 $0.00 $0.00 $0.00
AND RAISES) GRADE CHECKER $59.41 $28.81 $88.22 Top 10% $0.00 $0.00 $0.00 $0.00
ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR; DRILLERS; POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER; PIPELAYERS $46.53 $34.26 $80.79 Top 10% $0.00 $0.00 $0.00 $0.00
BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN $42.15 $34.26 $76.41 Top 10% $0.00 $0.00 $0.00 $0.00
BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER; CRUSHER PLANT LABORER; DE $40.25 $34.26 $74.51 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $17.68 $0.00 $17.68 -44% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.00 $0.00 $20.00 -56% vs market $0.00 $0.00 $0.00 $0.00
CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS $29.82 $34.26 $64.08 Top 10% $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $20.10 $0.00 $20.10 Above median $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $15.00 $0.00 $15.00 Above median -58% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN/WIREMAN $17.45 $3.18 $20.63 Top 10% -48% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $13.18 $0.00 $13.18 Above median $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $20.64 $0.00 $20.64 -57% vs market $0.00 $0.00 $0.00 $0.00
INSTALLER $18.55 $0.00 $18.55 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL $13.88 $0.00 $13.88 Above median -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 ASPHALT WORKERS; BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE $40.25 $34.26 $74.51 Top 10% +167% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CU $41.25 $34.26 $75.51 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE $42.15 $34.26 $76.41 Top 10% +174% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3A ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR; DRILLERS; POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER; PIPELAYERS $46.53 $34.26 $80.79 Top 10% +190% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3B GRADE CHECKER $54.01 $28.81 $82.82 Top 10% +197% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 4 FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS $29.82 $34.26 $64.08 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 1 ASPHALT WORKERS; BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER $44.28 $34.26 $78.54 Top 10% +182% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3 ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTI $46.37 $34.26 $80.63 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3A ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR; DRILLERS; POWDERMAN; PIONEER DRILLING AND DRIL $51.18 $34.26 $85.44 Top 10% +207% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3B GRADE CHECKER $59.41 $28.81 $88.22 Top 10% +217% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $20.60 $4.47 $25.07 -21% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $14.00 $0.00 $14.00 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $22.80 $0.00 $22.80 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER; BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM $51.46 $29.50 $80.96 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE; BELTCRETE WITH POWER PACK AND SIMILAR CONV $53.23 $29.50 $82.73 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS; HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORI $52.32 $29.50 $81.82 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR CAMERA/TOOL/VIDEO OPERATOR, CRANES-OVER 45 TONS OR 150 FOOT: CLAMSHELLS AND DRAGLINES, TOWER CRANES; LICENSED WATER/WASTE WAT $55.33 $29.50 $84.83 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1A CAMERA/TOOL/VIDEO OPERATOR, CRANES-OVER 45 TONS OR 150 FOOT: CLAMSHELLS AND DRAGLINES, TOWER CRANES; LICENSED WATER/ $60.86 $29.50 $90.36 Top 10% +151% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS; HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGE $57.55 $29.50 $87.05 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER; BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSO $56.60 $29.50 $86.10 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER; SPOTTER; STEAM CLEANER; DRILL HELPER. FO $48.47 $29.50 $77.97 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER; SPOTTER; STEAM CLEANER; DRILL HELPER. FOOTNOTE $44.06 $29.50 $73.56 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $19.27 $0.00 $19.27 -37% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $16.79 $0.00 $16.79 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL $41.25 $34.26 $75.51 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $17.56 $0.00 $17.56 Above median -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ( DUMP, OVER 8 YARDS) $48.50 $26.43 $74.93 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM $58.55 $29.50 $88.05 Top 10% $0.00 $0.00 $0.00 $0.00
WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS $45.38 $34.26 $79.64 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Bristol Bay, AK — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Bristol Bay

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for AK20260005-17989-res →